Title: MAGALIES WATER 20045 FINANCIAL AND CORPORATE PERFORMANCE
1MAGALIES WATER 2004/5 FINANCIAL AND CORPORATE
PERFORMANCE Presentation to Parliament 24 March
2006
2TABLE OF CONTENTS
- Introduction
- Vision and Mission
- Area of Supply and Operations
- Current Activities and Projects
- Major Achievements in 2004/5
- Mechanisms to achieve and strengthen service
delivery - Strategic Challenges faced by the Board and plans
to overcome them
3TABLE OF CONTENTS
- Future Planning and the Strategic Plan of
Magalies Water for 2005/6 and going forward - Implications of the Presidents 2005/6 State of
the Nation address on Magalies Waters service
delivery - Financial Performance
4MAGALIES WATER VISION
The VISION of Magalies Water is to TO BE THE
LEADING PROVIDER OF QUALITY WATER SERVICES 35
Years of Existence
5MAGALIES WATER MISSION STATEMENT
- Magalies Water shall pursue and attain its vision
by -
- Optimising operational resources and
technologies - Influencing and contributing to healthy water
- resources
- Ensuring staff equity, competence and capability
- Complying with relevant legislation, standards
and guidelines - Building customer and community capacity and
- relationships
6AREA OF SUPPLY AND OPERATIONS
Magalies Water has been a provider of high
quality water for over 35 years and continues to
maintain this standard. This was achieved as a
result of well established relationships with our
Stakeholders as well as Benchmarking our services
with international standards and players.
7AREA OF SUPPLY AND OPERATIONS
- North West Province
- Limpopo Province
- Gauteng Province
- 34 000 kmĀ² in three provinces
8AREA OF SUPPLY
MAGALIES WATER AREA OF SUPPLY
Limpopo
NorthWest
Gauteng
9MAGALIES WATER BULK SUPPLY
10MUNICIPAL DEMOGRAPHICS
TABLE 1
11TOTAL NUMBER OF CONSUMERS FOR THE 5 LARGEST
MUNICIPALITIES
TABLE 2
12KEY SERVICE AGREEMENTS
- MUNICIPALITIES
- Thabazimbi Local Municipality
- Modimolle Local Municipality
- Bela-Bela Local Municipality
- Rustenburg Local Municipality
- Nokeng Tsa Taemane Local Municipality
- Moses Kotane Local Municipality
- Madibeng Local Municipality
- Moretele Local Municipality
- City of Tshwane Metro - Temba and Hammanskraal
areas (Bulk and Retail Services) - OTHER CONSUMERS
- Amandelbult Platinum Mine
- Swartklip Platinum Mine
- Rhino Andalusite Mine
- Bafokeng Rasimone Platinum Mine
- Premier Mine
- Royal Bafokeng Administration
- Northam Platinum Mine
13KEY SERVICE AGREEMENTS .
- Rand Water
- Sun City Hotel
- Carousel Hotel
- Pretoria Portland Cement (PPC)
- Zonderwater Correctional Services
- Baviaanspoort Correctional Service
- Agricultural Research Institute
- Hydrological Research Institute
14OPERATIONAL PERFORMANCE AND ACTIVITIES/PROJECTS
15ACTIVITIES/PROJECTS
-
- Magalies Water subscribes to the views of DWAF
that water is a scarce commodity in South Africa
and that the construction of expensive new
schemes can be eliminated or at least be
postponed through the implementation of water
conservation and demand management measures.
Water conservation and demand management measures
implemented by Magalies Water include the
following - Setting of maximum allocations for higher classes
of consumers. - Communicating with consumers to make them aware
of the need to restrict water consumption. - Actively monitoring and controlling water-network
losses and UFW.
16ACTIVITIES/PROJECTS (Cont)
- During the year under review, Magalies Water has
contained water tariff increases between 0 -
6.8 within previously set targets without
compromising the financial sustainability of the
organisation. - Despite challenges faced due to external factors
such as deteriorating raw water quality and
drought, operational costs are being contained
and attempts are made to manage increases in the
future. - Time frames on an annual basis are currently
established in order to assess the
implementation of the strategies as well as
evaluate progress on the set goals. -
17ACTIVITIES/PROJECTS (cont..)
