Title: DSD%20Annual%20Report%202008/09
1DSD Annual Report2008/09
Draft presentation Select Committee on Social
Services 3 November 2009
2Presentation outline
- Part A
- Overview
- Part B
- Programme Performance 2008/09
- Part C
- Budget and Expenditure report 2008/09
- Auditor Generals Report
- Challenges
- Part D
- Legislative Framework 2008/09
3Part AOverview
4DSD Strategic Perspective
- The department has premised its strategies and
services on two platforms - services that deal with assisting society to deal
with what they are currently experiencing as a
result of poverty and social dislocation and - strategies to deal with factors that give rise to
and sustain poverty, inequality and social
discord.
5Vision
A caring and integrated system of social
development services that facilitates human
development and improves the quality of life.
Mission
To ensure the provision of comprehensive social
protection services against vulnerability and
poverty within the constitutional and legislative
framework, and create enabling environment for
sustainable development. The Department further
aims to deliver integrated, sustainable and
quality services, in partnership with all those
committed to building a caring society.
6Strategic Priorities
- Tackling child poverty.
- Tackling adult and older persons poverty.
- Youth development.
- Social cohesion.
- Civil society support and strengthening of
communities. - Governance and institutional development.
- Regional and international solidarity and
development.
"Building a Caring Society. Together"
7PROGRAMMES AND MEASURABLE OBJECTIVES
- Programme 1 Administration
- Provide for policy and strategic direction by the
ministry and top management and for overall
management and support services to the
Department. - Programme 2 Comprehensive Social Security
- Ensure the development of norms and standards,
facilitate financial and economic planning,
monitor compliance with social assistance policy
prescripts for the provision of a comprehensive
system of social security, and facilitate the
payment of social assistance grants to eligible
households. - Programme 3 Policy Development, Review and
Implementation Support for Welfare Services - Create an enabling environment for the delivery
and accessibility of integrated developmental
social welfare services in partnership with all
relevant stakeholders.
8PROGRAMMES AND MEASURABLE OBJECTIVES Cont.
- Programme 4 Community Development
- Develop, monitor and facilitate the
implementation of appropriate policies,
strategies and programmes aimed at strengthening
the potential of communities, including youth, to
sustain and advance their livelihoods and further
human development. - Programme 5 Strategy and Governance
- Lead the strategic management component of the
Department foster operational efficiency through
improved alignment between mandates, strategies
and institutional capacity provide strategic
guidance on social policy development,
coordination and evaluation facilitate and
develop the Departments strategic plan oversee
all entities, agencies and boards reporting to
the Department and coordinate monitoring and
evaluation across the sector.
9 Part B Programme Performance
10Programme 2 Comprehensive Social Security
- Programme Objective
- Ensure the development of social security
policies, monitor compliance with social
assistance policy prescripts for the provision of
a comprehensive system of social security, and
facilitate the payment of social assistance
grants to eligible households. - Social Insurance
- Completed a draft policy on contributory social
insurance which was subjected to review by
international panel of social security experts
and consulted with civil society on the policy. - Completed a Concept paper on the Institutional
Framework for Social Security - Completed four research reports on improving
access to economic opportunities by Social
Assistance beneficiary households as follows - Feasibility of a work seeker's grant.
- Feasibility of wage subsidies.
- Assessment of institutional framework to link
beneficiaries to economic opportunities. - Profiling of unemployed beneficiaries.
-
11Programme 2 Comprehensive Social Security
- Social Insurance (cont)
- The Southern African sub-regional liaison office
of the International Social Security Association
was opened in the Department in September 2008. - A steering committee comprising representatives
from South Africa, Zambia and Swaziland was
appointed, and its Terms of Reference agreed on.
The office hosted an international seminar on
extending access to social security on the
African continent. -
12Programme 2 Comprehensive Social Security
- Social Assistance
- Childrens Benefits
- Completed a study on attaching conditions to the
extension of the Child Support Grant (CSG) to
children between 15 and 17 years of age. - The CSG was extended to children until their 15th
birthday with effect from 1st January 2009. - The number of CSG recipients grew by 7 from
8,189,975 in March 2008 to 8,765,354 by March
2009 and the CSG was increased from R 210 to R
230 per month. - The Foster Care Grant was increased from 454,199
to 474,759 and this represent an annual growth
rate of about 5. - The Care Dependency grant saw an annual growth
rate of 5, with an increase in beneficiary
numbers from 102,292 to 107,065 by March 2009.
The care dependency grant income threshold for
adults was increased from R1,962 to 2,296 per
month.
