Title: French Engineering, LLC


1
Work Zone Safety and Mobility Traffic Analysis
and Impacts
  • French Engineering, LLC
  • Greenhorne OMara, Inc.
  • Pennsylvania Department of Transportation
  • Bureau of Highway Safety and Traffic Engineering
  • October 27, 2009

2
Agenda
  • Background Information
  • DAWB Theory and Application to Freeway /
    Interstate Projects
  • Questions on Traffic Analysis
  • Lessons Learned / Group Discussion
  • Course Wrap Up
  • Text questions throughout

3
Background Information
4
State Survey and Background Work
  • Five States Contacted
  • Florida, Maryland, Michigan, Ohio, and Virginia
  • Spreadsheets provided by 4 of 5
  • Key Findings
  • Quickzone only used for largest projects
  • All states developed their own spreadsheets
  • Ohio spreadsheet was foundation of the one
    developed for PA
  • Estimating work zone capacity is usually weakest
    link in analysis
  • Borrowed some FL methodologies for capacity
    estimation

5
Overview of Delay Computation Methodology
  • Identify Critical Activities from a Traffic
    Capacity / Bottleneck Point of View
  • Develop Approach Based on Available Tools, Data,
    and Need for Multi-Period Analysis
  • Execute Approach

6
Importance of Analysis Period
  • Undersaturated, Uncongested Scenarios
  • Single Period of Analysis May Be Sufficient
  • Available Tools are Many
  • Oversaturated, Congested Scenarios
  • Multi-Period Analysis May Be Required
  • DAWB Spreadsheets In Conjunction with Other
    Programs
  • Other Programs Exclusively if Precision is
    Required

7
Delay Analysis Workbook (DAWB) Theory and
Application
P\bhste_shared\workzones\WZ traffic analysis
8
Overview of DAWB
  • 6 Spreadsheets Contained Within
  • Capacity Estimation
  • Bottleneck Analysis
  • Quick Bottleneck Analysis
  • Existing Bottleneck Analysis
  • Two-Way One-Lane Not to be discussed today
  • Detours Not to be discussed today
  • Can Be Used as Standalone or With Other Programs
  • Key is Estimate of Capacity and source of demand
    information
  • Designed for Easy Multi-Period Analysis

9
Capacity Estimation Spreadsheet
10
Overview
  • Tools and science available to estimate work zone
    capacity are expected to improve in the future
  • Spreadsheet is designed to provide the user with
    some guidance for the selection of a capacity for
    the work zone
  • Three tools provided
  • Freeways
  • Two-Way One-Lane Work Zones
  • Other Facilities
  • Only Freeways will be discussed today
  • Other tools (or experience) may provide better
    estimates

11
Freeways (HCM Chapter 22)
  • Short-Term Work Zones
  • Capacity (1600 I) fhv N R
  • Where
  • Capacity adjusted mainline capacity (vph)
  • I adjustment factor for type, intensity, and
    location of work activity (ranges from 160 to
    -160 pcphpl)
  • R adjustment for on-ramps in the taper or
    within 500-ft downstream of the beginning of the
    full lane closure
  • R should be made equal to the ramp volume, not to
    exceed half the capacity of one lane
  • Nnumber of lanes open through the short-term
    work zone
  • fhv heavy vehicle factor

12
Freeways (HCM Chapter 22)
  • Long-Term Work Zones
  • Summary of Capacity Values for Long-Term Freeway
    Work Zones

Notes If crossovers are used, the capacity is
close to the value 1,550 vphpl If no crossover
is needed, but only a merge down to a single
lane, the value averages to 1,750 vph
13
Freeways (HCM Chapter 22)
  • Lane Width Considerations
  • Capacity decreases 9 when lane widths drop from
    11-ft to 10-ft
  • Capacity decreases 14 when lane widths drop from
    11-ft to 9-ft
  • Capacity decreases could be greater with the
    influence of trucks

14
Example
  • Short-term freeway closure with no ramps but a
    very active work zone. One (of two) lanes to
    remain open. Level terrain and 5 trucks.

15
Example Solution Hand Calcs
15
  • Solution (HCM)
  • Capacity (1600 I) fhv N R
  • I -160 R 0 ET 1.5 PT 5 N1
  • fhv 1 / 10.05(1.5 1) 0.976
  • Capacity (1600 -160) 0.976 1 0
  • Capacity 1405 vph, rounded to 1400 vph

16
Example Solution in DAWB
16
17
Quick Bottleneck Analysis Spreadsheet
USE BOTH LANES TO MERGE POINT
18
Quick Bottleneck Overview
  • Intended for use when
  • Only AADT and work zone capacity are known
  • Work zone capacity is somewhat constant
    throughout the day
  • Daily Commuter Route
  • Performs queuing and delay analysis based on
    cumulative arrivals and departures versus time
  • If more volume information is known, weekend
    peaks are critical, or capacity is highly
    variable, use Bottleneck Analysis Spreadsheet.

