Title: Case Study


1
Project Data
Project Cost (Phase I) 16M Site Area (Phase I)
5000 m2 Total GFA (Phase I)
228 m2 Project Inception (Phase I) Feb
2000 Commencement (Phase I) Jul
2000 Completion (Phase I) Dec 2000
Case Study
Wetland Park Visitor Centre (Phase I)
2
The Site
Case Study
Wetland Park Visitor Centre (Phase I)
3
The Goals
  • Millennium project for HKs Eco-tourism
  • Architecture
  • harmonize with adjacent wetland
  • environmental friendly
  • convey message
  • Respect Ecosystem

Case Study
Westland Park Visitor Centre (Phase I)
4
Master Layout
Visitor Centre (Phase I)
Case Study
Wetland Park Visitor Centre (Phase I)
5
Visual Impact
  • Building echoes adjacent wetland
  • Low rise, simple massing, use of natural finish
    materials, sculptures of wetland animals

Case Study
Wetland Park Visitor Centre (Phase I)
6
Building Envelop
Roof Insulation
Case Study
Deep overhang
Minimum opening
Double Wall
Timber Screen
Wetland Park Visitor Centre (Phase I)
7
OTTV
  • OTTV 4.32W/m2
  • Statutory requirement 70W/m2(podium),
  • 30W/m2 (tower block)

Case Study
Wetland Park Visitor Centre (Phase I)
8
Use of Natural Ventilation Daylight
  • Photo cell to switch on lighting when
    illumination level is low

Case Study
  • Wind sensor to switch on extraction fan when
    natural air movement is insufficient

Wetland Park Visitor Centre (Phase I)
9
Material Re-use
  • Old bricks from China
  • Granite rock paving from boundary wall of Wanchai
    Police Headquarters

Case Study
Wetland Park Visitor Centre (Phase I)
10
Material Re-use
  • Gabion wall infill made from oyster shell from
    Lau Fau Shan

Case Study
Wetland Park Visitor Centre (Phase I)
11
Material Re-use
  • Boundary fence wall using dismantled timber
    formwork from concreting

Case Study
Wetland Park Visitor Centre (Phase I)
12
Material with recycled content
  • Pulverized fuel ash (PFA) as cement replacement
    for all structural concrete

Use of non-depletable substances
Case Study
  • Use of environmentally friendly refrigerant (zero
    ozone depletion potential) R407c for the direct
    expansion type A/C system

Wetland Park Visitor Centre (Phase I)
13
Minimize Construction Waste
  • Steel metal decking as permanent formwork for
  • roof slab
  • Prefabricated Air ducts

Case Study
  • Use of second
  • hand formwork
  • from other
  • building sites

Wetland Park Visitor Centre (Phase I)
14
Landscape Design
  • Use of native wetland plant species where suitable

Case Study
Wetland Park Visitor Centre (Phase I)