13Programme 2 Comprehensive Social Security
- Disability Benefits
- A policy on Social Assistance for people with
chronic diseases was developed and taken for
consultation in the Social Cluster Task Team and
several stakeholders. - Older Persons Benefits
- The Social Assistance Act has been amended to
equalise the qualifying age for age old grants
between male and female applicants. This will
enable males to receive old age grant from the
age of 60 years in a phased manner during the
current MTEF period. This change has brought over
70 000 men aged 63 years and above onto the
social grant system. By March 2009, over
2,390,543 million elderly people were in receipt
of the old age grant. - The old age grant was adjusted from R 940 to R
960 per month. - The care dependency income threshold for adults
was increased from R 1 962 to R 2 296 per month
and the value of the assets was increased from R
338 000 to R 460 800 per year for unmarried
persons and doubled for married persons. - The provision of Social Relief of Distress
- The Social Relief of Distress budget was
increased by R500 million from R124 million to
R624 million to shield the poor from undue
hardships caused by rising food prices (caused by
the economic recession). -
14Programme 2 Comprehensive Social Security
- Provision of social assistance benefits to
Vulnerable groups - The programmes key achievements include
- The extension through SASSA, of the Child Support
Grant and the Amendment of the Social Assistance
Act to enable men to qualify for the age old
grant from the age of 60. - The opening of the Southern African Liaison
Office of the International Social Security
Association in the Department was also a key
achievement. - Social Security transfers and administration
- Over 13 million South Africans now access the
social grants system. The table below indicates
the total number of recipients over the last
three years - Grant March 2007 March 2008 March 2009
- Old Age pension 2,193m 2,229 m 2,390
m - Disability 1,427m 1,408 m
1,268 m - Foster Care 394,194 454,199
474,759 - Care Dependency 98,096 102,292
107,065 - Child support grant 7,863m 8,189 m
8,765 m - War Veterans grant 2,340 1924 1500
-
15Programme 3 Social Welfare Services
- Child Care and Protection Services
- New Child Care Legislation
- Children's Act regulations, norms and standards
were approved by the NCOP in March 2009. - Finalisation of draft Intersectoral National
Policy Framework - The Minister approved the five year National
Surveillance Study on child abuse, neglect and
exploitation - The Canadian International Development Agency
(CIDA) approved funding to the value of R35
million and the Child Welfare League of Canada
will serve as the technical expert on the
national surveillance study on child abuse. - Early childhood development (ECD)
- Department implemented the National Integrated
Plan for Early Childhood Development (NIPECD) in
partnership with key stakeholders, and this
promoted a common understanding of the programme.
- The Sector registered approximately 13,736 ECD
sites in 2008/09 - There is on average an ECD site for every 455
children in the country. - Paid per diem subsidy for approximately 411,203
children registered in ECD.
16Programme 3 Social Welfare Services
- Drug and Substance Abuse
- T he Prevention of and Treatment for Substance
Abuse Bill was passed by Parliament in November
2008 - DSD started with the implementation of Minimum
Norms and Standards for in patience Treatment in
Nine treatment centres located in provinces of
Mpumalanga, North-west, KwaZulu- Natal and
Eastern Cape provinces - The Mini Drug Master plan was approved and
distributed for implementation - Capacity building workshops on the implementation
of the National Drug Master Plan was held in
Gauteng, Kwazulu-Natal and Eastern provinces - Two hundred (200) service providers were trained
in Limpopo and Gauteng provinces - Twenty members of western Cape Provincial Forum
on Substance Abuse were trained on the
development of the Mini Drug Master Plan - In Mpumalanga, 350 members of the substance abuse
forum were trained on the implementation of the
National Drug Master Plan. - The drug prevention programme, Ke Moja, reached
over 20 million young people through radio, cell
phones and other media
17Programme 3 Social Welfare Services
- Services to People with Disabilities
- Completed the Implementation strategy for policy
on Disability - Developed and piloted a training manual on the
policy on the Management and Transformation on
Protective workshop nationally (in 17 protective
workshop). - Developed and piloted the implementation
(Transformation) plan for the policy in KZN,WC,
NW, GP and EC - Piloted Phases 2 and 3 of the Minimum Standards
for Residential Facilities in 4 facilities in the
Eastern Cape, and the implementation of Phase
1of the Policy and Minimum Standards on
Residential Facilities was rolled out in all
provinces - The policy on Rehabilitation and Community-based
services for people with disabilities was edited
and finalised.
18Programme 3 Social Welfare Services
- Service Standards
- Implemented Minimum Norms and Standards for
in-patient treatment centres in 9 treatment
centres in Mpumalanga, North-west, KZN, Free
State and Eastern Cape - Finalised Consultation (s) on draft Minimum Norms
and Standard for out-patient Treatment centres. - The business plan for the implementation of
Phases 2 and 3 of the development of norms and
standards for social welfare services were
developed and popularised within the structures
of the Department and in all provinces - Established programme management structures
nationally and provincially for the
implementation of the norms and standards
project. - Trained 500 stakeholders on the integrated
Service delivery Model and generic norms and
standards - Developed Quality assurance framework,
implementation strategy and training manual
framework on quality assurance .
19Programme 3 Social Welfare Services
- Services to Older Persons
- South African Plan of Action on Ageing developed
- Tabled Regulations of the Older Persons Act in
Parliament - Finalised Draft South African plan of Action on
Ageing - Established coordinating structures to ensure
collaborative service delivery to Older Persons - DSD created partnerships with the Department of
Sports and Recreation, Health and Western Cape
Social Development to promote Golden Games in
order to promote a healthy lifestyle among elders - A protocol to manage elder persons abuse was
developed to ensure that reported cases of Older
Persons abuse are followed up appropriately - Developed and piloted Costing templates in
Gauteng province
"
20Programme 3 Social Welfare Services
- Social Service Provider Management and Support
- Assessed all National Councils and conducted site
visits in order to ensure that they comply with
the Public Finance Management Act and the Policy
on Financial Awards to Service Providers and as a
result, R8,547m was spent on financial support t
at least 20 organisations - Draft Social Services Professions Bill was taken
for consultation and finalised with the South
African Council for Social Services (SACSSP) and
the Professional Boards for Social Work and Child
and Youth Care. - Developed and a Draft Policy on Social Services
and took it to the Transformation Management Team
and Heads of Department (HSD) for consultation.
