Title: COUNTRY REPORT
1Kingdom of Cambodia
COUNTRY REPORT
International Cooperation Training Center
(ICTC) Sewage and Wastewater Treatment Management
02-22 April 2006 Seoul and Incheon, Korea
Name Mr. KAING LEANG KRY Official (MPP)
And Mr. KHEM SANDAP Civil Engineer
(DPWP)
Municipality of Phnom Penh and Department of
Public Works and Transport of Phnom Penh
2BASIC COUNTRY DATA
- Area 181,035 Km²
- Climate Condition
- -Temperature Max41ºC, Min15ºC, Averages25ºC
- -Annual Rain Fall 1400mm
- -Season
- -Dry season from November to April
- -Rainy season from May to October
- Population Size 11,561million (In Phnom Penh
958,000) - -Agricultural Sector 76.5
- -Industrial Sector 6.4
- -Services Sector17.1
-
3Organizationnal Structure of Municipality of
Phnom Penh
Governor KEP CHUKTEMA
First Vice-Governor Mam Bunneang
Vice-Governor Map Sarin
Vice-Governor Trac Thaisieng
Vice-Governor Chhun Sirun
Vice-Governor Pa Socheatevong
Vice-Governor Moe Yurang
Vice-Governor Mann Chhoeurn
Vice-Governor Ouch Thongseng
Vice Governor Khon Sear
Vice-Governor Sisowath Pheanuroth
Chief of Cabinet Nuon Someth
4Organizationnal Structure of Department of Public
Works and Transport
Director Mr. Nhem Saran
Deputy Director Mr. Ean Narin
Deputy Director Mr. Ung Bun Ly
Deputy Director Mr. Peng Sokun
Deputy Director Mr. Mey So Panha
Deputy Director Mr. Ean Narin
Deputy Director Mr. Ung Bun Ly
Administration Personal and Human Resources Office
Transport Office
Public Works Office
Finance and Planning Office
Road and Bridge Division
Drainage and Sewerage Division
District Public Works Office
Public Lighting Division
Pound Division
Flood Protection Division
Solid Waste Management
Public Garden Division
5- Mr. Kaing Leang Kry, Municipality of Phnom
- Penh Officer, responsible for solid waste,
rubbish, transportation and sewage system in the
City. - Nº 69, Preah Monivong Blvd., Sangkat Spras
Chak Khan Daun Penh, Phnom Penh - Tell 023 430 466
- Fax 023 430 466
- Mr. Khem Sandab, Civil Engineer from Drainage
Division, Drainage Design, Construction and
Maintenance. - St. 211 Sangkat Veal Vong Khan 7makara Phnom
Penh. - Tell 023 884 371
- Fax 023 884 371
6Problems of the Operation when managing Sewage
and Wastewater Treatment Plant
- - So far there are no wastewater treatment
plants in our country, the outlets of the primary
sewer network are into storage basins in Phnom
Penh which are used as treatment plants. - - The problem of storage basins mainly lies with
thier progressire filling by silt and other
solids brought in through the combined sewer
system, direct runoff on street surface during
flooding and sludge from septic tanks.
7- - Municipality wastewater is primarily disposed
of through a network of sewage drainage pipes
that empty into retention basins known as Beong. - - The wastewater in the basin is later pumped
into rivers and lakes. In Phnom Penh, for
example, there is a network of sewage/drainage
pipes and 11 pumping station covering the 6 main
catchment areas Beong Trabek, Beonk Salang, the
Khmero Russian Hospital vicinity, Daun Penh New
front of Basac, and Toul Kok.
8LOCATION OF PUMPING STATION IN PHNOM PENH
TOUL KORK I PUMPING STATION
PHER KUY PUMPING STATION
PREAH KOMLUNG PUMPING STATION
TOUL KORK II PUMPING STATION
CHAK TOMUK PUMPING STATION
TOEK LAAK PUMPING STATION
BOENG SALANG PUMPING STATION
RUSSIA HOSPITAL PUMPING STATION
BOENG TRABEK PUMPING STATION
TUMPUN PUMPING STATION
9RUSSIA HOSPITAL PUMPING STATION
10CONSTRUCTION AND OPERATION OF SEWAGE
- Sewage and Wastewater Treatment Facility
- - Sewer network had been constructed until the
end of 1960s with city development during this
period, numerous channels and ditches were filled
up and converted to sewer pipes. - - The sewer network is now managed by DPWT.
- - The existing combined drainage and sewerage
system consists of 150km of pipes network. 9km of
canals, 4 retention basin and 11 pumping station,
and covers 24km2 of inner dike area in Phnom
Penh. The Drainage and sewerage system, due to
absent of regular maintenance for 25 year, is in
a bad condition and needs urgent attention.
11- - Drainage and sewage Division of DPWT is in
charge of operation and maintenance of the
drainage pumping stations in the municipality of
Phnom Penh. - - Major repair of equipment in dry season.
- - Daily operation records includes the number of
installed pumps, water level at pumping station. - - Operation time (Start , End )
- - Number of Pump working / broken.
12 CONSTRUCTION AND OPERATION OF SEWAGE
13 Public banner from the Ministry of Interior
and the Ministry of Environment demonstrating to
people the need to keep sewers clean
14WATER QUALITY STANDARDS IN PUBLIC WATER AREAS
FOR BIO-DIVERSITY CONSERVATION
1. River
No Parameter Unit Standard Value
1 2 3 4 5 pH BOD5 Suspended Solid Dissolved Oxygen Coliform mg/l mg/l mg/l mg/l MPN/100ml 6.5 8.5 1 10 25 100 2.0 7.5 lt 5000
152. LAKES AND RESERVOIRS
No Parameter Unit Standard Value
1 2 3 4 5 6 7 pH COD Suspended Solid Dissolved Oxygen Coliform Total Nitrogen Total Phosphorus mg/l mg/l mg/l mg/l MPN/100ml mg/l mg/l 6.5 8.5 1 8 1 15 2.0 7.5 lt 1000 0.1 0.6 0.005 0.05
163. COASTAL WATER
No Parameter Unit Standard Value
1 2 3 4 5 6 7 pH COD Dissolved Oxygen Coliform Oil content Total Nitrogen Total Phosphorus mg/l mg/l mg/l mg/l MPN/100ml mg/l mg/l 7.0 8.3 2 8 2 7.5 lt 1000 0 0.2 1.0 0.02 0.09
17TO PROMOTE THE COOPERATION BETWEEN CAMBODIA AND
KOREA
We think that the - Korean Government
should send more investors to invest in
Cambodia. - Korean Government should send
technical assistants to help Cambodia,
especially in Phnom Penh.
- Korean Government should increase
the number of participants undertaking
training course about environment.
18EXPECTATION FROM THE COURSE
- We had known about new technology in Korea
to improve their country. - We hope that
after finishing this course we can get more
experience on high technology to improve
our work in the country. 012 553 176 Sarey Vuth
( pumping station)
THANK YOU
19Toek Laak New Pumping Station
20PLAN OF BOENG TRABEK PUMPING STATION
21GENERAL PLAN OF NEW TUMPUN PUMPING STATION
22PLAN AND PROFILE TUMPUN NEW PUMPING STATION