M1 Status - PowerPoint PPT Presentation

About This Presentation
Title:

M1 Status

Description:

Cross-check calculations with measurements (weight) ... Ground Braids (v) 0.011. Al bars. Balconies. 0.034. Al 3 mm. Walls t /X0 (h) mostly horizontal ... – PowerPoint PPT presentation

Number of Views:21
Avg rating:3.0/5.0
Slides: 26
Provided by: giovanni83
Category:
Tags: braids | status

less

Transcript and Presenter's Notes

Title: M1 Status


1
M1 Status G. Carboni for the Muon Group
  • material budget
  • cable layout
  • status plans

2
Material budget what is in the MC
(T. Ruf)
chambers with the Faraday cages and electronics,
rest is uniform
3
Ingredients of X0 calculations
Try to be as accurate as possible by including
(hopefully) all importants elements Cross-check
calculations with measurements (weight) In the
final version local disuniformities will be
included to some reasonable level of
granularity Data used
cables
4
Average values Services
lttgt/X0
Walls Al 3 mm 0.034
Balconies Al bars 0.011
Ground Braids (v) Cu 50 mm2 0.007
Gas pipes (h) Cu ltLgt 2 m 0.019
HV/LVDS/ECS cables (v) ltLgt3m 0.028
LV Cables (h) ltLgt2m 0.009
Total 0.108
(h) mostly horizontal (v) mostly vertical
5
Average values chambers
FC 0.06
? GEM to be included for the detailed
description. Do not play a role in the average
6
Average values electronics cards
FC
0.06
Total electronics
0.0134
7
Summary
t/X0
Services 0.108
Chambers (incl. FC) 0.144
Electronics 0.013
Total 0.265
A modest increase w.r.t. the present MC
description
8
Cable layout
Original layout unsatisfactory because of large
disuniformities in material distribution
9
Old Layout M2-M5
Big X0 jumps
X
A-side
C-side
New layout proposed for M1 (Burkhard) to get a
more uniform arrangement of cable material for a
better EM Calo performance.
? But layout different from M2-M5
10
Cable layout
It was decided to stick to the old chamber layout
but to devise new more uniform cabling scheme
  • Emiliano Danè (last week meeting)
  • horizontal cables behind each chamber row
  • (max 40 cables/row)
  • remaining part arranged in vertical chimneys
  • (two front and two back)

11
Rows with only R4 chambers rows from 26 to 32
(rows 2-gt8 mirrored).
b
c
d
a
Sec. a
Sec. b
ECS
  • Used 3 clamps
  • 12 places each
  • 36 places in total
  • For these rows we have 18 cables 8
    pipes 26 places

LV
HV
LVDS
gas pipes
12
Rows 22 and 20. (12 and 14)
  • 68 cables in row 20.
  • So 14 cables of chamber 20A3 go to row 22.
  • See the Autocad file to better understand.

F
1st wires plane
Row 22
Row 20
a
B
C
D
E
G
2nd wires plane
Row 22
Row 20
13
Tray B chimney 126 cables
Tray A3 chimney 126 cables
External chimney 252 cables
Vertical routing
14
X0 budget due to cables
Average 0.039 ? 0.0370.0280.009 of estimate on
slide 4
15
gas pipes contributions in detail
16
Work in progress
  • Software (Alessia)
  • introduce the detailed description in the MC

17
Construction status
18
  • Since our last meeting (LHCb week)
  • the work on M1 beam started 3 weeks ago...
  • ...and it stopped due to late (and not
    announced) delivery of panels due to a broken
    machinery at the company
  • New delivery date July 20 (was June 22)
  • a lot of effort done on implementing a - as
    minimal and uniform as possible - distribution of
    cables inside the active area
  • and on top of this, a lot of engineering work by
    Alessandro
  • In the meantime production centers are dressing
    M1 chambers
  • GEMs here at CERN by the end of July
  • ½ M1R4 here at CERN by early September (then
    M1R3)
  • CERN M1R2 under preparation

19
Design Drawings
  • All the structural elements have been defined and
    drawn
  • Walls gtgtgt done
  • Carriages gtgtgt done
  • Handling System gtgtgt done
  • Cable Chains (order gtgtgt done)
  • We have to prepare the executive drawings of the
    Bottom Rail
  • We are working on the chambers fixation
    (Balconies)

20
Design structural elements
  • The walls will arrive the Cern at the end of July
    (20 th).
  • The carriages will arrive the Cern next week

21
Rearranged Schedule Still to define Manpower shif
ts
22
  • Effects of new schedule
  • start of LV/Gas cabling not earlier than Sept 15
  • start of HV/ECS/Signal cabling not earlier than
    Oct 15
  • start of chamber mounting not earlier than Nov
    15
  • probably some parallelism on cabling A/C side
    needed (otherwise too tight schedule)
  • cabling in the big chain still to be understood
    (and the interferences with the other operations)
  • The Muon group is willing to have a complete muon
    system by March 2008

23
SPARES
24
effects of the new M1 layout on TRIGGER
In the standard layout, all 5 chambers belonging
to a projective tower have the same ?Z w.r.t.
nominal position (so they have the same size).
With the new layout for M1only, we would have a
horizontal row as in the standard layout (Z 3 4
3 4 in M1 and in M2-M5) alternate to a row with a
sequence 1-2-1-2 in M2-M5 and 2-1-2-1 in M1
M3
M2
M1
3
  • Towers with Z1111 in M2-M5
  • see a smaller M1 chamber Z2

1
3
Y
3
IP
1
2
2
2
? Towers with Z2222 in M2-M5 see a larger M1
chamber Z1
1
1
25
TOP VIEW ROW 18 ACCESS SIDE
A2
A3
B
A1
IP
Write a Comment
User Comments (0)
About PowerShow.com