JIC WAY AHEAD - PowerPoint PPT Presentation

1 / 16
About This Presentation
Title:

JIC WAY AHEAD

Description:

FSA. UNCLASSIFIED. DRAFT. 10. Topic. Review Previous JCSG actions ... FSA Aug Oct 06. COCOMs Future IPL Priority. USD (I) Integrated ISR Roadmap ... – PowerPoint PPT presentation

Number of Views:122
Avg rating:3.0/5.0
Slides: 17
Provided by: lcdrbrett
Category:
Tags: ahead | jic | way | fsa

less

Transcript and Presenter's Notes

Title: JIC WAY AHEAD


1
Joint Concept Steering Group24-25 August 2005
2
Joint Operations Concepts
UNCLASSIFIED
  • Colonel Ed Yarnell
  • Joint Staff J7
  • 24 25 Aug 2005

UNCLASSIFIED
3
Outline
  • Review Previous JCSG actions
  • Provide Status on Joint Operations Concepts
    (JOpsC) Family
  • Discuss Improvement Efforts
  • Discuss Way Ahead

4
May 05 JCSG AAR
        C2 JIC as a prototype for the new
standardized CBA process when defined. C2 JIC
completing final approval process. CBA TOR and
joint experimentation application to JICs require
further standardization         JS J7 and JFCOM
J9 will provide a better definition of Joint
Experimentation as it relates to future concept
development. C-Plan/3010         3 yr review
cycle for concepts in CJCSI 3010.02B to support
future Strategic Guidance. 3010         JS J7
and J8 will resolve the requirements for Concepts
entry into JCIDS and use of DPS scenarios in
JICs. 3010         JCSG Stakeholders will
review CJCSI 3010.02B Appendix C forwarded sepcor
and provide feedback to the writing team.
Completed and incorporated in 3010 draft.
5
May 05 JCSG AAR
        The Joint Concept community will write
non-directed Joint CONOPS and submit them for a
Decision Point. The Decision Point, if they are
deemed to have merit for further analysis and
potentially CBA, there will be direction for
the writer to go back and add the additional
analysis, context, and fidelity required. Agenda
item for current JCSG         JS J7 and J8 will
synchronize CJCSIs 3170 and 3010. 3010 and
current FCB process improvement effort.
        JS J7 will provide a format to capture
the costs and resources required for concept
development in CJCSI 3010.02B. Did not
incorporate format but will be captured in
lessons learned from authors. See 3010
responsibilities.         JS J7 will host /
sponsor future quarterly JCSG meetings. Next
meeting is 15 16 Nov         JS J7 will
provide website link information in CJCSI 3010 to
Executive Summaries of all of the family of Joint
Concepts. Posted
6
Topic
  • Review Previous JCSG actions
  • Provide Status on Joint Operations Concepts
    (JOpsC) Family
  • Discuss Improvement Efforts
  • Discuss Way Ahead

7
JOpsC Family
Capstone Concept for Joint Operations (CCJO)
Operational Context
JOCs
Joint Functional Concepts
Joint Functional Concepts
Joint Functional Concepts
JFCs
1. Homeland Security 2. Strategic Deterrence 3.
Major Combat Operations 4. Stability Operations
Support
1. Battlespace Awareness 7. Force
Management 2. Command and Control 8.
Training 3. Force Application 4. Focused
Logistics 5. Force Protection 6. Net-Centric Ops
JICs
5. Seabasing 9. Persistent ISR 6. Joint
Command and Control 7. Joint Logistics 8. Net
Centric Operating Environment
1. Global Strike 2. Joint Forcible Entry
Operations 3. Joint Undersea Superiority 4.
Integrated Air Missile Defense
8
CCJO v. 2.0 Aug 2005
Knowledge Empowered Networked Interoperable Expedi
tionary Adaptable / Tailorable Enduring/Persistent
Precise Fast Resilient Agile Lethal
Informed by Strategy
JFC
Unified Action
FSD
  • Systems view
  • Fundamental actions
  • How to operate