21Programme 3 Social Welfare Services
- Child Care and Protection Services (continued)
- Strategies to Combat Child Abuse, Neglect and
Exploitation - Part A of the Child Protection Register (CPR) has
been maintained at all levels and the capturing
of information on the CPR increased by 154 in
six provinces. - Data base system for part B of CPR of capturing
unsuitable people has been developed and the
enhancement of Part A register according to the
Children's Amendment Act was completed . - Plan developed and approved for the National
Surveillance Study on Child Abuse, Neglect and
Exploitation between DSD and CIDA (Canada) - Contract signed between DSD and Child Welfare
League of Canada and detailed project plan
submitted by the CWLC who will act as the
technical expert on the study on child abuse and
neglect.
22Programme 3 Social Welfare Services
- Alternative Care
- Initiated, with support from UNICEF, a research
project on cluster foster care models to assist
the DSD to decide on appropriate models to adopt
for standardisation - Developed Protocols and guidelines for foster
care. -
- Adoptions and International Social Services
- Minister approved Inter-country adoption practice
guidelines - Attended International Social Services Council
and Executive Committee meetings in Geneva in
May 2008 and paid ISS annual membership fee - Developed International Social Services (ISS)
guidelines and took them to stakeholders for
consultation - Dealt with 519 ISS cases and returned one
distressed child to Brazil
23 Programme 3 Social Welfare Services
- Services to Children and Young People
- Orphans and Vulnerable Children
- Developed Draft Guidelines for Statutory Services
to Child-Headed - Finalised promotional material for Child Headed
Households - Children Living and Working on the Streets
- -Developed Final Draft Policy Framework for
Children Living and Working on the Streets - Information Management System for Early Childhood
Development - -Developed Draft Specifications for the
Information system for new and existing ECD sites
and took them for consultation with provinces. - -Developed and Updated Manual database of
registered ECD sites - -Conducted Capacity Building on National
Integrated Plan on Early Childhood Development
(NIPECD) in the Western Cape, Limpopo, Gauteng
and Free State provinces
24Programme 3 Social Welfare Services
- Families, Victim Empowerment Programme (VEP) and
social crime prevention - Services to Families
- Completed Phase 1 of the Social Crime Prevention
Strategy - Finalised Reception Assessment and Referral
Centre (RAR, Home Based Supervision (HBS)
guidelines and national resource directory. - Developed a draft Social Crime prevention
Strategy - Conducted training for probation officers on the
following - Norms and standards on
Diversion 201 officers trained - Report writing 253 officers were trained
- Customer care 164 officers
were trained - Conducted Re-orientation and training of 308
Assistant Probation Officers as Social Auxiliary
Workers together with the South African Council
for Social Services Profession
"Building a caring society. together"
24
25Programme 3 Social Welfare Services
Families, Victim Empowerment Programme (VEP) and
social crime prevention (continued)
- Reviewed Shelter Strategy for Victims of abuse
after consultation with key stakeholders - Completed a review and audit of the National
Resource directory - Approved DSD strategy for families.
- Evaluated and Piloted Strategy on the Engagement
of Men and Boys in the Prevention of Gender-based
violence in North-West province, - Developed Guidelines on human trafficking,
domestic violence, rape and violent crimes - Finalised and Approved Framework and Guidelines
on Positive Values (Moral Regeneration).
"Building a Caring Society. Together"
26Programme 3 Social Welfare Services
- HIV/AIDS
- Home /community-based care and support
- Finalised National Action Plan on psychosocial
support (after consolidating inputs from all
stakeholders into the plan). - Presented draft HCBC policy framework strategy at
the HIV and AIDS coordinators workshop in June
and October 20008 and presented final draft
during meeting with Department of Health - Reviewed current Memoranda of Understanding
between DSD and Lovelife and PPSA - Developed a module for monitoring and evaluating
HCBC and data-collection tools for the module
were implemented by 28 HCBC organisations in
KwaZulu-Natal and North-West provinces - 41908 community caregivers received accredited
training in terms of the National Qualifications
Framework (NQF) levels 1-4 through NGOs - Developed Draft modules on psychosocial care and
support as part of the implementation of the
National Action Plan on psychosocial support for
children and adults living with HIV and AIDS -
"Building a caring society. together"
26
27Programme 3 Social Welfare Services
- HIV/AIDS (continued)
- The National Action (NAP)
- Completed research study on situational analysis
of Child-Headed Households in South Africa and
distributed its findings to district and
provincial HIV/Aids coordinators - Developed Training manuals on Child Care Forums
and succession planning - National Audit of the Child Care Forums
- A service provider was appointed to conduct an
audit of the child Care Forums through the
country to determined the geographical location
of forums, the range and coverage of their
services, the nature of their capacity, their
training and support needs and their sourcing of
funding and costs - The findings of the audit of Child Care Forums
were presented at the NACCA meeting in February
