Title: Community Wastewater Alternatives


1
(No Transcript)
2
Community Wastewater Alternatives for Bean
Blossom, Indiana
Monarch Engineering October 9, 2002
3
Introduction
  • Josh Reed, Project Manager
  • Introduction/Conclusion
  • Michael Novotney, Project Engineer
  • Project Description
  • Jordan Aigner, Project Engineer
  • Design Requirements/Project Approach
  • Larry Robbins, Proposal Editor
  • Work Schedule/Project Fee

4
Project Description
  • Background
  • Indiana Rural Communities Assistance Program
  • - Mission To improve the quality of
    life by providing safe drinking water and
    adequate wastewater treatment. -
    Assisted 910,000 people in the last two years.
  • - Currently working with over 40 communities,
    including the community of Bean Blossom,
    Indiana.

5
Project Description
  • Client and Project Information
  • Bean Blossom
  • - Rural Community in Brown County, Indiana.

- Home to approximately 160 residents and
numerous music festivals throughout the year.
6
Project Description
  • Client and Project Information
  • Wastewater Problems
  • - Residents currently use septic systems for
    wastewater treatment and disposal.
  • - Septic systems have failed.
  • - Concerned citizens have organized themselves
    into the Bean Blossom Wastewater Project
    Committee.
  • Bean Blossoms Options
  • - Connect to the Helmsburg Regional Sewer
    District.
  • - Construct an on-site treatment and collection
    system.
  • Monarch will work with the committee and IN-RCAP
    to find the right solution for Bean Blossom.

7
Design Requirements
  • Meetings with IN-RCAP and the BBWWPC have
    identified the design requirements for the
    project.
  • Project Scope
  • Review R.W. Armstrong PER
  • - Re-evaluate connection to the HRSD.
  • Produce a Preliminary Engineering Report
  • - Investigate wastewater treatment
    alternatives.
  • - Identify and evaluate a variety of feasible
    solutions.
  • - Recommend a treatment option that will best
    meet the needs of the community.

8
Design Requirements
  • Objectives
  • Preliminary Project Investigation
  • Evaluate Connection to the HRSD
  • Evaluate Alternative Collection and Treatment
    Solutions
  • Deliverables
  • Preliminary Engineering Report
  • Constraints
  • Money
  • Time

9
Project Approach
  • Three categories of tasks have been outlined to
    ensure fulfillment of the design requirements.
  • 1) Preliminary Project Investigation
  • Preliminary Site Assessment
  • - Pertinent map collection and analysis.
  • - Site reconnaissance.
  • Needs Assessment
  • - Design criteria determination.
  • - Pertinent codes and regulation investigation.
  • - Community input and opinion assessment.

10
Project Approach
  • 2) Evaluate Connection to the HRSD
  • Evaluate and summarize existing PER
  • Analyze advantages/disadvantages
  • 3) Evaluate Alternative Collection and Treatment
  • Solutions
  • Identify Technically Feasible Options
  • Identify Economically Feasible Options
  • Detailed Cost Analysis and Recommendations
  • Design of Recommended Alternatives

11
Schedule of Work
12
Consulting Fee
13
Summary
  • Project Description
  • - Background
  • - Project/Client Information
  • Design Requirements
  • - Evaluate Existing PER
  • - Produce Preliminary Engineering Report
  • Project Approach
  • Schedule of Work
  • Consulting Fee
  • Monarch will work with the BBWWPC and IN-RCAP to
    find the right solution for Bean Blossom.

14