USPFO for Idaho
  • Welcome to the Pre-Bid Conference

2
Introduction Whos Here?
  • USPFO Contracting Personnel
  • Potential Bidders and Key Representatives
  • Architect Engineer Design Firm HDR Engineering
  • Government Construction Inspector
  • Base Civil Engineer/ Construction Facility
    Maintenance Officer

3
The National Guard
  • Both Federal State Organization
  • As Federal exempt from local building
    permits/inspections
  • As Federal- Davis Bacon Wages Apply

4
Solicitation Number
  • W912J7-08-B-0001
  • Construct Railhead Phase 1 2

5
Scheme and Concept of Project
  • Bidders required to extract best solution to
    blend requirements of two phases
  • Government intends to award Phase 1 2 Two line
    items required due to 2 separate congressional
    appropriations

6
Scheme and Concept of Project
  • As noted in Synopsis Contract Award cant occur
    until final Declaration of Taking signed by DOJ
    on Land
  • Must Register at 2 websites for complete
    information. www.nationalguardcontracting.org
    and www.fbo.gov
  • As stated in Solicitation all questions
    concerning project must be in writing.

7
RFIS
  • Error in Solicitation ABI 003 references the
    scale as Option 002 on plans and should refer to
    Option 003 on Plans
  • Clause 52.228-1 Bid Guarantee on page 25 of
    Solicitation indicates 100 The Bid Bond Amount
    should be 20 not 100

8
RFIS
  • Changes to Track Sheets T101 T102 T103 and T106.
    Provides actual Track Footage at 24,249TF
  • Addendum to be issued with minutes of this
    meeting.
  • Addendum posted to NGB site and plans to FBO
    site.

9
SAFETY
  • OSHA Regulations
  • Contractor Responsibility for Compliance
  • EM 385-1-1 USACE Safety Health Requirements
  • Base Safety Personnel
  • Designated Smoking Areas

10
ENVIRONMENTALPOLICY
  • The Idaho National Guard is a trained,
    professional force ready to accomplish its
    mission with citizen soldiers and airmen
    committed to preserving the timeless traditions
    and values of service to our nation and
    communities. While demonstrating sound
    environmental stewardship, our mission is to
    maintain properly trained, equipped, and
    disciplined forces for domestic emergencies,
    homeland security missions, or for prompt
    mobilization for conflicts around the world.
  • The Idaho National Guard is committed to
    pollution prevention. The Idaho National Guard
    will comply, and where practical, exceed relevant
    environmental laws, regulations, and other
    environmental requirements. This will be
    accomplished by using environmental management
    procedures to improve and monitor our
    environmental performance.

11
ENVIRONMENTALPOLICY
  • Personnel are expected to be stewards of
    environmental protection by being responsible for
    understanding and implementing current
    procedures, practices and policies and by
    bringing deficiencies of operations to the
    attention of top management for correction.
  • We will work aggressively with local, state, and
    federal agencies, environmental interest groups,
    and private industry in order to communicate to
    the public our goal of long term environmental
    quality and improvement.
  • We pledge to monitor our performance as an
    ongoing activity and provide a framework for
    establishing and reviewing quality and
    environmental objectives and targets.

12
ENVIRONMENTALPOLICY
  • The Idaho National Guard will utilize the
    applicable regulations to direct the
    environmental management system and environmental
    policy. These policies specify how units,
    activities and services members monitor and
    improve their respective environmental programs
    and enhance overall environmental stewardship of
    the environment for the Idaho National Guard.
  • SIGNED
  • LAWRENCE F. LAFRENZ
  • MAJOR GENERAL
  • COMMANDING GENERAL IDAHO

13
Utilities
  • Phone/Facsimile Contractor Furnished
  • Water Non Potable for construction furnished by
    Government _at_ well head. Contractor responsibility
    to get to project site.
  • Power Contractor Furnished
  • Other Concerns

14
PERMITS
  • AS REQUIRED
  • EPA Required Stormwater Discharge Plan

15
SECURITY
  • Security of Equipment and materials contractor
    responsibility.
  • Equipment often the target of Vandals.
  • MATES proximity and roving MP Patrols will help
    mitigate but may not eliminate.

16
Architect Engineer Contacts
  • Contact with A-E is reserved for Contracting
    Officer only.
  • Bidder inquiries for A-E must be routed thru
    Contracting Officer (RFIS)

17
Function and Authority of U.S. Government
Personnel
  • Government Team

18
Contracting Officer
  • Only Person with the authority to bind the
    Government
  • Contracting Officers
  • Jerry DeWeerd jerry.deweerd_at_id.ngb.army.mil
  • Kevin Thompson kevin.thompson_at_id.ngb.army.mil

19
Contract Specialist
  • Administers the contract
  • Responsible to assure compliance with Federal
    Acquisition Regulations
  • Kevin Thompson

20
Project Inspector A-E
  • Serves as Contracting Officers technical
    representative.
  • Has NO AUTHORITY to authorize any changes in
    project plans or specifications.
  • A-E has responsibility for the Plans and
    Specifications and will be consulted prior to
    authorizing any changes thereto.

21
Schedule
  • 730 Calendar Days (24 Months)

22
Labor Policies

23
Davis Bacon Act Requirements
  • 2 Wage Decisions incorporated. ID20080002
    Building and ID20080014 Highway should cover
    majority of classifications needed.

24