9
Capabilities Based Assessment (CBA) Status on
JICs
JFEO
FNA
JROCM
JCB 25 Feb
FNA
FSA
JUSS
JCB 16 Feb
JIC
IAMD
FAA
FNA
FSA
TANK 10 Dec
FNA
Global Strike
JIC
FNA
FAA
FSA
TANK 10 Jan
Final 05
FAA Functional Area Analysis FNA Functional
Needs Analysis FSA Functional Solutions Analysis
Today
Seabasing
FAA/FNA/FSA
JIC
Initial 06
JIC
Joint Logistics
FAA/FNA/FSA
JIC
FAA/FNA/FSA
Joint C2
JIC
FAA/FNA/FSA
NCOE
FAA/FNA/FSA
JIC
Persistent ISR
10
Topic
  • Review Previous JCSG actions
  • Provide Status on Joint Operations Concepts
    (JOpsC) Family
  • Discuss Improvement Efforts
  • Discuss Way Ahead

11
Concepts to Capabilities
JOpsC Family
Near-Term CONOPS
12
FCB links to Concept Development Experimentation
(CDE)
CCJO JOCs
ROADMAPS
JE CPlan
PROTOTYPES
JFCs
FUTURE Capability Requirements
ACTDs
JCA
HOW? Joint Concept Steering Group (JCSG) Joint
CDE Executive Council
  • Experimentation is needed to
  • Develop prototype solutions for current needs
  • Develop solutions for future needs
  • Help assess Concepts
  • During Experimentation, FCBs
  • Participate in defining proposed solutions
  • Participate in process and outcomes
  • Experimentation output
  • Actionable Recommendations
  • DOTMLPF Change Requests
  • Prototypes
  • Recommendations for Concept revisions

13
Joint Concept Community Collaboration
Joint Concept Steering Group
O6 level
Meet Quarterly
Joint Concept Executive Council
GO/FO level
Meet as Needed
JCSG DISCUSSION ITEM
JROC/JCS
14
Persistent ISR JIC
SCOPE
MILITARY PROBLEM
US ISR force structure must be able to provide an
affordable, flexible and focusable ISR capability
that is able to support the full range of
military operations. The ability to gather,
fuse, and understand multi-INT, multi-domain
information to derive long term knowledge of
adversary capability, status and intent to
provide persistent, deep look, multi-aspect
surveillance enabling prosecution of time
critical targets across all mediums and to track
and identify surface moving targets is critical
to Warfighter success.
TBD SCOPING ISSUE WILL BE DISCUSSED DURING AUG
05 JCSG
SAMPLE
JUSTIFICATION
PROPOSED TIMELINE
  • COCOMs Future IPL Priority
  • USD (I) Integrated ISR Roadmap
  • OSD (PAE) ISR Crosscutting Study
  • JOpsC Capabilities
  • -IAMD, GS, JC2, NCOE JICs
  • JROCM 068-05 (Apr 05) directs ISR CBA
  • IED Defeat CONOPS UAV Tiger Team
  • OA-05 Study (Time Sensitive Targeting)
  • JS J8 supports funding CBA

JIC OPR STRATCOM CBA OPR BA FCB CONOPs
STRATCOM Complete Sep 05 JIC Begin Oct 05
Complete Feb 06 JCS IPR Oct / Nov 05 Wargame
Conducted during CBA CBA FAA Feb Apr 06
FNA May Jul 06 FSA Aug
Oct 06
15
Topic
  • Review Previous JCSG actions
  • Provide Status on Joint Operations Concepts
    (JOpsC) Family
  • Discuss Improvement Efforts
  • Discuss Way Ahead

16
Way Ahead
  • Revise JOCs Complete Current Concepts
  • CCJO approved by CJCS Aug 05
  • JOC revisions Jun 05Jun 06
  • Complete four JICs (Joint Logistics, C2, NCOE,
    P-ISR) SepDec 05
  • Complete Training JFC Dec 05
  • Development of Additional JOpsC family
  • CJCSI 3010 Sep 05
  • JCSG Charter
  • JOpsC nomination criteria development approval
    process
  • Execute nomination process _at_ Nov JCSG
Write a Comment
User Comments (0)
About PowerShow.com