Title: Wisconsin Height Modernization Program (WI-HMP)


1
Wisconsin Height Modernization Program (WI-HMP)
  • Improving the Vertical Component of the Geodetic
    Network
  • Montana Height Modernization Forum
  • 17 October 2006
  • Paul J. Hartzheim, P.E.

2
WI-HMP Early Development
  • Wisconsin Height Modernization Program (WI-HMP)
    was started by WisDOT in 1998 to improve the
    vertical component of Geodetic Control in
    Wisconsin
  • As part of the growing development of WI-HMP, a
    Wide Area Global Positioning System (GPS)
    Real-Time Kinematic Network is being established.

3
Height Modernization Objectives
  • Eliminate inconsistencies between horizontal and
    vertical control data and supplemental control
    where marks have been destroyed or are deemed
    unusable
  • Utilize GPS technology as a cost effective
    positioning tool (achieve 2-cm positional
    accuracy)
  • Decrease the cost of surveying required for
    transportation related projects
  • Provide a much more accurate vertical database to
    a wide variety of data users throughout the state
  • Complete initial efforts by 2011

4
WI-HMP RTK GPS Use and Benefits
  • Establish horizontal and vertical coordinates for
    design and construction surveys
  • 40 50 less time
  • Less time needed for error analysis between GPS
    and leveling derived elevations
  • All positions are easily re-established
  • Reduce the need for any conventional leveling
  • Instant coordinates

5
Example of WI-HMP BenefitState Agency
  • WisDOT compared a static GPS survey and
    conventional leveling (before WI-HMP) verses a
    RTK GPS survey (after WI-HMP) for the
    establishment of photogrammetric targets for a
    highway improvement project
  • Horizontal and Vertical (elevations) positions
    were all within 2 cm (.07)
  • Static GPS w/Leveling 280 staff hours
  • RTK GPS 30 staff hours
  • WI-HMP with RTK provided over a 91 time savings!

6
Example of WI-HMP BenefitCounty Agency
  • Digital Orthophotography field survey for
    accuracy check
  • A survey was needed by a County to verify 10
    horizontal and vertical positions derived from
    digital orthos in one 36 square mile township
  • It was estimated (from past projects) to take 24
    hours to perform these checks using conventional
    (static GPS, total station, and leveling)
    procedures before WI-HMP
  • With WI-HMP in place, RTK GPS procedures were
    utilized to perform these checks in just 4 hours
  • WI-HMP with RTK provided 61 time savings!

7
Funding and Management
  • Funding
  • State Transportation Funds
  • FHWA State Planning Research Funds
  • National Oceanic and Atmospheric Administration
    (NOAA) - Federal Congressional Earmark Funds
  • Management Structure
  • Geodetic Survey Supervisor
  • Four Geodetic Specialists (all Project positions)
  • Two Limited Term Employees
  • Up to 32 consultant staff personnel

8
Height Modernization Layout
HARN station Primary Base Network Secondary
Base Network Local Base Network
Existing NGS Level line Decimated NGS Level
line New WI-HMP Level line
9
WI-HMP Phases
10
Status of WI-HMP
  • Phases 1, 2, 3, and 4 Fully Completed (Project
    Data Available on NGS Web)
  • Phase 5 Nearly Completed (Monuments w/ Posts
    Installed Survey Complete GPS Data Available on
    NGS Web Awaiting Publication of Leveling Data by
    NGS)
  • Phase 6A Underway (Monuments w/Posts Installed
    Leveling Completed (Processing Underway) GPS
    Primary Survey of Field Observations Completed
    (Processing Underway) Secondary and Local GPS
    Survey of Field Observations Underway since
    August 2006 Scheduled Publication in 2007)
  • Phase 6B Survey Planned in 2007
  • Phase 7A Monuments w/Posts Installed
    Descriptions for Marks Completed Survey Planned
    in 2007

11
Status of WI-HMP
  • Phase 7B Monuments Installed Witness Posts
    Installation Underway since August 2006
  • Phase 7C Reconnaissance Completed
  • Phase 8 Reconnaissance of Existing Bench Marks
    Completed
  • Statewide Wisconsin Continuous Operating
    Reference Network (WI-CORS-NET) Compiling
    existing stand alone base stations developing
    planning maps for installation of CORS
    researching other established CORS networks
    completed pilot test project to determine spacing
    requirement of CORS and accuracies

