MAGALIES WATER 20045 FINANCIAL AND CORPORATE PERFORMANCE - PowerPoint PPT Presentation

About This Presentation
Title:

MAGALIES WATER 20045 FINANCIAL AND CORPORATE PERFORMANCE

Description:

STANDS. MUNICIPAL DEMOGRAPHICS ... ISO 14001 Accreditation in 2005 ... MW does not provide ARV's nor is there a budget allocated for each beneficiary treatment. ... – PowerPoint PPT presentation

Number of Views:99
Avg rating:3.0/5.0
Slides: 55
Provided by: pmg8
Category:

less

Transcript and Presenter's Notes

Title: MAGALIES WATER 20045 FINANCIAL AND CORPORATE PERFORMANCE


1
MAGALIES WATER 2004/5 FINANCIAL AND CORPORATE
PERFORMANCE Presentation to Parliament 24 March
2006
2
TABLE OF CONTENTS
  • Introduction
  • Vision and Mission
  • Area of Supply and Operations
  • Current Activities and Projects
  • Major Achievements in 2004/5
  • Mechanisms to achieve and strengthen service
    delivery
  • Strategic Challenges faced by the Board and plans
    to overcome them

3
TABLE OF CONTENTS
  • Future Planning and the Strategic Plan of
    Magalies Water for 2005/6 and going forward
  • Implications of the Presidents 2005/6 State of
    the Nation address on Magalies Waters service
    delivery
  • Financial Performance

4
MAGALIES WATER VISION
The VISION of Magalies Water is to TO BE THE
LEADING PROVIDER OF QUALITY WATER SERVICES 35
Years of Existence
5
MAGALIES WATER MISSION STATEMENT
  • Magalies Water shall pursue and attain its vision
    by
  • Optimising operational resources and
    technologies
  • Influencing and contributing to healthy water
  • resources
  • Ensuring staff equity, competence and capability
  • Complying with relevant legislation, standards
    and guidelines
  • Building customer and community capacity and
  • relationships

6
AREA OF SUPPLY AND OPERATIONS
Magalies Water has been a provider of high
quality water for over 35 years and continues to
maintain this standard. This was achieved as a
result of well established relationships with our
Stakeholders as well as Benchmarking our services
with international standards and players.
7
AREA OF SUPPLY AND OPERATIONS
  • North West Province
  • Limpopo Province
  • Gauteng Province
  • 34 000 kmĀ² in three provinces

8
AREA OF SUPPLY
MAGALIES WATER AREA OF SUPPLY
Limpopo
NorthWest
Gauteng
9
MAGALIES WATER BULK SUPPLY
10
MUNICIPAL DEMOGRAPHICS
TABLE 1
11
TOTAL NUMBER OF CONSUMERS FOR THE 5 LARGEST
MUNICIPALITIES
TABLE 2
12
KEY SERVICE AGREEMENTS
  • MUNICIPALITIES
  • Thabazimbi Local Municipality
  • Modimolle Local Municipality
  • Bela-Bela Local Municipality
  • Rustenburg Local Municipality
  • Nokeng Tsa Taemane Local Municipality
  • Moses Kotane Local Municipality
  • Madibeng Local Municipality
  • Moretele Local Municipality
  • City of Tshwane Metro - Temba and Hammanskraal
    areas (Bulk and Retail Services)
  • OTHER CONSUMERS
  • Amandelbult Platinum Mine
  • Swartklip Platinum Mine
  • Rhino Andalusite Mine
  • Bafokeng Rasimone Platinum Mine
  • Premier Mine
  • Royal Bafokeng Administration
  • Northam Platinum Mine

13
KEY SERVICE AGREEMENTS .
  • Rand Water
  • Sun City Hotel
  • Carousel Hotel
  • Pretoria Portland Cement (PPC)
  • Zonderwater Correctional Services
  • Baviaanspoort Correctional Service
  • Agricultural Research Institute
  • Hydrological Research Institute

14
OPERATIONAL PERFORMANCE AND ACTIVITIES/PROJECTS
15
ACTIVITIES/PROJECTS
  • Magalies Water subscribes to the views of DWAF
    that water is a scarce commodity in South Africa
    and that the construction of expensive new
    schemes can be eliminated or at least be
    postponed through the implementation of water
    conservation and demand management measures.
    Water conservation and demand management measures
    implemented by Magalies Water include the
    following
  • Setting of maximum allocations for higher classes
    of consumers.
  • Communicating with consumers to make them aware
    of the need to restrict water consumption.
  • Actively monitoring and controlling water-network
    losses and UFW.