19
Queue / Delay Model
20
Spreadsheet Inputs
  • One Way Work Zone Capacity
  • Average Annual Daily Traffic (AADT)
  • Percent of Peak Period (gt1000 vph) Traffic
    Diverted ()
  • Number of Lanes for Queued Vehicles (lanes)
  • Percent Trucks (Daily)
  • Traffic Pattern Group (TPG) (Number 1 to 10)
  • http//www.dot7.state.pa.us/itms/main.htm
  • Inbound 1, Outbound 2, Neutral 3

21
Spreadsheet Outputs
  • Number and Duration of 15-Minute Delay Episodes
  • Number and Duration of 30-Minute Delay Episodes
  • Total Daily Delay
  • Queue Length (in vehicles and miles) at the End
    of Each Hour
  • Delay for the Last Vehicle of Each Hour

22
Example 1Analysis of Freeway Lane Closure /
Restricted Typical Section Using AADT and TPG
Information
23
Overview of Example
  • One of the two existing lanes is to be closed on
    I-70 / I-79 Eastbound in Washington County
    upstream of the south junction
  • Perform quick analysis using information from
    PennDOT ITMS website and minimal other
    information
  • Use Capacity Estimation and Quick Bottleneck
    Analysis spreadsheets

24
Location Map
PROJECT LOCATION
25
PennDOT Video Log
http//www.dot7.state.pa.us/ividlog/video_locate.a
sp
26
PennDOT ITMS Information
http//www.dot7.state.pa.us/itms/main.htm
27
Capacity Estimation
28
Quick Bottleneck Analysis Inputs
29
Quick Bottleneck Analysis Outputs
30
Quick Bottleneck Analysis Outputs (Continued)
30
31
31
32
Example Conclusion
  • Proposed closure would have sustained 15-minute
    delays lasting more than two-hours as well as
    30-minute delays
  • Significant Project
  • Remember
  • Volume estimation off hourly distributions from
    Table 350 in Traffic Data Report. Update to
    2008 edition!
  • Actual volumes will likely provide better results.

33
Bottleneck Analysis Spreadsheet
34
Overview
  • Use when
  • Actual hourly volumes are available
  • Capacity varies by the time of day
  • Facility is not an existing bottleneck
  • Outputs and computations are identical to those
    in Quick Bottleneck Analysis Spreadsheet
  • Inputs are same except
  • One-Way Annual Average Daily Traffic (AADT),
    Traffic Pattern Group and Direction, and One-Way
    Capacity are omitted
  • Hourly volumes and capacities are directly input

35
Example 2I-70 Fulton CountySingle Lane Closure
36
Overview of Example
  • I-70 Eastbound between Breezewood and Maryland
  • Long project 14 miles Crosses mountain ridge
    and has three interchanges and a rest area
  • One week of hourly traffic data collected in
    August 2008 available
  • Traffic queue and volume information from similar
    lane closures on the westbound side

37
Location Map
37
Project Location
38
Key Issues
38
  • Traffic peaks on the weekends. Average weekdays
    are significantly different from Friday through
    Sunday, and are not critical.
  • Estimation of capacity from similar work on
    westbound side.
  • Queuing and delay expected based on experience in
    westbound direction.

39
Traffic Volumes
39
Volumes Estimated from AADT TPG
Actual Sunday Volumes
Actual Friday Volumes
40
Hourly Traffic Volumes
40
41
Estimation of Capacity
41
  • EB and WB traffic was converted from vehicles
    to passenger car equivalents to account for
    differences in grade and truck .
  • Known WB queue was 2 miles in the Friday
    afternoon peak.
  • Actual WB PCE volumes were input in Bottleneck
    Spreadsheet.
  • Capacity adjusted until known queue length
    resulted.
  • Resulting capacity was 1300 PCE / hour
  • EB analysis was then conducted using PCE volumes
    instead of actual volumes

42
42
Spreadsheet / Analysis of Westbound Direction For
Determining Capacity
1300 PCE Capacity
2 mile backup
43
Eastbound Analysis SpreadsheetsFridaySaturdayS
unday
44
44
FRIDAY ANALYSIS
No delays or queues expected
PCE Volumes Input
1300 PCE Capacity
45
SATURDAY ANALYSIS
Again, no delays or queues expected
46
46
SUNDAY ANALYSIS
Major Delays and Queues Expected
47
Example Conclusions
  • No delays on days Monday through Thursday
  • Friday had delays in the westbound direction but
    not eastbound
  • Eastbound had significant delays on Sunday
  • For an interstate / intercity route summertime
    weekend traffic data are key

48
Example 3Oversaturated Ramp to a Freeway Work
ZoneVariable Capacity Problem
48
49
Overview of Example
49
  • An interchange lies within a freeway work zone
    that is oversaturated. The off-ramp is upstream
    of the on-ramp.
  • The interchange volumes are shown on next slide.
    The off-ramp volume will be the capacity for the
    on-ramp traffic flow.
  • Perform a variable capacity problem using the
    "Bottleneck Analysis" worksheet

50
Interchange Traffic Volumes
50
51
Bottleneck Spreadsheet Inputs
51
52
Delay Outputs
52
53
Example Conclusion
53
  • Significant delay on the on-ramp.
  • There are individual delays gt 50 min
  • Delays gt30 min sustained for more than two hours
  • The delay on the ramp could be greater than the
    delay on the mainline at the entrance to the work
    zone.
  • Variable capacity problem also applies to work
    zone time restrictions

54
Existing Bottleneck Analysis Spreadsheet
Squirrel Hill Tunnels, Pittsburgh
55
Overview
  • Modification of Bottleneck Analysis spreadsheet
  • Need hourly volume and capacities are available
  • Also need normal capacities, which are presumed
    to result in some existing over-capacity
    conditions
  • Outputs and overall methodology are the same as
    the Bottleneck Analysis spreadsheet except
    delay measures focus on added delay relative to
    existing delay

56
Area of Spreadsheet to Input Normal Capacity
57
I-70 Sunday Example Data with Arbitrary Normal
Capacity
Delays are slightly less than before since some
is attributed to existing bottleneck
Normal Capacity input here
58
Traffic Analysis QuestionsDiscussion
58
59
Lessons Learned
60
From Personal Experience
  • Differentiate between commuter traffic patterns
    and interstate / intercity patterns
  • Importance of representative traffic data
  • Capacity estimation from observation of similar
    projects

61
Group Discussion of Lessons Learned
  • Central Office
  • District
  • Consultant

62
Final Questions Wrap - Up