Title: Status of ZDC Yasa


1
Status of ZDC Yasa Michael for ZDC group, KU,
Iowa, UIC 20th September 2008
  • Integration close
  • Safe operation OK
  • Grounding Tolerable
  • Firmware Needs to be tested
  • Luminosity After HF
  • Software Started but lots to do
  • Lift fixture Working on final design

2
Integration
DSS
DCS
HiVolt
LoVolt
S4F02
HV
GT
signal
LVDS
Vertex
0.1 0.9
Laser
QIE
CCM
RBX manager
141ns -
ZDC
S2E13
S2C07
Tunnel
RecHits
LUT
DQM
Map
HTR
DCC
S2F18
Lumi Server
LHC
E,E-
Timing
HLX
GCT
S1E04
S2F07
3
Safe Operation
  • After technical inspection in August we have
    covered all action items except for High
    Voltage signs in tunnel.
  • In addition we will install a safety ground
    between ZDC and TAN based on zener diodes. This
    will be done during shutdown.
  • Alain Cordonnier has installed DSS interlocks for
    low and high voltage.
  • Michael has submitted some procedures to Archana
  • Cables have official numbers that are listed in
    database

4
Grounding
  • Layout was designed to minimize radiation load
  • Signal and HV cables connect S2E13 and tunnel
  • We had a coffee meeting with Laza, Magnus et
    al
  • Magnus would prefer that we not get HV and LV
    from S24F02 but rather keep everything at S2E13
  • We would like to work on this over the winter
    shutdown. In the meantime Michael can write a
    simple procedure for disconnecting the ZDC if it
    is thought to be contaminating other detectors.

5
Firmware
  • Drew Barden and John Jones have written firmware
    to great E, E-, Multiplicity - and coincidence
    of and - for Lumi
  • This still needs to be tested.
  • We still need LUTs to linearize ZDC based on
    parameters used in test beam.
  • Michael has started talking with Greg Landsberg
    and Gena Kukartsev and will try to finish this
    week

6
Luminosity
  • ZDC E and E- should now be available to server.
  • Testing can start once Lumi group feels that the
    rest of the system is under control
  • Oleg Grachov will work with Princeton group on
    this when he comes in October.
  • ZDC, like HF, will be incorporated into lumi
    function manager so that it can be continuously
    providing lumi data.

7
Software
  • From Cruzet4 Mayda, Steve found significant noise
    1-2GeV on pedestal. This is comparable to that
    seen in test beam. It is not from splitter box
    but probably from pickup on 208m of cable.
  • For beam splash events near ZDC, 10m!, was
    saturated but far one 290m from collimator saw
    nothing.
  • Urgent need now to set timing of ZDC wrt beam
    clock
  • We could start with dead reckoning and also look
    on scope.
  • Jason StJohn setting up ZDC DQM framework, Alexi
    Mestvirishvili will be looking at data
  • We are requesting that raw data also be stored
    offline
  • We need help on defining offline packages to
    make ZDC physics objects.

8
Lift Fixture
  • Paul Debbins is finalizing design. We hope to
    have make a presentation to Austin TS group
    early October.
  • We will also have to lift out BRAN.
  • Sarchophagus will be mostly marble.
  • Aiming to have this in for February.