2009 and at the provincial and district
coordinators meeting in March 2009 -
"Building a Caring Society. Together"
27
28Programme 4 Community Development
- Community Development
- Programme Objective
- Develop, monitor and facilitate the
implementation of appropriate policies,
strategies and programmes aimed at strengthening
the potential of communities, including youth, to
sustain and advance their livelihoods and further
human development. - Community Development Policy and Service
Standards - Developed a draft community development policy
framework. - Conducted a Skills Audit of Community Development
Practitioners in all the 9 provinces. - Developed and took for consultation 8 new
Community Development Standards at NQ level 3 and
(took for consultation 2 generic unit standards
at NQ level 4) - Appointed a national Community Development
Professionalization Task Team to drive the
process of registration of practitioners. - Developed a database of community development
practitioners which will be translated into a
register once the registration body is
established. - Conducted a study to assess challenges and the
support required by CBOs in relation to
coordination and integration of services at a
local level (final report available)
29Programme 4 Community Development
- Community Development (continued)
- Registration of NPOs
- Registered 6, 819 NPO applications (out of 14,207
received) within two months. This increased the
total number of registered NPOs to 56 237. - 507 organisations were de-registered for
non-compliance with the NPO Act, and two of these
were re-instated after complying with the legal
requirements (e.g by submitting annual report to
the Department) - Appointed 8 new members to the Panel of
Arbitrators who convened four meetings that
included orientation and adjudication of cases. - Enhanced Institutional capacity of the sector
- Completed research on the benchmarking and
reviewing of NPO governance practices. - Undertook the evaluation of the CDP train-a
trainer programme
30Programme 4 Community Development
- Sustainable livelihoods
- Household profiling
- Finalised a draft qualitative household profiling
tool which was endorsed by all provincial
Sustainable Livelihood Approach (SLA) programme
managers in July 2008. The tool was piloted in
Mpumalanga. - The tool was also used in profiling of 2 855 poor
households from Western Cape, Mpumalanga,
Gauteng, North West and Free State provinces. - Facilitated the participation of 200 Community
Development Practitioners (CDPs) in the
implementation of the quantitative household
profiling tool, which was developed by the
Presidency and Statistics South Africa for the
War on Poverty campaign. - War on Poverty campaign
- DSD participated in provincial launches of the
War on Poverty campaign, which is spearheaded by
the Presidency.
31Programme 4 Community Development
- War on Poverty campaign (cont)
- The Department is represented in the National
Task Team of the War Room on Poverty. - Facilitated the construction of 20 vegi-tunnels
in Ga Kgatla village in Limpopo in partnership
with the Department of Agriculture and the office
of the Premier. - Developed a draft community profiling framework,
which was tested in Kagiso township, Gauteng
province - Integrated Portfolio of programmes
- Facilitated the construction of 60 vegi-tunnels
in NW, LP and EC provinces. 20 of these were
erected in the newly resettled community of
Bokfonten in North West, while 20 were erected in
the Dutyini area of the Eastern Cape. The village
of Ga-Kgatla in Limpopo received 20 vegi-tunnel
as well.
32Programme 4 Community Development
- Sustainable livelihoods (continued)
- Fruit Trees
- A proposal for fruit trees to support
deforestation, food security and greening in the
three SLA learning sites, which are located in
EC, LP and NW has been submitted to DWAF. The
proposal was approved and the project will be
roll out during the 2009/10 financial year. - Food Banks
- Developed a food banking concept document.
- Facilitated the signing of a Memorandum of
Understanding between the SA government, the
Community Food Banking Network of SA and the
Global Food Banking Network. - Supported 4 Community Food Banks in Cape Town
(WC)Durban, (KZN) Port Elizabeth (EC),
Johannesburg (Gauteng) and one rural food bank
pilot in Umkhanyakude district municipality
(KZN).
33Programme 4 Community Development
- Sustainable livelihoods (cont)
- Total Value Chain Model
- Introduced the total value chain poverty
alleviation model using a hemp project in the
Eastern Cape to demonstrates the potential of the
model in poverty eradication. - The first phase of the model has been
successfully implemented with the participation
of 100 beneficiaries and several stakeholders in
East London, Eastern Cape. - Developed and tested the Toolkit for CDP in SA
and piloted/tested it in the Northern Cape and
key findings on the pilot were costed and
training process plans are ready for
implementation during 09/10 financial year. - Held consultations with Eastern Cape, North West
Limpopo provinces on the development of a
social development cooperatives concept document. - Monitoring of Sustainable Livelihoods
Implementation Partners - Contracts of the National Association of People
Living with HIV AIDS (NAPWA), the National
Association of Burial Societies of SA(NABSSA)
Food Bank SA, South African Hemp Industries,
Khanya-African Institute for Community-driven
Development and Independent Development Trust
were developed and service level agreements were
also generated.
