Title: EVOLCI A VILLAMOS ENERGIA PIACON


1
(No Transcript)
2
Observation of major accident prevention
requirements in developments at BorsodChem Rt.
Kazincbarcika, 29 September 2005
Gyula Bihari Head of Safety Engineering Department
3
Safety Policy concerning developments
  • Safety level shall be improved beside capacity
    expansions.
  • The best available techniques shall be applied.
  • Safety risks shall be analysed and minimized
    within the limit of rationality, in each phase of
    establishment.
  • Have any major accidents occurred in similar
    technologies in the world? If yes, what was the
    reason for that? (we should draw a lesson from
    others faults)

4
PLANNING
  • Safety Policy shall be applied in planning to
  • technologies,
  • utilities,
  • building,
  • equipments,
  • energy supply
  • normal supply,
  • emergency supply.
  • control technique
  • normal operation,
  • emergency stop.
  • personnel
  • availability,
  • training,
  • preparedness for emergency.

5
LICENSING
  • Drawing up plans, documents for licensing
    procedure
  • Risk analysis and risk assessment, based on
    available information
  • Defining the safety level to be achieved
  • Defining concept for passive protection
  • Requirements regarding active protective systems

6
CONSTRUCTION
  • Supervision of detailed designs
  • Qualification and approval tests of buildings,
    electrical equipments, control devices
  • Machinery, equipment and system tests (individual
    machine tests, pressure test, closeness tests,
    complex tests, test runs), certificate of
    suitability
  • Drawing up manuals for operation, maintenance and
    control activities
  • Selection and training of the operating staff for
    normal operation and emergency measures
  • Risk evaluation and risk reduction
  • Acceptance procedures
  • Drawing up documentation for licensing procedure
  • Requesting license for test run

7
TEST RUN
  • Requirements
  • test run plan,
  • licence for test run,
  • engineering inspection.
  • Process
  • examinations, measures that can be done only
    under operational circumstances,
  • measurements for checking suitability.
  • Evaluation
  • evaluation of test run plan,
  • controlling full compliance with authorities
    requirements.
  • Evaluation of real risks

8
USE
  • Requesting licence considering the experiences
    obtained during test run, and by submitting
    revised Safety Report
  • Data, details to be finalised
  • substance inventory,
  • quantities of dangerous substances present
    simultaneously in the establishment,
    installation, equipments and pipelines,
  • potential risks, involving risks of major
    accidents,
  • frequencies of accidents,
  • special death curves, FN curves,
  • internal emergency plans,
  • provision of data necessary to external emergency
    plans,
  • data provision for land-use planning.