16
ACTIVITIES/PROJECTS (Cont)
  • During the year under review, Magalies Water has
    contained water tariff increases between 0 -
    6.8 within previously set targets without
    compromising the financial sustainability of the
    organisation.
  • Despite challenges faced due to external factors
    such as deteriorating raw water quality and
    drought, operational costs are being contained
    and attempts are made to manage increases in the
    future.
  • Time frames on an annual basis are currently
    established in order to assess the
    implementation of the strategies as well as
    evaluate progress on the set goals.

17
ACTIVITIES/PROJECTS (cont..)
  • The Magalies Water Board has established a
    Central Laboratory Facility with a view to
    provide quality monitoring of potable water to
    all municipalities in its service area. It also
    has the capability for the monitoring of
    sanitation plants
  • The Board has entered into partnerships with a
    number of municipalities for the operation of
    bulk potable water and sewage plants.
  • The abovementioned efforts are viewed against the
    background of the Constitutional obligation of
    WSAs to provide water services requirements of
    the MFMA.
  • Table 3 Below Outlines current Sanitation
    Projects

18
TABLE 3
SANITATION PROJECTS 2005-2010
Approximately 400 000 consumers are currently
served through the Sanitation System
19
COMMUNITY WATER SUPPLY SANITATION PROGRAMME
PROJECTS
  • Magalies Water has assisted Municipalities with
    the implementation of its refurbishment projects
    transfer of assets. Project at Danhouse,
    Sespond and One-and-Ten villages in Moretele was
    successfully implemented during March 2005.
  • Other projects include the following
  • A number of projects were implemented in 2005
    co-operation with both Local- District
    Municipalities. Subject to funding, these
    projects will be carried forward to subsequent
    years
  • Basic sanitation Ratjiepane, Moretele R2.0 mil
  • Basic sanitation Mabeskraal Moses Kotane R3.5
    mil
  • Basic sanitation Boitekong Rustenburg R1.5 mil
  • Basic Water Disteneng Moretele R1.26 mil
  • Basic Water Cyferskuil Moretele R0.3 mil
  • Basic Water Tweelaagte Moses Kotane R1.4 mil
  • Basic water Bapong Moses Kotane R1.2 mil
  • Source Augmentation Derby Kgetleng River R2.02
    mil
  • Installation of connections Jericho
    Madibeng R1.6 mil

TOTAL R14.78 Mill
20
COMMUNITY UPLIFTMENT PROJECTS
2005/6
TOTAL R39.8 mill
21
INFRASTRUCTURE
  • Excess of 1 500 km pipelines (including
    reticulation)
  • 40 reservoirs with a total storage capacity in
    excess of 250Ml
  • Capital Infrastructure investment of /- R800
    million over the past 5 years
  • Capital Infrastructure expenditure approved in
    2004/5 R69 million
  • R149, 5 Mill to be spent over the next 5 years on
    pipeline and Infrastructure maintenance

22
MAJOR ACHIEVEMENTS IN 2004/5
23
MAJOR ACHIEVEMENTS IN 2004/5
  • Implementation of Future Corporate Strategy that
    focused on (a) Appointment of New BEE Suppliers
    and Professional Service Providers
  • (b) Management Transformation - 50 of
    Executives are Currently HDI
  • Implementation of New Organisational Structure
  • ISO 14001 Accreditation in 2005
  • Balance Sheet improvement (Long term loan
    reduction of R107 mill)
  • Asset Management Improvement Plan (AMIP)
  • PMR Diamond Award (For Public Sector Entity
    Service Delivery) - 2005
  • Twinning Agreement with Nkana Water in Zambia