34Programme 4 Community Development
- Sustainable livelihoods (cont)
- Conducted site visits to Kalkfontein community to
asses progress on construction of community hall - Conducted 3 monitoring site visits to
Silindithemba Co-op and Siyaqhubeka Drop-In
Centre - Conducted site visit workshops to 12 disability
workshops in Limpopo - DSD facilitated the implementation of poverty
relief projects that were supported by the
Independent Development Trust (IDT) and handed
over to provinces. Through this process 408
projects were successfully handed over while 102
of these are fully functional after being turned
into cooperatives. -
35Programme 4 Community Development
- Youth
- Youth Development Policies and strategies
- Developed guidelines on the Youth Development
Strategy. - DSD audited 5 pieces of legislation affecting the
youth. The audit had to be completed internally
due to financial constraints. This requires
further consultation. - A national youth policy was approved by Cabinet
- Improved services for youth
- A youth service programme toolkit which covers
the youth development strategy and national youth
service was developed and distributed to
provinces. - Facilitated the established youth directorates in
5 provinces to strengthen institutional capacity
for youth development. - Cabinet approved the national youth development
policy.
36Programme 4 Community Development
- Youth (continued)
- Mainstream and integrate the National Youth
Service Programme (NYS) - Conducted a training in North West Province.
- Masupatsela Pioneer Programme
- Developed a framework and 6 modules for the
Masupatsela curriculum. - 10 Cuban experts were interviewed and selected
for deployment and a contract between DSD and
Cubatecnica was signed. - 2,114 youth pioneers were recruited and oriented
while 1,754 pioneers participated in War on
Poverty initiatives.
37Programme 4 Community Development
- Community Development (continued)
- Professionalisation of Youth Work
- In March 2009, DSD hosted a national youth work
policy conference. The research report on the
state of youth work in SA was finalised and
launched. The process of professionalisation is
continuing and the declarations of the conference
clearly give direction to the process of
professionalizing youth work. - Youth volunteerism
- Held 4 roundtable workshops on youth volunteerism
under the themes - Youth Volunteers for Development
- Creating an Enabling Environment for Youth
Volunteerism in the Private Sector, - Creating an Enabling Environment for Youth
Volunteerism in the Public sector , and - Strengthening Youth Volunteerism in Civil
Society. - Consolidated a draft framework on youth
volunteerism , although it still requires
further consultation.
38Programme5 Strategy and Governance
- PROGRAMME OBJECTIVE
- To lead the strategic management component of the
Department foster operational efficiency through
improved alignment between mandates, strategies
and institutional capacity provide strategic
guidance on social policy development,
coordination and evaluation strategic plan
facilitate and develop the departments strategic
plan oversee all entities, agencies and boards
reporting to the Department. - Entity oversight and Management
- Finalised and facilitated the approval of
Compliance Reporting Framework for Public
Entities (SASSA and NDA) - Developed and facilitated the approval of Terms
of Reference for the Ministers interface with
SASSA and the NDA - Developed and facilitated the signing of MoU
between the Minister of Social Development and
the NDA Board - Conducted Performance reviews for entities based
on their strategic plans
39Key Social Security Institutions (Independent
Tribunal for Social Assistance Appeals)
- Established an Independent Tribunal for Social
Assistance Appeals - The tribunal adjudicates appeals emanating form
the grant applications process administered by
SASSA. - Minister appointed 128 individuals to serve on
the tribunal, which includes 58 medical
practitioners, 47 legal experts and 23 members of
civil society. - By March 2009, the tribunal had considered and
finalised 13,269 of the 60,970 appeals lodged
during the reporting period.
40Special Projects Coordination
- Completed the Expanded Public Works Programme
(EPWP) Social Sector Action Plan. - By March 2009, the social sector had created 174
255 jobs through EPWP, well above the five year
target of 150 000. - Finalised the review of Phase 1 of the EPWP and
findings of the review and broad principles for
framing EPWP Phases 2 were endorsed by Cabinet. - Commenced with the process of designing Phase 2
of EPWP in May 2008 and pa reference group and
steering committee to drive the process .
41Programme 5 Strategy and Governance Cont.
- Social Policy
- Completed Audit of research commissioned by
Directorates in the Department and developed
mechanisms to ensure value and quality of
research. - 54 civil servants working in policy development
at national and provincial departments received
training in social policy. This brings to 200,
the number of senior officials trained in social
policy since 2005 - In order to promote the research-policy nexus and
promote evidence based policy making in the SADC
region, the DSD has embarked on a process of
securing joint leadership and ownership with
other countries in the region , which will allow
the holding and hosting of conferences and
workshops in countries committed to this
initiative. - With the adoption of the Draft SADC Regional
Social Policy Framework, the DSD initiated a
network of policy makers and high level civil
servants in countries such as Swaziland,
Zimbabwe, Namibia, Zambia, Malawi, Botswana,
Mauritius . The DSD is moving towards
formalisation through the holding of annual
events. -
42Programme 5 Strategy and Governance Cont.
- Monitoring and Evaluation.
- In order to create facilitated an effective ME
system in the social sector, especially the
provinces, DSD piloted an electronic monitoring
system in 3 provinces as planned. - A modified electronic monitoring and paper-based
tools were updated based on the pilot and
pretesting projects is available. - Developed and finalised Non-Financial
Performance Indicators and a compendium of
indicators for monitoring social sector
performance. - Facilitated the training of 35 officials from the
social sector in the International Programmed for
Development Evaluation Training (IPDET) offered
by the World Bank and Carleton University,
Canada, in July 2008. This seeks to build ME
capacity in the social sector - An evaluation framework with appropriate
indicators has been finalised. - An impact evaluation plan for the Child Support
Grant has been developed and the project will be
implemented in the next financial year.
43Programme 5 Strategy and Governance Cont.
