Title: Beam%20Test%20Hardware%20Delivery%20Status


1
Beam Test Hardware Delivery Status
  • Eduardo do Couto e Silva
  • February 18, 2006

2
High Level Schedule for Hardware
  • Review of Flight Hardware Handling Plan
  • April 14
  • Arrival of Ancillary Detector from Bari
  • April 27
  • Arrival from CU Hardware from SLAC
  • May 2
  • Start of CU System tests
  • May 15
  • Workshop 2 in Pisa
  • May 15-18
  • CU and Ancillary Systems Test
  • June 19
  • Workshop 3 in Pisa
  • mid June?
  • Arrival of Hardware at CERN
  • July 24
  • PS Beam Test Starts
  • July 27

3
Update on Reviews
  • Flight Hardware Handling Plan
  • Recommendations from Review on Friday (April 14,
    2006)
  • verify that 1x4 grid has been load tested with
    dummy loads before we proceed with hardware
    integration
  • including rotations and additional loads due to
    transportation)
  • avoid usage of water as coolant
  • provide control and monitor temperatures and
    relative humidity
  • avoid condensation
  • using dray air bottles instead of Nitrogen for
    transportation from Pisa to CERN.
  • Have one general Healthy Safety responsible for
    all operations.
  • Ship the assembled unit back to SLAC instead of
    separate items.
  • Outcome
  • Praise to Italian Collaborators (Luca et al) for
    preparing the review
  • We were authorized to ship flight hardware spares
    to Italy
  • Upcoming Reviews by the end of the month
  • MGSE
  • CU procedure for integration (LAT-PS-8132)

4
Hardware Delivery from SLAC
  • Monday April 17, 2006
  • TKRFM8
  • ACD FREE card 2 ACD Tiles
  • Breakout Boxes
  • the polarity is not standard in one of them. Jeff
    Tice will send details to Italy
  • Tuesday April 18, 2006
  • CAL FM101, CAL FM109
  • Upcoming deliveries by May 10 (hopefully)
  • ACD cables (_at_ SLAC)
  • already tested at SLAC, will be sent by FedEx
  • Remaining 3 ACD tiles (_at_ SLAC)
  • to be removed from the QualUnit after agreement
    with IT
  • Two 28 V power supply with remote control
  • sent to company to be converted to 240 V and
    recalibrated
  • EGSE for data taking
  • need feedback ASAP so that we can start
    procurement
  • see next slides

5
CAL Comprehensive Performance Tests _at_ SLAC
  • Eduardo asked Luca, Johan and David to look at
    the data in detail
  • 10 min muon run had wrong thresholds
  • but FLE trigger works

6
EGSE Description (from Ric)
May change after feedback from CERN (via Pasquale)
  • CISCO switch and shelves
  • standard 19 inch rack
  • 3 computers
  • 2 Dell 1850 with a KVM switch
  • Uninterrupted Power Supplies
  • back-up and filtering
  • Need feedback to start procurement !!!
  • CERN requirements on
  • firewall, switches, IP addresses
  • current baseline NO firewall
  • Pasquale is in contact with CERN
  • UPS requirements
  • filtering and power back-up
  • Gary is investigating that at SLAC
  • Control Room Requirements

7
Diagram from Luca Latronico
PWR1
Gary is looking into grounding issues and will
consult with Mike Huffer
28V PS
GRID TKR CAL
ISC
CHO Therm
TEM
TEM
LCB
XBRD
XBRD
XBRD
VME
TEM
GASU
TPS
TPS
TPS
GND
INS
PWR2
XY table
INS
XY table motor
PWR3
VME2
Ancillary Systems