24
MAJOR ACHIEVEMENTS IN 2004/5
  • Successful participation in the R550 million
    RTWST project in 2005
  • Successful participation in the R250 million RWST
    project in 2005
  • Successful attainment of gender balance in
    Magalies Water
  • Unqualified financial report by Independent
    Auditor (Never qualified by the Auditor in 35
    years)
  • Successful Involvement in the Water Loss Program
    in City of Tshwane Metro

25
MAJOR ACHIEVEMENTS IN 2004/5
  • Implementation of balanced tariff increases
    ranging between 0 - 6.8
  • Signed MoU with Rand Water and Ikangala Water to
    service the WH Region of Bronkhorstspruit
  • Successfully established a Central Laboratory
    Facility thru purchasing the Rustenburg LM Lab
    for /- R1mill
  • As implementing agent, successfully implemented
    DWAF projects to the value of R15 mill

26
MAJOR ACHIEVEMENTS IN 2004/5
  • Appointment as implementing agent for
    municipalities in establishing basic water
    services
  • Successful disbursement of the donation of R18
    million which was made available to 4 Key
    Municipalities for Water Services Projects
    directed to Water Services Projects
  • Gold Award under Public Sector at Rustenburg Show
    and Exhibition

27
MECHANISMS TO STRENGTHEN SERVICE DELIVERY
28
MECHANISMS TO STRENGTHEN SERVICE DELIVERY
  • Partnering with other Water Boards or Water
    Utilities on Joint Ventures to identify the most
    effective Sanitation Models and Processes. This
    means Joint Task Teams would be established to
    conduct research and publish information
    regularly on findings.
  • Progressive cost reduction in operational
    expenses and settlement of long term debt, and
    passing benefits of economies to consumers
  • Vigorously pursuing relationships with WSAs and
    fostering appointment as implementing agent in
    establishing basic water services inclusive of
    basic sanitation services

29
MECHANISMS TO STRENGTHEN SERVICE DELIVERY
  • Assisting WSAs in Project Consolidate
    initiatives through partnerships and secondment
    of selected personnel
  • Utilisation of Water Forums and Other Stakeholder
    Relationship Management initiatives to address
    their concerns
  • Acceleration of transformation and Equity /
    gender balance internally thereby boosting morale
    among staff
  • Deliberate encouragement and prodding of staff to
    further their education and learning successful
    implementation of ABET (Out of 71 registered
    candidates, 47 were successful in various Levels
    of ABET Qualifications)
  • Increased Spend in Training and Development

30
STRATEGIC CHALLENGES FACED BY MAGALIES WATER AND
PLANS TO OVERCOME THEM
31
STRATEGIC CHALLENGES FACED BY MW
  • Obtaining Support from DWAF regarding the above
    average / Inflation raw water tariff increases
    whilst the Water Board is expected to increase
    tariffs in line with Inflation targets
  • Need for the improvement of the fast
    deteriorating raw water quality in such
    catchments areas as the Hartebeestpoort and
    Roodeplaat dams
  • Finalisation of the WSA/WSP Service Level
    Agreements
  • Reduction of UFW in areas of operation
  • Managing the uncertainty created by the
    Institutional Reform process

32
STRATEGIC CHALLENGES FACED BY MW
  • Accelerating assistance offered to Municipalities
    to deal with Project Consolidate challenges
  • The Need to align and meet the challenges posed
    by the President in his 2006 State of the Nation
    address regarding water
  • Continuously ensuring that the quality of potable
    water produced and delivered remain quality
    consistent
  • Successfully managing the impact of HIV/AIDS at
    Magalies Water (Negotiating with ABSA for an
    Employee Support Program to assist MW in managing
    Voluntary disclosure)
  • Accelerating access of Sanitation to all
    consumers in MW areas of operation