- Population and Development
- Finalised a series of thematic chapters for the
country-wide report (see below) were finalised by
31 March 2009. The final report is joint
policy10/ICPD15 report. The thematic chapters
of the report were loaded onto the population
website (www. population.gov.za). - The final ICPD15 country report and related
questionnaires, compiled on the basis of evidence
derived from the policy10 review process, were
submitted to UNECA in Addis Ababa in March 2009. - The draft thematic chapters (for 10-year policy
review) on migration and urbanisation, poverty
and inequality, reproductive health and rights,
gender equality equity, children, families
households, youth, HIV and Aids, plus an overview
of population trends dynamics, as part of the
population policy10 review process were
completed at the end of March 2009. - Concept paper on technical facility drafted, and
taken for consultation to stakeholders to
consider alternatives in June 2008. Concept was
adjusted to properly link with the Toolkit for
Integrated Planning (TIP), developed by DPLG,
DST, and Housing in partnership with the CSIR.
44Programme 5 Strategy and Governance Cont.
- Population and Development (cont)
- Completed Field work for second phase of nodal
research project. - Submitted Final report on findings of Phase 2 of
multi-year nodal point research to Minister in
August 2008, and to Presidency, DPLG, and DSD
Executive Committee in September 2008. - Deputy Minister launched the report, entitled,
Building Sustainable Livelihoods An overview,
at a Public Seminar on Policy10 in December
2008. - A major outcome of the research project was the
production of evidence on socio-economic and
demographic baselines for each node and an
overview of each node, and information on urban
and rural project designs and progress with the
implementation of current UNFPA Country Programme
and Poverty Relief Programme. -
45Programme 5 Strategy and Governance Cont
- Population and Development cont
- The Department conducted Capacity Building on
Population and Development as follows - Applied Population Science in Training and
Research (APSTAR) training programme - FBO capacity building (2 Training Sessions to
FBOS which extended training to 80 Master
Trainers in Limpopo and Eastern Cape) - Population, Environment and Development nexus
training - Population, HIVAIDS capacity development course
- Towards sustainable development Population
environment and development in integrated
development planning. -
- FBO sensitisation workshops conducted in Eastern
Cape and North West in partnership with UNFPA and
EC Council of Churches Sensitised and obtained
commitment from the top leadership of the Shembe
Group for the FBO capacity building project - -A Major outcome of FBO capacity building
programme was a better understanding of
population issues among religious leaders and the
integration of population issues into church
activities - -Population and development strategies were
disseminated via press and electronic media in
Limpopo KZN.
46Programme 5 Strategy and Governance Cont.
- Population and Development cont.
- Conducted Training on Population, Environment and
Development (PED) Nexus in Cape Town (31
participants) and Free State (42 participants). - Presented a capacity building programme on
Leadership Training in Environment and
Sustainable Development for youth in the Eastern
Cape in March 2009, focusing on issues of
sustainable development and leadership skills for
youth. - Population HIV and AIDS Capacity Development
Course Conducted 10 population HIV AIDS
training courses Free State 3 Mpumalanga 2
North-West 1 Eastern Cape 1 Western Cape 1
KwaZulu-Natal 1 Gauteng 1. A total number of
116 individuals from all spheres of government
civil society participated in and benefitted from
this initiative.
47Programme 5 Strategy and Governance Cont
- Strategy, Planning and Development and Risk
Management - Produced a high level concept document that will
guide the process of developing a sector
strategy. A planning handbook was finalised and
edited in January 2009. In support of the
planning handbook, a checklist for the assessment
of the Annual Performance Plans for provinces was
also developed. - Institutionalised an enterprise risk management
function within the Department with the necessary
documentation, developed and operationalised
processes and systems. - Developed a sector infrastructure framework with
a toolkit to facilitate infrastructure planning
and implementation. Developed a national and
sector infrastructure plan for the MTEF period. - A Gender Needs Analysis Study has been completed
and integrated into the DSD Gender Policy. - SADC Gender and Development Protocol was
popularised on National Womens Day 2008.Attended
the 53rd session of the United Nations Commission
on the Status of Women
48Programme 5 Strategy and Governance Cont
- Strategy, Planning and Development and Risk
Management - Launched the Customer Care Charter.
- -Final Customer Care Strategy is ready for
implementation. - -Launched and Distributed Customer Social
Services Handbook at Nyandeni Great Place
(Eastern Cape). - -Launched Complaints Coordination guidelines and
Manual that are ready for implementation. - Introduced, coordinated and managed an Internal
Consulting Capacity Building Programme (ICON).
The programme seeks to capacitate DSD staff with
rare skills that so as to reduce reliance on
external service providers.
