NCHRP Project 1735: Evaluation of Safety Strategies at Signalized Intersections - PowerPoint PPT Presentation

1 / 6
About This Presentation
Title:

NCHRP Project 1735: Evaluation of Safety Strategies at Signalized Intersections

Description:

Alicia Carriquiry, Iowa State University. Objectives and Scope ... State DOTs. Selected local agencies. Listservs. Traffic Control Devices. Safety Engineers ... – PowerPoint PPT presentation

Number of Views:41
Avg rating:3.0/5.0
Slides: 7
Provided by: rsr15
Category:

less

Transcript and Presenter's Notes

Title: NCHRP Project 1735: Evaluation of Safety Strategies at Signalized Intersections


1
NCHRP Project 17-35 Evaluation of Safety
Strategies at Signalized Intersections
  • Key Team Members
  • Raghavan Srinivasan (PI), HSRC
  • Kim Eccles (Co-PI), VHB
  • Persaud and Lyon Inc.
  • Alicia Carriquiry, Iowa State University

2
Objectives and Scope
  • Complementary to the FHWA Pooled Fund Safety
    Evaluation project
  • Develop Accident Modification Factors for
    selected strategies from Volume 12 of NCHRP
    Report 500 (strategies at signalized
    intersections)
  • Focus on tried and experimental
  • Before-after safety effectiveness evaluations
  • Likely to evaluate 4-5 treatments

3
Tasks
  • Task 1 Literature Review
  • Reviewed ongoing and recently completed studies
  • Focus on crash based studies
  • For each study
  • Data
  • Methodology
  • Develop Accident Modification Factors
  • Comments and Rating (low, low-medium,
    medium-high, and high)

4
Task 2 Survey of Agencies
  • On-line survey using Zoomerang
  • Links to the survey
  • Part 1
  • http//www.zoomerang.com/survey.zgi?pWEB226KF66HV
    XX
  • Part 2
  • http//www.zoomerang.com/survey.zgi?pWEB226KF6HHW
    6N

5
Survey of Agencies, contd.
  • State DOTs
  • Selected local agencies
  • Listservs
  • Traffic Control Devices
  • Safety Engineers

6
Future Tasks
  • Compile results of Task 2 survey
  • Follow-up with phone calls to selected agencies
  • Select possible strategies/treatments
  • Develop work plan and interim report (Aug 2007)
  • Meet with NCHRP Panel (Sep/Oct 2007)
  • After Panels approval, start compiling data for
    evaluating the selected treatments
  • Project is scheduled to end October 31, 2009
Write a Comment
User Comments (0)
About PowerShow.com