33
STRATEGIC CHALLENGES FACED BY MW
  • Accelerating Transformation efforts to balance
    gender at all levels of management, as well as
    Disability
  • Maintaining and Improving employee and Customer
    satisfaction
  • Ensuring that the Business Development Division
    becomes fully functional and focused
  • Reduction of Operational Expenses
  • Maintaining tariff increases at inflation
    targeted levels

34
DEALING WITH STRATEGIC CHALLENGES
  • Efforts and Discussions already pursued with DWAF
    to limit future tariff increases to Inflation
    levels a study already completed and submitted
    to DWAF to highlight this anomaly
  • Raw Water Deterioration A study has been
    initiated and discussions currently pursued with
    DWAF to assist in the management of the Raw water
    relevant catchments
  • Finalisation of WSA/WSP Agreements Draft
    Agreements have already been compiled and
    submitted to all affected WSAs to finalise the
    contracts
  • UFW / Water Loss Management - Further projects
    such as the STIP Project in CTMM need to be
    initiated. Already other projects in Moses
    Kotane are being implemented

35
DEALING WITH STRATEGIC CHALLENGES
  • Institutional Reforms continuous communication
    and information dissemination is currently
    performed and staff are regularly updated
  • Project Consolidate (PC) Assistance Target
    teams and proposal development as well as
    laboratory services, among others are being
    undertaken to assist WSAs in their efforts to
    deal with PC challenges
  • Quality Standards - The establishment of a
    Centralised Laboratory facility was primarily
    aimed at accelerating the testing of raw, potable
    and sewage water to ensure quality products
  • Sanitation access - MW as an Implementing agent
    is already engaged with DWAF and affected WSAs
    to accelerate basic and advanced sanitation
    provisioning to affected communities

36
DEALING WITH STRATEGIC CHALLENGES
  • Customer Satisfaction Surveys (both independent
    and MW driven) have been identified as the key to
    determination of customer satisfaction the 2005
    PMR Award for Service excellence is just but one
    driver
  • Employee Satisfaction a Performance Management
    System has been introduced to reward key
    performers and to develop inadequate performers
    (Board members also trained)
  • The Training and Development spend has also been
    systematically increase to encourage personal
    development of staff
  • Reduction of Operational Expenses Service
    providers and suppliers to MW are being
    systemically informed that MW would not accept
    increases above inflation This is assisting
    tremendously in efforts to reduce OPEX

37
DEALING WITH STRATEGIC CHALLENGES
  • Reduction in OPEX consolidation of business
    processes has been undertaken through the
    restructuring of the Organisational Structure in
    order to further reduce OPEX.
  • HIV/AIDS Management Voluntary campaigns have
    been undertaken to date, including participation
    in national campaigns such as HIV/AIDS Week,
    World Aids day, etc
  • MW does not provide ARVs nor is there a budget
    allocated for each beneficiary treatment. Plans
    are being made to establish a mobile clinic

38
FUTURE PLANNING FOR 2005/6 AND GOING FORWARD
39
FUTURE PLANNING FOR 2005/6 AND GOING FORWARD
  • Consolidating the new Organisational Structure
    and milking the benefits of consolidation to
    pass these to our consumers
  • Capacitating the Business Development Division so
    that it identifies viable projects and becomes
    profitable
  • Strengthening Magalies Water Capabilities in the
    Bulk Sanitation business
  • Preparing Strategic Plans for bulk supply in
    support of the municipalities WSDPs especially
    in cases where the WSDPs have not been
    completed
  • Participating in the process of establishing
    WSDPs of municipalities

40
FUTURE PLANNING FOR 2005/6 AND GOING FORWARD
  • Preparing Business Plans for extension of water
    services reticulation within villages
  • Establishing community liaison committees in
    order to create relationships and to compile
    information on the most needy communities.
  • Aggressively pursuing the establishment of bulk
    water supply and OM contracts with
    municipalities
  • Pro-actively investigating the establishment of
    operating rules for raw water sources

