Coastal Management Division Online Permitting PowerPoint PPT Presentation

presentation player overlay
1 / 42
About This Presentation
Transcript and Presenter's Notes

Title: Coastal Management Division Online Permitting


1
Coastal Management DivisionOnline Permitting
2
www.dnr.louisiana.gov
3
(No Transcript)
4
(No Transcript)
5
(No Transcript)
6
(No Transcript)
7
(No Transcript)
8
(No Transcript)
9
(No Transcript)
10
(No Transcript)
11
(No Transcript)
12
(No Transcript)
13
System Generated User Accounts
  • If an email address is provided in step 1 or 2,
    and a user account that contains that email
    address does not exist, an account is created
    automatically using the email address provided
  • EX user ID christinec_at_dnr.state.la.us
  • password christinec_at_dnr.state.la.us1
  • An applicant that did not create a user account
    can use this log in information to view/modify
    applications filed by a third party

14
(No Transcript)
15
(No Transcript)
16
(No Transcript)
17
(No Transcript)
18
(No Transcript)
19
(No Transcript)
20
(No Transcript)
21
(No Transcript)
22
(No Transcript)
23
(No Transcript)
24
(No Transcript)
25
(No Transcript)
26
(No Transcript)
27
(No Transcript)
28
(No Transcript)
29
(No Transcript)
30
(No Transcript)
31
(No Transcript)
32
(No Transcript)
33
(No Transcript)
34
(No Transcript)
35
(No Transcript)
36
(No Transcript)
37
(No Transcript)
38
(No Transcript)
39
Necessary Information Application Form
  • Applicant/Agent information
  • Landowner/Adjacent Landowner names and mailing
    addresses (attach additional sheet(s) if
    necessary)
  • Lat/Long of Project (attach additional sheet(s)
    if more than one point)
  • Excavation/Fill Volumes and Types of Materials
    (native material, sand bags, etc.)
  • Equipment Used (marsh buggy, shallow draft
    vessels, pipe lay barge, etc.)

40
Necessary Information - Plats
  • POB, POE and all Points of Infection
  • Length and Diameter of Pipeline
  • Method of Installation (trench, push/pull on
    surface, directionally bore, etc.)
  • Depth of Installation
  • Pipeline Crossing and Tie-in Details (larger
    excavation area, bracing details and materials
    used, etc), Bore entry/exit location and size of
    required workspaces
  • Access Route, Water Depth, Vessel Draft

41
  • For questions and/or system problems, please
    contact
  • Christine Charrier
  • christine.charrier_at_la.gov
  • Ph (225) 342-7953
  • (800) 267-4019
  • Fax (225) 342-9439

42
1-225-342-7591
1-800-267-4019
www.dnr.louisiana.gov
Write a Comment
User Comments (0)
About PowerShow.com