12
WI-HMP Mark Maintenance
GPS Stations Orange 4x4 Plastic Guard Posts
_____
BROCKMAN
  • Installed 3 witness posts around each monument
  • Established 866 number to report endangered,
    damaged, or destroyed monuments
  • Created the Preservation of Geodetic Survey
    Stations Committee

Bench Marks White T Plastic Witness Posts
13
Benefits of Wide Area RTK Network
(Implementation of Technology Advancement to
Height Modernization)
  • Eliminates the need and cost for another GPS
    receiver which acts as a base
  • Eliminates the resource time associated with
    equipment setup at the base site
  • Greatly enhances consistency of coordinate
    determination
  • Eliminates the need for permanent monumentation
    on a local level
  • Reliability and redundancy is ensured

Hence, WIsconsin Continuously Operating Reference
Stations NETwork (WI-CORS-NET) is Being
Implemented
14
Concept of Wide Area RTK Network
  • Utilizes network RTK solutions to provide high
    accuracy GPS positioning over wide areas
  • At least four GPS reference stations are needed
  • Users connect into system using wireless
    connection
  • Software acknowledges the users field position
    and allows them to operate as though there is a
    reference station next to the rover
  • Software uses reference stations to calculate
    virtual reference station position for the rover

15
Development of Pilot Projectfor WI-CORS-NET
  • Goal is to determine spacing requirement of
    permanent GPS base stations while achieving 2-cm
    three-dimensional positioning accuracy standard
  • Pilot network consisted of two permanent sites
    (Franklin and Watertown) and two temporary sites
    (Germantown and Palmyra)
  • Equipment utilized on the project included a
    Trimble GNSS R8 receiver for the rover and
    Trimble NetR5 receivers for the bases
  • Pilot project performed with the cooperation and
    assistance from Seiler Instruments

16
WI-CORS-NET Pilot Project Configuration
17
Construction of Marshfield CORS(Concrete
Pedestal)
18
Construction of Marshfield CORS(Concrete
Pedestal)
19
Construction of Marshfield CORS(Concrete
Pedestal)
20
Construction of Marshfield CORS(Concrete
Pedestal)
21
Construction of Marshfield CORS(Concrete
Pedestal)
22
Palmyra CORS(Building Mount)
23
Palmyra CORS(Building Mount)
24
Coordinate Determination of Pilot CORS
  • Need to have temporary Pilot CORS on same datum
    and adjustment as WI-HMP, i.e., NAD 83 (1997.0)
  • GPS survey was performed to tie HARN and WI-HMP
    Primary Base Stations to temporary Pilot CORS
    sites
  • Variety of problems with coordinate determination
  • Using correct datum and adjustment is vital to
    accurate testing

25
WI-CORS-NET Pilot Project AreaWI-HMP Marks
26
Results of Pilot Project Testing
  • Utilized Trimble GNSS R8 receiver with Survey
    Controller
  • Majority of area tested utilized Verizon for
    communication link, remaining area used Singular
    as communication provider
  • 10 second observations collected at each mark
  • Results indicate 2 cm accuracy standard in
    horizontal and vertical (orthometric height)
    components are achievable on a reliable basis

27
Sample of Results
28
Development of WI-CORS-NET(Funding)
  • Received approval on extension and budget
    revision for FFY05 NOAA Earmark Grant
  • Approximately 600,000 would be allocated towards
    funding the establishment of nearly 25
    WI-CORS-NET sites
  • Grant expires on 31 May 2007

29
Development of WI-CORS-NET(Technical)
  • Initial plan is to establish 25 permanent CORS
    throughout the eastern half of Wisconsin
  • Permanent sites would have concrete pillar design
  • Plan is to incorporate existing single base
    station receivers through possible upgrade
    replacement
  • Reconnaissance already underway for location of
    monuments
  • GPS hardware and software would be acquired
    through bid process
  • Determination needs to be made on distribution of
    licenses
  • Determination needs to be made on the
    availability of communication services for
    transmitting data

30
WI-CORS-NETPhase 1 Preliminary Design
31
WI-CORS-NETPhase 1 Preliminary Design
32
WI-CORS-NETPhase 1 Preliminary Design
33
Development of WI-CORS-NET(Management)
  • Coordination and management on the development
    and implementation of WI-CORS-NET by WisDOT
  • Assistance being solicited from the stakeholders
    (our Regions, public entities, and consultants)
  • Master information list containing POCs, current
    CORS sites, etc. compiled and updated frequently
  • Development of WI-CORS-NET status report is
    on-going
  • Cooperative agreement finalized, to be
    distributed to Partners

34
Tentative Implementation Timeline
35
Questions/Comments?