41
FUTURE PLANNING FOR 2005/6 AND GOING FORWARD
  • Maintaining Water Forums with Municipalities and
    all Stakeholders in an effort to support them in
    their role as WSAs
  • Transfer of knowledge to Municipal Officials in
    an effort to equip them for their task as WSAs
    and to assist with Project Consolidate
  • Allocating Funding in order to conduct research
    on Water Conservation, Sanitation, establishment
    of Infra-structure to forward plan.
  • Establishing Organisation wide EWRM Models and
    Risk Scenarios in order to manage uncertainty

42
BEE PROCUREMENT
43
BEE PROCUREMENT
  • The BEE spend between 2003 2005 is as follows

44
IMPLICATIONS OF STATE OF NATION ADDRESS ON MW
SERVICE DELIVERY
45
IMPLICATIONS OF STATE OF NATION ADDRESS
  • Through our Implementing Agency status for the
    WSAs, MW facilitates the eradication and
    acceleration of access to Sanitation to meet the
    2007 ASGISA goals
  • Transfer of skills to Local Government via the
    Rustenburg Infrastructure Management Project to
    accelerate Project Consolidate deliverables
  • Working with Provincial Government in attaining
    the goals of the Provincial Growth Development
    Strategy (PGDS) Member of Infrastructure and
    Construction Working Group
  • Together with WSAs, MW will put additional
    Infrastructure Development plans forward to
    access part of the R372billion

46
IMPLICATIONS OF STATE OF NATION ADDRESS
  • MW has already invested more than R800 million
    for Infrastructure refurbishments in the last
    5yrs, with plans for a further R150million in the
    next 5yrs
  • Several proposals are at different stages of
    completion to assist WSAs in OM programs as
    part of infrastructure projects management
  • MW Board already consist of 50 women at Board
    level in line with the ASGISA goals of placing
    women at decision making levels of public service
  • Learnerships are being accelerated to advance
    youth training and development

47
IMPLICATIONS OF STATE OF NATION ADDRESS
  • Raising capital through the Boards balance sheet
    for infrastructure development on behalf of
    Stakeholders
  • MWs BEE and SMME development initiatives have
    ensured that in 2004 procurement from these
    entities was already at 44.1 (R51 million), of
    total procurement
  • Adoption of community agencies and centers by MW
    ensures that community development is accelerated
  • All Infrastructure programs, Basic water
    provision, sanitation, etc are all channelled at
    alignment with NEPAD goals

48
FINANCIAL PERFORMANCE
49
SUMMARY BUSINESS PERFORMANCE INDICATORS
50
BUSINESS PERFORMANCE INDICATORS
51
FINANCIAL PERFORMANCE
52
FINANCIAL OVERVIEW
Consolidated Balance Sheet - Magalies Water
R255,8 million currently in the Investment Account
53
FINANCIAL OVERVIEW
Consolidated Income Statement - Magalies Water
54
FINANCIAL OVERVIEW
Magalies Water Bulk Income Statement (Vaalkop,
Wallmannsthal, Klipdrift Cullinan)
55
FINANCIAL OVERVIEW
Magalies Water - Retail (CTMM) Income Statement
56
FINANCIAL OVERVIEW
Magalies Water - Retail (Bojanala) Income
Statement
57
FINANCIAL OVERVIEW
Magalies Water Roodeplaat Temba Water Services
Trust Income Statement
58
FINANCIAL OVERVIEW
Magalies Water Rustenburg Water Services Trust
Income Statement
59
APPROPRIATIONS
60
APPROPRIATIONS
61
LOAN STRUCTURE
Magalies Water Loan Stock Outstanding
62
LOAN STRUCTURE
Magalies Water Long Term Commitments Outstanding
In the year under review, MW has settled the long
term debt of R107 Mill
63
AUDIT OPINION
  • Unqualified Audit Opinion by the Auditor General,
    Treasury and External Auditors of Magalies Water
    for 35 years now!!!!

64
THANK YOU
Write a Comment
User Comments (0)
About PowerShow.com