Title: M1 Status
1M1 Status G. Carboni for the Muon Group
- material budget
- cable layout
- status plans
2Material budget what is in the MC
(T. Ruf)
chambers with the Faraday cages and electronics,
rest is uniform
3Ingredients of X0 calculations
Try to be as accurate as possible by including
(hopefully) all importants elements Cross-check
calculations with measurements (weight) In the
final version local disuniformities will be
included to some reasonable level of
granularity Data used
cables
4Average values Services
lttgt/X0
Walls Al 3 mm 0.034
Balconies Al bars 0.011
Ground Braids (v) Cu 50 mm2 0.007
Gas pipes (h) Cu ltLgt 2 m 0.019
HV/LVDS/ECS cables (v) ltLgt3m 0.028
LV Cables (h) ltLgt2m 0.009
Total 0.108
(h) mostly horizontal (v) mostly vertical
5Average values chambers
FC 0.06
? GEM to be included for the detailed
description. Do not play a role in the average
6Average values electronics cards
FC
0.06
Total electronics
0.0134
7Summary
t/X0
Services 0.108
Chambers (incl. FC) 0.144
Electronics 0.013
Total 0.265
A modest increase w.r.t. the present MC
description
8Cable layout
Original layout unsatisfactory because of large
disuniformities in material distribution
9Old Layout M2-M5
Big X0 jumps
X
A-side
C-side
New layout proposed for M1 (Burkhard) to get a
more uniform arrangement of cable material for a
better EM Calo performance.
? But layout different from M2-M5
10Cable layout
It was decided to stick to the old chamber layout
but to devise new more uniform cabling scheme
- Emiliano Danè (last week meeting)
- horizontal cables behind each chamber row
- (max 40 cables/row)
- remaining part arranged in vertical chimneys
- (two front and two back)
11Rows with only R4 chambers rows from 26 to 32
(rows 2-gt8 mirrored).
b
c
d
a
Sec. a
Sec. b
ECS
- Used 3 clamps
- 12 places each
- 36 places in total
- For these rows we have 18 cables 8
pipes 26 places
LV
HV
LVDS
gas pipes
12Rows 22 and 20. (12 and 14)
- 68 cables in row 20.
- So 14 cables of chamber 20A3 go to row 22.
- See the Autocad file to better understand.
F
1st wires plane
Row 22
Row 20
a
B
C
D
E
G
2nd wires plane
Row 22
Row 20
13Tray B chimney 126 cables
Tray A3 chimney 126 cables
External chimney 252 cables
Vertical routing
14X0 budget due to cables
Average 0.039 ? 0.0370.0280.009 of estimate on
slide 4
15gas pipes contributions in detail
16Work in progress
- Software (Alessia)
- introduce the detailed description in the MC
17Construction status
18- Since our last meeting (LHCb week)
- the work on M1 beam started 3 weeks ago...
- ...and it stopped due to late (and not
announced) delivery of panels due to a broken
machinery at the company - New delivery date July 20 (was June 22)
- a lot of effort done on implementing a - as
minimal and uniform as possible - distribution of
cables inside the active area - and on top of this, a lot of engineering work by
Alessandro - In the meantime production centers are dressing
M1 chambers - GEMs here at CERN by the end of July
- ½ M1R4 here at CERN by early September (then
M1R3) - CERN M1R2 under preparation
19Design Drawings
- All the structural elements have been defined and
drawn - Walls gtgtgt done
- Carriages gtgtgt done
- Handling System gtgtgt done
- Cable Chains (order gtgtgt done)
- We have to prepare the executive drawings of the
Bottom Rail - We are working on the chambers fixation
(Balconies)
20Design structural elements
- The walls will arrive the Cern at the end of July
(20 th). - The carriages will arrive the Cern next week
21Rearranged Schedule Still to define Manpower shif
ts
22- Effects of new schedule
- start of LV/Gas cabling not earlier than Sept 15
- start of HV/ECS/Signal cabling not earlier than
Oct 15 - start of chamber mounting not earlier than Nov
15 - probably some parallelism on cabling A/C side
needed (otherwise too tight schedule) - cabling in the big chain still to be understood
(and the interferences with the other operations) - The Muon group is willing to have a complete muon
system by March 2008
23SPARES
24effects of the new M1 layout on TRIGGER
In the standard layout, all 5 chambers belonging
to a projective tower have the same ?Z w.r.t.
nominal position (so they have the same size).
With the new layout for M1only, we would have a
horizontal row as in the standard layout (Z 3 4
3 4 in M1 and in M2-M5) alternate to a row with a
sequence 1-2-1-2 in M2-M5 and 2-1-2-1 in M1
M3
M2
M1
3
- Towers with Z1111 in M2-M5
- see a smaller M1 chamber Z2
1
3
Y
3
IP
1
2
2
2
? Towers with Z2222 in M2-M5 see a larger M1
chamber Z1
1
1
25TOP VIEW ROW 18 ACCESS SIDE
A2
A3
B
A1
IP