Lecture 2 Requirements Analysis of RealTime Systems - PowerPoint PPT Presentation

1 / 85
About This Presentation
Title:

Lecture 2 Requirements Analysis of RealTime Systems

Description:

The semantic framework and its notational schema together ... Terms used in Standard Document. CSCI Computer Software Configuration Item ... – PowerPoint PPT presentation

Number of Views:20
Avg rating:3.0/5.0
Slides: 86
Provided by: marinal1
Category:

less

Transcript and Presenter's Notes

Title: Lecture 2 Requirements Analysis of RealTime Systems


1
Lecture 2Requirements Analysis of Real-Time
Systems
2
The semantic framework and its notational schema
together comprise the modeling language, such as
the UML.
3
  • The development process is divided into
    large-scale
  • activities or phases
  • Analysis
  • Design
  • Translation
  • Testing
  • All phases work on a model of the system.
  • ROPES(Rapid Object Oriented Process of Embedded
    Systems)
  • is based on an iterative lifecycle that uses the
    standard UML.
  • We apply ROPES(see ROPES.pdf ) to our project.

4
  • Terms used in Standard Document
  • CSCI Computer Software Configuration Item
  • SSS Software Sub-Sections
  • CIDS Configuration Item Development Specification
  • PIDS Preliminary Item Development Specification

5
ROPES and our project
6
(No Transcript)
7
(No Transcript)
8
(No Transcript)
9
(No Transcript)
10
(No Transcript)
11
(No Transcript)
12
  • Course Assignments
  • The students will develop a small real-time
    system.
  • The development will be done in 3 phases
  • Software Requirements Review
  • (based on Software Requirements Specification)
    10
  • Critical Design Review
  • (based on Software Design Document) 10
  • 3. Project Implementation 20

13
Example Traffic Lights
14
Example Traffic Lights
15
Example Traffic Lights
16
UML Unified Modeling Language
17
UML Contents
18
(No Transcript)
19
(No Transcript)
20
(No Transcript)
21
(No Transcript)
22
(No Transcript)
23
(No Transcript)
24
(No Transcript)
25
(No Transcript)
26
(No Transcript)
27
(No Transcript)
28
(No Transcript)
29
(No Transcript)
30
(No Transcript)
31
(No Transcript)
32
(No Transcript)
33
(No Transcript)
34
(No Transcript)
35
(No Transcript)
36
Use Case Diagrams
37
(No Transcript)
38
(No Transcript)
39
(No Transcript)
40
(No Transcript)
41
(No Transcript)
42
(No Transcript)
43
(No Transcript)
44
(No Transcript)
45
(No Transcript)
46
(No Transcript)
47
(No Transcript)
48
(No Transcript)
49
(No Transcript)
50
(No Transcript)
51
(No Transcript)
52
(No Transcript)
53
(No Transcript)
54
(No Transcript)
55
(No Transcript)
56
(No Transcript)
57
(No Transcript)
58
(No Transcript)
59
Sequence Diagrams
60
(No Transcript)
61
(No Transcript)
62
(No Transcript)
63
(No Transcript)
64
(No Transcript)
65
(No Transcript)
66
(No Transcript)
67
(No Transcript)
68
(No Transcript)
69
(No Transcript)
70
(No Transcript)
71
(No Transcript)
72
(No Transcript)
73
Collaboration Diagram
74
(No Transcript)
75
(No Transcript)
76
(No Transcript)
77
(No Transcript)
78
(No Transcript)
79
(No Transcript)
80
(No Transcript)
81
(No Transcript)
82
integer.namereccurence
83
Status,OperationStartTime Print (blue, 10mm,
italics)
84
(No Transcript)
85
1.2printer freePrint(ps-file)
Write a Comment
User Comments (0)
About PowerShow.com