49International Obligations Key Achievements
- During the 2008/09 financial year the Minister
undertook 11 international official visits while
the Deputy Minister undertook 9 such visits. - Minister
- Purpose of the visits
- To pursue the social development mandate and
discharge the Ministers United Nations
Educational, Scientific and Cultural Organization
(UNESCO) leadership functions, in line with the
International Relations Peace and Security
Cluster objectives of promoting the African
agenda and fostering international solidarity - International Conference on Decentralisation and
Coordination The Twin Challenges of Labour
market Policy in Italy - World Ageing Conference in Abu Dhabi, United
Arab Emirates - 52nd session of the OECD Centre for Enterprise
Development, Local Employment and Economic
Development Programme in Paris, France - NAASP Plus Ministerial Conference on Capacity
Building for Palestine in Indonesia
50International Obligations Key Achievements
- Purpose of the visits (cont)
- Dialogue on Social Policies in South East Asia
(Bangkok, Thailand) - Summit on Geneva declaration on armed violence
and development - World Economic Forums Global agenda Council on
empowering Youth in Dubai - Second Forum of Arab Ministers of social Affairs/
Social Development, The role of corporate social
responsibility in social development in Arab
Region in Amman, Jordan - Official visit in Sweden
- 47th session of UN Commission on Social
Development in New York - Meeting of the G8 Labour and Social Policy
ministers in Rome
51International Obligations Key Achievements
- Deputy Minister
- Purpose of the visits (continue)
- International consultative conference on Poverty
and Development in Mauritius - 6th Ordinary session of Au Labour and Social
Affairs Commission in Addis Ababa, Ethiopia - 3rd International meeting of Spanish and African
women in Niger - 12th BIEN Conference on Basic income in Ireland
- SA/DRC Partnership Conference in DRC
- XVII International AIDS Conference in Mexico City
- Hope 2008 International Conference on Alcohol and
Drugs in Mumbai, India - AU meeting in Namibia
- 53rd session of the UN Commission on the status
of Women in New York
52International Obligations Key Achievements
- Strengthening African Institutions of governance
- Concluded multi-lateral agreements with Mauritius
and Mexico. - Agreements with Mali, Zimbabwe, Sudan and Brazil
prepared, awaiting approval. - DSD participated in the following SADC and AU
meetings SADC Population and Development
meeting AU Population Development AU meeting of
Social Development in Namibia. - Contribute towards the post-conflict
reconstruction and development in Africa - Four-member team based in the DRC facilitated the
training of 200 senior managers on project
management and human resource development. - Coordinated a conference on donor mobilisation
and conference on engagement of civil society.
53International Obligations Key Achievements
- Promotion of international solidarity
- Participated in the working group on social
development and the IBSA working group on civil
society during the IBSA summit in India. - An implementation plan with Cuba is in operation
while collaboration on community development has
been initiated with Jamaica. - DSD continue its collaboration with Malta.
- Collaboration with Oxford University and UNESCO
is ongoing. - Shared vision on international agenda
- Participated in benchmarking initiatives with
DRC, Sweden, Canada , United Kingdom, Mexico and
Chile.
54Strategic Challenges
- During the year under review, the Department
faced among others, the following challenges - Human Capital A high staff turnover in the
Financial Planning and Expenditure Monitoring
Unit had a negative impact on effectiveness of
operations. Some vacated posts could only be
filled during the third and fourth quarters of
the 2008/09 financial year, and some are in the
process of being filled. - Financial Constraints The labour relations
strategy for social sector could not be completed
due to financial constraints. - Legislative challenges The Harmonised Assessment
Tool for assessment of the disability grant could
not be implemented as the Social Assistance Act
could not be amended to give effect to
implementation (see slides on legislative
programme for details) - Legislative challenges The draft Bill on Social
Services could not be finalised since the draft
policy on social services is yet to be approved
by relevant structures. - Accreditation of Service Providers The lack of
accredited service providers for community
caregivers in the Home/Community-Based Care
programme. - Interdepartmental/ institutional challenges The
implementation of the national action plan for
children affected by HIV could not proceed as
planned as a result of poor representation by
stakeholders on the National Action Committee for
Children Affected by HIV and AIDS(NACCA).
55Part C FINANCIAL REPORT 2008/09
56AIM OF THE VOTE
- The aim of the Department of Social Development
is to provide protection against vulnerability
and poverty and ensure the provision of a
comprehensive, integrated and sustainable social
development service.
57DEPARTMENTAL SPENDING
R000
99,4 Actual Spending
58DIVISION OF 2008/09 DEPARTMENTAL
EXPENDITURE R000
592008/09 OPERATIONAL SPENDING Excluding transfer
payments
99,25 Actual Spending
R000
60DIVISION OF 2008/09 OPERATIONAL EXPENDITURE
R000
612008/09 Matters of Importance
- Following the shifting of the social assistance
function from provinces to the national
government, the entire budget for the social
assistance transfers (social grants) of R71,176
billion was voted to the Department. - SASSA remains responsible for the distribution of
these funds to social grant beneficiaries through
various distribution channels. - The Director-General of the Department of Social
Development remains accountable for the
expenditure and also reports as such in the
Departments statements. - In terms of the present flow of funds
arrangement, any shortcomings and/or failures in
SASSAs internal control systems in the area of
social assistance transfers may have a negative
impact on the financial statements of the
Department of Social Development.
622008/09 Unspent Funds
- Under-spending at the end of the 2008/09
financial year was R 457,471 million. - Programme 1 Administration R 764 000
- Under spending relates to the normal staff turn
over. - Programme 2 Comprehensive Social Security R
451,914 million - Under-expenditure relates mainly to the social
assistance grants. - Programme 3 Policy Development, Review and
Implementation Support for Welfare Services R
2,141 million - Under-expenditure relates mainly to unforeseen
administrative delays in the execution of planned
projects.
632008/09 Unspent Funds Cont.
