Title: Tail production: Choosing the right strategy for Produced Water Management
1Tail productionChoosing the right strategy for
Produced Water Management
2Produced Water Daily Volumes
- Statfjord 160 000 m3/d
- Gullfaks 75 000 m3/d
- Snorre 25 000 m3/d
- Tordis/Vigdis 15 000 m3/d
- Veslefrikk 15 000 m3/d
- Heidrun 10 000 m3/d
- Norne 2 000 m3/d
- Åsgard 500 m3/d
3300 000 m3/d of produced water..
4Mars April 2004
5Oil rate development 2003 vs 1998 All GF
and SF wells
6Water rates pr. well 2003 vs 1998 All GF/SF
7 Increased watercut scale, reinjection, water
shutoff, downhole separation
8Environmental impact (EIF) at Statfjord C
9Environmental impact (EIF) at Gullfaks A
Gullfaks A 2002
10Produced Water Management
Produced water treatment
Re-injection
Water shut off
11Authorities, Produced Water and Environment
Reduced Tolerance
vs.
12Produced Water Handling Principles
131. Reduce chemical consumptionor change to
non-toxic
14H2S-removal by use of scavenger
15Environmentally friendly H2S removal
- ProPure C100 installed at Åsgard B May 2001
- Low capital cost
- Performance test in 2002
- 30 reduction in chemical consumption
- Low pressure drop (0.2 bar)
- Installed at Huldra, Veslefrikk, and Gullfaks B
in 2002 - Installation at Gullfaks A and C in 2003
16 2.
- Shut off waterproduction at source
17Well completion type dictates water shutoff
complexity
Screen
Cased
Horizontal, screen
Horizontal, cased
18Main Well Categories in Statoil(total -700
wells)
Complexity, zonal isolation
Openhole horizontal
10
Perforated, cemented, horiz.
25
Openhole, deviated
5
Perforated,cement deviated
60
19- Cumulative annual water shut off
25 000 m3/d
20Ongoing RD Revisiting chemical route to water
shutoff
21Chemical water shutoff/Emulsified gel technology
Strong gel e.g. H2Zero
DPR- Classic i.e. polymer
22Rate effects of changing PI and WC
23RD continued Downhole separation - light
version
Objective Research of slip gravity separator
concept for downhole separation. By controlling
the stratified layers between oil and water in an
inclined tube, the layers can be controlled to
segregate through specially designed slots in the
tubing wall. Demo 2000 project - ABB, Statoil,
Shell Technology and NTNU.
24Future Subsea Separation and PWRI
253. Reinject water (PWRI)
26A-43 PWRI performance
27Statfjord field map
pilot well
28- Today reinjecting 30 000 m3 of water
29RD - PWRI Fracture growth improving our
modelling capability
303. Dispose into aquifer
31Utsira a shallow saltwater reservoir
32Extent of Utsira aquifer
33- Kvitebjørn to dispose all produced water into
Utsira
344. Purify and discharge
35Distribution of organic components in produced
water
WAF Water accommodated fraction
36The CTour process
37Results from CTour test at Statfjord B
These component groups are together with our
corrosion inhibitor the largest contributors to
EIF Blue line system performance (with
hydrocyclones), red line effect of condensate and
mixers only
38 Questions?