Title: Energy Curtailment Specialists, Inc'


1
Energy Curtailment Specialists, Inc.
? Stamford, CT ? Boston, MA ? San Francisco, CA ?
Los Angeles, CA ? San Diego, CA
? New York City ? Long Island ? Buffalo ? Albany
Energy Curtailment Specialists, Inc.
www.ecsny.com
2
ECS
Demand Response An Aggregators Perspective
Energy Curtailment Specialists, Inc.
www.ecsny.com
3
ECS Background
  • Full service demand response provider
  • Demand response audits
  • EMS engineering studies
  • Advanced metering technologies
  • Founded in 2001
  • In response to electric reliability concerns
  • Assist New York State in avoiding blackouts

Energy Curtailment Specialists, Inc.
www.ecsny.com
4
ECS Experienced Senior Staff
  • Marie Pieniazek, VP, Strategic Operations
  • Responsibility
  • NYISO Market Issues
  • Analysis of New Markets
  • Former Lead Analyst at NYISO
  • Administrator of 750 million capacity market
  • Implemented demand curve rules into ICAP Market
  • Bob Boyle, VP, Market Development
  • Responsibility
  • Develops ECS in New Markets
  • Former Supervisor at NYISO in Audit Compliance
  • Marketing
  • Performance and economic consulting to large
    utility generators

Energy Curtailment Specialists, Inc.
www.ecsny.com
5
Operation Save New YorkMarket Penetration
  • 500 MW actual load taken offline in emergency
  • Projected to grow to gt625 MW by summer 2008

Energy Curtailment Specialists, Inc.
www.ecsny.com
6
Energy Curtailment Specialists, Inc.
Demand Response Case Study
Energy Curtailment Specialists, Inc.
www.ecsny.com
7
  • Participant in Operation Save New York since 2004
  • Type of facility
  • Paper printing and circulation facility
  • Summer on-peak load 2.3 MW

Energy Curtailment Specialists, Inc.
www.ecsny.com
8
  • Step 1 Identify curtailment ability
  • Evaluate the facility - 425,000 sq ft
  • Demand response audits
  • Energy management system study
  • Interfacing with generators
  • Lighting
  • Printing presses
  • Evaluating flexibility upon day ahead notice

Energy Curtailment Specialists, Inc.
www.ecsny.com
9
  • Step 2 Make preparations for event
  • long term
  • Identify load that will be curtailed during event
  • Identify and overcome obstacles
  • Written action plan for staff

Energy Curtailment Specialists, Inc.
www.ecsny.com
10
  • Step 3 Day ahead notification
  • Implementation of action plan
  • Internal notification to entire company
  • Director of Operations meets with staff
  • Discuss at the meeting
  • Time start and finish
  • Equipment required to shed
  • Production schedule
  • Use all existing enhancements and sequence
    of operation
  • Coordination and communication on channel
    7
  • All announcements on phone for PC shutdown
  • Notification to Cafeteria
  • Concerns
  • Attendance is required for following people and
    departments
  •   Director of Operation
  • General foreman Electrician
  • Chief Operating Engineer
  • Production Manager on duty

Energy Curtailment Specialists, Inc.
www.ecsny.com
11
  • Step 4 Event day
  • Shedding of load begins 1 hour before event
    start time
  • IT Technician on duty starts
    power down of the following listed PCs
  • - Stripping benches
  • FMC server and client
  • Inserter win links
  • Copy machines / printers in control room
  • Q/A office HP Designer Jet color proofer IT
    technician powers down PCs / servers
  • - Upon completion of power down
    reports to Foreman Electrician on duty
  • Operating Engineers
  • Shed all chillers and related pumps
  • Air Handling Units
  • Vacuum pumps
  • Minimize down time to the minimum for Compressor
    shutdown, Vacuum pumps
  • Start emergency compressor to keep up house
    pressure
  • Upon completion report to electrician foreman
    on duty

12
  • Event day continued
  • Electricians
  • Check status of all UPSs (Data center, Diamond
    Setters, Honeywell process modules, GUS, House
    UPS)
  • Shed high bay lighting
  • Mailroom
  • Newsprint warehouse
  • Drive Through 
  • Production Equipment
  • Stripping benches 1 and 2
  • 1.Buffers
  • 2. Unwind Stations Shut
    down touch screens and then power down
  • 3. 365 Conveyors
    machines in that order
  • 4. Inserters
  •  
  • Shut down Life Safety generator.
  • After verifying with all involved departments on
    clearance, switch over to emergency power

13
  • Event day continued
  • Make announcement to entire bldg, and on the
    radio.
  • Generator Power has been accomplished.
  • You can turn your computers back on.
  • Copy machines
  • Printers
  • We will return to Con Ed Power at 6 PM
  • Thank you for your continued cooperation
  • Verification via secure channel and PA system

Energy Curtailment Specialists, Inc.
www.ecsny.com
14
  • Step 5 Results
  • July 18th 19th, 2006
  • Target 128 kW or below
  • (i.e. goal is to get down to 128 kW or below)
  • Duration at least 4 hours each day

Energy Curtailment Specialists, Inc.
www.ecsny.com
15
Performance July 18, 2006
Energy Curtailment Specialists, Inc.
www.ecsny.com
16
Performance July 19, 2006
Energy Curtailment Specialists, Inc.
www.ecsny.com
17
Benefits of Participation
  • for capacity (commitment to curtail)
  • for energy (based on price hours)
  • NY Post has generated a significant revenue
    stream over past 3 years
  • Protects equipment against voltage fluctuations
  • Help prevent blackouts
  • Environmental benefits
  • Interval metering can be used for energy
    management

18
New York Postis a proud, long standing
blackout buster!
Energy Curtailment Specialists, Inc.
www.ecsny.com