- Programme 4 Community Development R 2,103
million - The bulk of under-expenditure relates to
transfers and subsidies and is mainly due to
non-compliance with prescripts by NPOs. - Programme 5 Strategy and Governance R 549 000
- Under-expenditure on current payments relate to
projects that will only be finalised in the
2009/10 financial year.
"Building a Caring Society. Together"
63
64AUDITOR GENERALS REPORT
652008/09 Auditor Generals Report
- The Department received an unqualified audit
opinion for the seventh year in a row. - The Auditor-General raised certain matters of
concern in relation to certain weaknesses - Control                       13
- Financial                   49
- Compliance                9
- Value for money        1
- Action plan has been developed to address the
identified weakness. Implementation of this plan
is being monitored on a monthly basis. - 35 of weakness identified have already been
addressed as they related to disclosure of
financial statements.
662008/09 Auditor Generals Report
- Emphasis of matter
- Flow of funds
- As indicated in the report of the accounting
officer, despite the grant expenditure being
reported in the annual financial statements of
the Department of Social Development, a dual
accountability relationship exists between the
Department and the South African Social Security
Agency over the grants. The status of the current
relationship therefore results in a situation
where actions of the South African Social
Security Agency have an impact on the audit
report of the Department of Social Development on
matters concerning grant expenditure.
672008/09 Auditor Generals Report
- Emphasis of matter (Continued)
- Basis of Accounting
- The Departments policy is to prepare financial
statements on the modified cash basis of
accounting determined by the National Treasury.
682008/09 Auditor Generals Report
- Other Matters
- Social Assistance Grants
- The responsibility for grant administration and
the payment of grants reside in the South African
Social Security Agency. The following matters
arose from the processes and activities that
transpired in the South African Social Security
Agency - Social Assistance Grant Debtors
- The following shortcomings regarding the social
assistance debtors were identified - Repayments made by the grant debtors originated
from multiple sources, including bank deposits.
Numerous cash deposits contained inadequate
references which resulted in unallocated receipts
not being allocated to debtor accounts. The
Department is in consultation with the National
Treasury regarding this issue. - A single dedicated financial debtor system did
not exist for the management of grant debtors. - Due to the circumstances affecting the majority
of the debtors (being poverty stricken
individuals), many of the recorded debtors may
not be recoverable or recovery may not be cost
effective.
692008/09 Auditor Generals Report
- Other Matters (Continued)
- Social Relief of Distress Grants
- During the 08/09 financial year, the South
African Social Security Agency was tasked with
the distribution of the Social Relief of Distress
(SRD) grant (which consisted of either food, food
vouchers, school uniforms or cash) to alleviate
general poverty. The following shortcomings
existed within the processes of the Agency in
distributing the grant to the intended
beneficiaries - Documentation critical to the application for the
grant was not complete. - It could not be confirmed in all instances that
the correct person received the correct amount of
relief aid at the correct time and place. - Effective controls in respect of food vouchers
and aid purchased to be distributed were not
implemented. - Beneficiary applications were captured offline
which could have resulted in unnoticed erroneous
duplication of payments. - Distribution of relief aid was not performed in a
standardised or consistent manner in all
provinces. - Supply chain management requirements, were not
adhered to in the procurement of relief aid. - Â
702008/09 Auditor-Generals Report (Cont
- Matters of Governance
- Material adjustments were made to the financial
statements after being submitted. The reason for
this was due to the insufficiency of human
resources within the finance section of the
Department.
71 Way Forward on 2008/09 Audit Outcome
- A Strategic Task Team on the social assistance
grant debtors has been established with
representatives from SASSA and DSD that will be
supported by representatives from the National
Treasury. - A comprehensive plan, which will include the
transfer of functions from the Special
Investigating Unit to SASSA, with specific
reference to the social assistance debtors is in
the process of completion. This plan will also
include the future management of the social
assistance grant debtors currently managed by
Special Investigation Unit. - A detailed action plan has been developed and
implemented to address the concerns raised by the
Auditor-General in his Management letter with
regard to aspects related to compliance control
financial administration and value for money. Â
72PART DLegislative Programme for 2008/09
73Legislative Achievements for period 2008/09
- The Childrens Act, 2005, the Old Persons
Act,2006, and the Childrens Amendment act, 2007 - These Acts are not yet fully operational.
- Certain sections of the Childrens Act were
operationalised in 2007. - These Acts require regulations prior to being
fully operationalised. - By March 2009, Regulations for these Acts had not
yet been finalised. It is hoped that these will
be finalised by March 2010. - Prevention of Treatment for Substance Abuse Bill
- The Prevention of and Treatment for Substance
Abuse Act was signed by the President in February
2009.
74Legislative Plans for the Period 2008/09
- Regulations
- Regulations for the following pieces of
legislation were scheduled for finalisation
during the 2008/09 financial year - Social Assistance Act,2004 (Regulations finalised
in August 2008) - Childrens Act,2005 (could not be finalised)
- Older Persons Act,2006 (could not be finalised)
- Social Services Professions Act, 1978 (could not
be finalised) - The following pieces of legislation could not be
introduced due to a new Cabinet directive which
requires that a policy be approved by cabinet
before a Bill is drafted - Social Service Professions Bill
- National Development Agency Amendment Bill
- Social Assistance Amendment Bill
- Social Relief Funds Bill
75