PMD Collaboration Meeting VECC - PowerPoint PPT Presentation

1 / 17
About This Presentation
Title:

PMD Collaboration Meeting VECC

Description:

Sunil Dogra. Different categories data sets. This data set is divided into following categories ... Sunil Dogra. Basic Plots for PMD ... – PowerPoint PPT presentation

Number of Views:28
Avg rating:3.0/5.0
Slides: 18
Provided by: admi514
Category:

less

Transcript and Presenter's Notes

Title: PMD Collaboration Meeting VECC


1
Status of Au-Au at 200GeV data analysis
  • Sunil Dogra
  • University of Jammu

2
Outline
  • Different data sets
  • Production chain for Nano-dsts
  • QA-plots for gain calculations
  • Status of present status

3
Different categories data sets
  • This data set is divided into following
    categories
  • With beam on pedestal Beam Off pedestal
  • High Voltage conditions
  • -1400 Volts lt-1400 Volts
    gt-1400Volts
  • a). Trigger High (Reverse Half and FulField)
  • b). Trigger Low (Reverse Half and FulField)
  • c). Trigger Mid (Reverse Half and FulField)
  • d). Minbias

4
Nano-Dst Production chain
  • Macros used for production
  • pmd_betaProd_isc.C
  • read_isc_chi2.C
  • load_db_fromNT.C

Calibration constants are filled in the database
based Category Wise.
  • Makers used for Production
  • StMuDSTMaker
  • StMuAnalysisMaker
  • StPmdClusterMaker
  • StMu2Maker

5
Basic Plots for PMD
  • Total number of chain working 17 and there are
    33 chain sm combinations.

6
Total Working Combinations 25
  • Combination  SM Chain
  • 18 17 37
  • 19 18 37
  • 20 19 38
  • 21 20 39
  • 22 19 40
  • 23 20 41
  • 24 22 41
  • 25 21 42
  • 26 22 43
  • 27 21 44
  • 28 21 45
  • 29 23 45
  • 30 22 46
  • 31 23 46
  • 32 23 47
  • 33 23 48
  • Combination SM Chain
  • 1 12 25
  • 2 12 27
  • 3 14 27
  • 4 13 26
  • 5 13 28
  • 6 14 29
  • 7 15 30
  • 8 15 31
  • 9 16 32
  • 10 14 33
  • 11 16 33
  • 12 15 34
  • 13 17 34
  • 14 15 35
  • 15 17 35
  • 16 16 36
  • 17 18 36
  • 18 17 37

7
Isolated Cell Spectra
Isolated Cell
8
QA Plots for data base filling
9
(No Transcript)
10
Mean of SMs
11
cont.
SM 19 and 23 Non-working
12
MPV Vs Mean for each SM
13
(No Transcript)
14
Problems faced
  • Memory consumption by TCloneArray.
  • How to deal with the runs taken with different
    voltage and with different pedestal status during
    one day
  • Disk Space

15
Status of Nano- Dst production
  • With Pedestal On SM  20 OFF, and ALL SMs in PMD
    plane -1400V except SM 24 which is at -1200V
  • So far the data from day 80 to 84 has been
    analysed with Trigger High and data base for gain
    corrections has been filled.

16
Thank You
17
(No Transcript)
Write a Comment
User Comments (0)
About PowerShow.com