Campus Infrastructure - PowerPoint PPT Presentation

About This Presentation
Title:

Campus Infrastructure

Description:

Able to extend the Gigabit backbone ... Our Current connection is an OC-3. ... Hopi. Hybrid Optical Packet Infrastructure. Dynamic Optical Networking. Futures ... – PowerPoint PPT presentation

Number of Views:42
Avg rating:3.0/5.0
Slides: 9
Provided by: dale85
Learn more at: https://research.unl.edu
Category:

less

Transcript and Presenter's Notes

Title: Campus Infrastructure


1
Campus Infrastructure
  • What is available and what are the plans.

2
Overview
  • State of the current Network on campus
  • Current off campus connectivity
  • Planned off campus connectivity
  • Regional Initiatives
  • National Initiatives

3
Current Campus Network
  • Fully redundant Gigabit Ethernet backbone.
  • Able to extend the Gigabit backbone to any
    building on campus as needed.
  • Able to provide Gigabit to the desktop in most
    buildings.

4
Research network connections
  • Our Current connection is an OC-3.
  • We are in the process of upgrading the Internet 2
    connection to an OC-12.
  • This has been delayed by an issue obtaining
    access to the Internet 2 site in Kansas City.
  • I believe this will be resolved in the next week
    or so.

5
Regional Initiatives
  • MIDnet Inc. has issued an RFP for obtaining dark
    fiber in the Great Plains region.
  • There were 5 responders.
  • The evaluation of those responses is taking place
    right now.
  • If a bid is accepted and UNL participates we will
    have access to dark fiber by the end of 2006.

6
Regional Initiative Costs
  • We anticipate the first year costs to range from
    600,000 t0 750,000.
  • Second year costs are estimated at 500,000.
  • On-going costs will be much less.

7
National Initiatives
  • Abilene and NLR are merging their efforts.
  • Not yet clear exactly what this means to the
    connectors to Abilene or NLR
  • Hopi
  • Hybrid Optical Packet Infrastructure
  • Dynamic Optical Networking

8
Futures
  • With access to Dark Fiber we will be able to
    create, at little incremental cost, new
    connections for research projects as needed.
  • The time frame for these will be days and weeks,
    not months.
  • 10 Gigabit Ethernet on the Campus is possible
    with our infrastructure.
Write a Comment
User Comments (0)
About PowerShow.com