Modifications clarified 512.50
  • Contract Modifications
  • are specific changes to a contract that require
    an NRCS Approving Official and participant
    signature
  • are documented on either the Revision of
    Conservation Plan/Schedule of Operations
    (NRCS-CAP-1156, or the Transfer Agreement
    (NRCS-CPA-152)
  • signed electronically by NRCS Approving Official
    and MANUALLY by participant
  • decision maker will become default signature for
    modifications and payments to generate signature
    box on CPA-1156 but can be changed through a
    modification to select additional or different
    participants

3
Modifications clarified 512.50
  • Minor Contract Changes
  • changes that do not increase or decrease by more
    than 1000
  • do not require approval by a NRCS Approving
    Official
  • do not require signature by participants
  • minor contract changes are captured in ProTracts
    and do not require documentation in the contract
    folder

4
Modification Process
  • Modification will be submitted for approval by a
    NRCS Approving Official using NRCS-CPA-1156 or
    NRCS-CPA-152
  • NRCS-CPA-1156 must be generated through ProTracts
  • basis for modifying the contract must be clearly
    stated
  • contract items will not be rescheduled to avoid
    loss of payment due to violation of HELC/WC
    compliance provisions
  • modification that result in an obligation
    increase must be within the scope of original
    contract and are generally categorized as a cost
    overrun approval is based on availability of
    funds
  • modifications involving a change of scope are
    prohibited

5
EQIP Manual ChangesModification Procedure
  • 515.102
  • 515.102G Successor-In-Interest
  • Added the successor-in-interest must meet all
    eligibility requirements for EQIP
  • 515.102H Repairing Damaged Conservation
    Practices
  • EQIP funds may be used to restore practices
    damaged by a natural disaster for active contract
  • ECP funds no longer eligible for any practice
    still under a USDA program lifespan

6
WHIP Manual Changes
  • Change in scope modifications no longer
  • permitted for WHIP

7
Modifications No Signature Required
(participants)
  • changes within the original length of the
    contract
  • increase/decrease planned amount of conservation
    practice or components when the payment amount
    per contract item is not increased by more than
    1000 per conservation practice, or activity
  • add/delete a component from a planned practice
  • edit crop types or acres
  • edit livestock type
  • add a vendor code to a participant

8
Modifications Signature Required (participants)
  • adding land (only CSP)
  • losing control of some of the land under contract
  • extending or reducing the contract period
  • substituting a new CIN
  • adding or deleting a CIN (deleting an CIN must
    have a valid reason not adverse to the Government
    interest or conservation objectives)
  • destruction of established practice
  • adding a participant or adjusting participant
    shares
  • reapplying a conservation treatment that failed
  • adding an item to the contract that utilizes TSP
    funds
  • changing a method of cost-sharing or adding a
    payment cap for a practice
  • CSP changing tier or contract length

9
TSP PaymentsModification Requirements
  • The participant requests a modification of his or
    her CPC to include funding for the desired
    services. This modification must me signed by
    the NRCS Approving Official before the
    participant is authorized to use TSP services
  • All work to be performed by a TSP must be
    substantially completed during the same fiscal
    year that funds are obligated in a CPC for TSP
    assistance

10
Documentation of Contract Modifications
  • Modification Action Form
  • Cancel a contract Form generation is not
    required. The Designated Conservationist (DC)
    is required to write canceled and date on
    all contract documents in the folder, and change
    the contract status to cancelled in
    ProTracts. This requires documentation
    supporting the participants request or
    approval on Form NRCS-CPA-153 or formal
    correspondence.
  • Terminate a contract Form generation is not
    required. The DC is required to write
    terminated and date on all contract
    documents in the folder, and change the
    contract status to terminated in ProTracts.
    This requires formal documentation with appeal
    rights provided to the participant
  • Add a participant Form NRCS-CPA-152, Transfer
    Agreement
  • Delete a participant Form NRCS-CPA-152, Transfer
    Agreement
  • Change participant payment
  • shares Form NRCS-CPA-152, Transfer Agreement
  • Change contract expiration date Form
    NRCS-CPA-1156
  • Change contract land units or
  • legal description Form NRCS-CPA-1156

11
Documentation of Contract Modifications cont.
  • Modification Action Form
  • Change acres under contract Form NRCS-CPA-1156
  • Change CSP eligible acres Form NRCS-CPA-1156
  • Change CSP contract tier Form NRCS-CPA-1156
  • Change CSP contract years Form NRCS-CPA-1156
  • Add a practice/contract item Form
    NRCS-CPA-1156
  • Change contract item
  • TA fund code Form NRCS-CPA-1156
  • Delete a practice/contract item Form
    NRCS-CPA-1156
  • Add land units to a practice Form
    NRCS-CPA-1156
  • Remove land units from a practice Form
    NRCS-CPA-1156
  • Change contract item
  • benchmark indicator Form NRCS-CPA-1156
  • Decrease component
  • cost-share rate Form NRCS-CPA-1156
  • Increase component cost-share rate Form
    NRCS-CPA-1156

12
Approval of Contract Modifications
  • all contract modifications and minor contract
    changes will be completed through ProTracts
  • the participant and NRCS Approving Official will
    sign all contract modifications
  • contracts modifications that exceed the lesser of
    20 of the current contract obligation or 10,000
    will require approval of the State
    Conservationist or designee
  • all other modifications Approving Official is
    Contracting Officer or designee
Write a Comment
User Comments (0)
About PowerShow.com