Initial Application Selection for VII Test Beds - PowerPoint PPT Presentation

1 / 11
About This Presentation
Title:

Initial Application Selection for VII Test Beds

Description:

DSRC WiFi Cellular. Video/Audio. Streaming. Traffic. Management. and Control ... Demonstrate supplier's capability to build and install ... – PowerPoint PPT presentation

Number of Views:40
Avg rating:3.0/5.0
Slides: 12
Provided by: RRob8
Category:

less

Transcript and Presenter's Notes

Title: Initial Application Selection for VII Test Beds


1
Initial Application Selection for VII Test Beds
  • ITS-M Annual Conference
  • Ralph Robinson
  • VII Consortium
  • June, 2006

2
VII Program on Track
  • VII Program proceeding as planned
  • 2008 VII decision date
  • 2010/11 VII Deployment opportunity
  • VIIC is launching initial work to deploy a
    Proof-of-concept system in 2007
  • Many active partners including MDOT and BAH
  • Expect 20 40 vehicles evaluating 9 applications

3
VII-equipped Vehicle Population Projection
Antique and Collector vehicles not converted
Vehicle Population
New Cars Equipped from Factory
Total Vehicles on Roadway
Assumes 250m vehicles on road 16 m built each
year
2005 2010 2015
2020 2025
2028
4
VII Benefit vs Density
Automated Highway Segments
Accidents
Traffic Management
100 Accidents
0 (reduction from 2006 baseline)
Crash Avoidance
Roadway Situational Awareness
0 VII Equipped Veh 100
VII Equipped Population
Active Controls
Traffic Info Safety Warnings
2010
Timeline 2025
5
Conceptual Relationships of VII Applications
(Illustrative example only)
Safety (DSRC)
VII equipped vehicle population
5
25
50
75
95
Mobility
Video/Audio Streaming
Commercial
Broadband Services
Parking Locator
Public Announcements
Fleet Management
OEM Customer Relations
Geo Fencing / Vehicle Recovery
Voice Mail
Internet Services
Dynamic Traffic / Weather via Probe Data
Vehicle mainten-ance
DSRC WiFi
Cellular
Wireless Coverage Area
Tolling / Payments
Traffic Management and Control
Traffic Signal Violation
O/D planning
Active Highway Signage
Dealer Processing
Cooperative Collision Avoidance
Access Control
File / Data Downloads
Local Services Real Time Control
Emergency Vehicles
EE Brake Lights
Merge Assist
2005 2010
2015 2020
2025
6
Key Use Cases
  • Electronic Brake Light Warning
  • Signal Violation Warning
  • In-Vehicle Signage
  • Dynamic Traffic Information
  • Roadway Conditions (weather and potholes)
  • Traffic Management and Control
  • Alternative Route Guidance
  • Payment Transactions (tolls, gasoline, parking)
  • Provisioning and Security management

7
POC Applications Selected
  • The selected applications are proposed for
    Proof-of-Concept test bed deployment
  • Likely the first VII production applications
  • Applications support diverse interests (safety,
    mobility and consumer)
  • System provides good test coverage
  • Important to have near term benefits even without
    high populations of VII equipped vehicles
  • Diverse applications mix to determine reliable
    performance under concurrent or interleaved
    application operation

8
POC Applications Selected (cont.)
  • The proposed POC applications are the starting
    points for evaluation of initial production
    deployments
  • Other applications may be added as resources or
    priorities become identified
  • Individual VIIC members may vary the set they
    support based on internal needs
  • Only the common, non-competitive components of
    these UCs will be jointly developed

9
Initial Test Bed Scope
10
System Testing
  • The VII vehicle fleet testing will start locally
    and grow to sizable fleets and infrastructure
    deployments over the next 3 years
  • Initial Proof-of-Concept in S.E. Michigan
  • Future FOTs in CA, FL, MN and potentially others
  • These fleets should serve to satisfy the various
    stakeholder deployment decision criteria
    including
  • Confirmation that the VII system functionally
    works as specified,
  • Demonstrate suppliers capability to build and
    install
  • Implementation confirms business case assumptions
  • The deployed fleet applications provide business
    value to the stakeholders and/or driver benefits
    over the course of the deployment period

11
Next Steps
  • VIIC is preparing the Application Work Order for
    submission to USDOT partnership this month
  • Deploy SE Michigan Test Bed
  • Partners include MDOT, CAMP and USDOT
  • Demonstration of the selected applications will
    be shown mid-year, 2007
Write a Comment
User Comments (0)
About PowerShow.com