- The Magalies Water Board has established a
Central Laboratory Facility with a view to
provide quality monitoring of potable water to
all municipalities in its service area. It also
has the capability for the monitoring of
sanitation plants - The Board has entered into partnerships with a
number of municipalities for the operation of
bulk potable water and sewage plants. - The abovementioned efforts are viewed against the
background of the Constitutional obligation of
WSAs to provide water services requirements of
the MFMA. - Table 3 Below Outlines current Sanitation
Projects
18TABLE 3
SANITATION PROJECTS 2005-2010
Approximately 400 000 consumers are currently
served through the Sanitation System
19COMMUNITY WATER SUPPLY SANITATION PROGRAMME
PROJECTS
- Magalies Water has assisted Municipalities with
the implementation of its refurbishment projects
transfer of assets. Project at Danhouse,
Sespond and One-and-Ten villages in Moretele was
successfully implemented during March 2005. - Other projects include the following
- A number of projects were implemented in 2005
co-operation with both Local- District
Municipalities. Subject to funding, these
projects will be carried forward to subsequent
years - Basic sanitation Ratjiepane, Moretele R2.0 mil
- Basic sanitation Mabeskraal Moses Kotane R3.5
mil - Basic sanitation Boitekong Rustenburg R1.5 mil
- Basic Water Disteneng Moretele R1.26 mil
- Basic Water Cyferskuil Moretele R0.3 mil
- Basic Water Tweelaagte Moses Kotane R1.4 mil
- Basic water Bapong Moses Kotane R1.2 mil
- Source Augmentation Derby Kgetleng River R2.02
mil - Installation of connections Jericho
Madibeng R1.6 mil
TOTAL R14.78 Mill
20COMMUNITY UPLIFTMENT PROJECTS
2005/6
TOTAL R39.8 mill
21INFRASTRUCTURE
- Excess of 1 500 km pipelines (including
reticulation) - 40 reservoirs with a total storage capacity in
excess of 250Ml - Capital Infrastructure investment of /- R800
million over the past 5 years - Capital Infrastructure expenditure approved in
2004/5 R69 million - R149, 5 Mill to be spent over the next 5 years on
pipeline and Infrastructure maintenance
22MAJOR ACHIEVEMENTS IN 2004/5
23MAJOR ACHIEVEMENTS IN 2004/5
- Implementation of Future Corporate Strategy that
focused on (a) Appointment of New BEE Suppliers
and Professional Service Providers - (b) Management Transformation - 50 of
Executives are Currently HDI - Implementation of New Organisational Structure
- ISO 14001 Accreditation in 2005
- Balance Sheet improvement (Long term loan
reduction of R107 mill) - Asset Management Improvement Plan (AMIP)
- PMR Diamond Award (For Public Sector Entity
Service Delivery) - 2005 - Twinning Agreement with Nkana Water in Zambia
24MAJOR ACHIEVEMENTS IN 2004/5
- Successful participation in the R550 million
RTWST project in 2005 - Successful participation in the R250 million RWST
project in 2005 - Successful attainment of gender balance in
Magalies Water - Unqualified financial report by Independent
Auditor (Never qualified by the Auditor in 35
years) - Successful Involvement in the Water Loss Program
in City of Tshwane Metro
25MAJOR ACHIEVEMENTS IN 2004/5
- Implementation of balanced tariff increases
ranging between 0 - 6.8 - Signed MoU with Rand Water and Ikangala Water to
service the WH Region of Bronkhorstspruit - Successfully established a Central Laboratory
Facility thru purchasing the Rustenburg LM Lab
for /- R1mill - As implementing agent, successfully implemented
DWAF projects to the value of R15 mill
26MAJOR ACHIEVEMENTS IN 2004/5
- Appointment as implementing agent for
municipalities in establishing basic water
services - Successful disbursement of the donation of R18
million which was made available to 4 Key
Municipalities for Water Services Projects
directed to Water Services Projects - Gold Award under Public Sector at Rustenburg Show
and Exhibition
27MECHANISMS TO STRENGTHEN SERVICE DELIVERY
28MECHANISMS TO STRENGTHEN SERVICE DELIVERY
- Partnering with other Water Boards or Water
Utilities on Joint Ventures to identify the most
effective Sanitation Models and Processes. This
means Joint Task Teams would be established to
conduct research and publish information
regularly on findings. - Progressive cost reduction in operational
expenses and settlement of long term debt, and
passing benefits of economies to consumers - Vigorously pursuing relationships with WSAs and
fostering appointment as implementing agent in
establishing basic water services inclusive of
basic sanitation services
29MECHANISMS TO STRENGTHEN SERVICE DELIVERY
- Assisting WSAs in Project Consolidate
initiatives through partnerships and secondment
of selected personnel - Utilisation of Water Forums and Other Stakeholder
Relationship Management initiatives to address
their concerns - Acceleration of transformation and Equity /
gender balance internally thereby boosting morale
among staff - Deliberate encouragement and prodding of staff to
further their education and learning successful
implementation of ABET (Out of 71 registered
candidates, 47 were successful in various Levels
of ABET Qualifications) - Increased Spend in Training and Development
30STRATEGIC CHALLENGES FACED BY MAGALIES WATER AND
PLANS TO OVERCOME THEM
31STRATEGIC CHALLENGES FACED BY MW
- Obtaining Support from DWAF regarding the above
average / Inflation raw water tariff increases
whilst the Water Board is expected to increase
tariffs in line with Inflation targets - Need for the improvement of the fast
deteriorating raw water quality in such
catchments areas as the Hartebeestpoort and
Roodeplaat dams - Finalisation of the WSA/WSP Service Level
Agreements - Reduction of UFW in areas of operation
- Managing the uncertainty created by the
Institutional Reform process
32STRATEGIC CHALLENGES FACED BY MW
- Accelerating assistance offered to Municipalities
to deal with Project Consolidate challenges - The Need to align and meet the challenges posed
by the President in his 2006 State of the Nation
address regarding water - Continuously ensuring that the quality of potable
water produced and delivered remain quality
consistent - Successfully managing the impact of HIV/AIDS at
Magalies Water (Negotiating with ABSA for an
Employee Support Program to assist MW in managing
Voluntary disclosure) - Accelerating access of Sanitation to all
consumers in MW areas of operation
33STRATEGIC CHALLENGES FACED BY MW
- Accelerating Transformation efforts to balance
gender at all levels of management, as well as
Disability - Maintaining and Improving employee and Customer
satisfaction - Ensuring that the Business Development Division
becomes fully functional and focused - Reduction of Operational Expenses
- Maintaining tariff increases at inflation
targeted levels
34DEALING WITH STRATEGIC CHALLENGES
- Efforts and Discussions already pursued with DWAF
to limit future tariff increases to Inflation
levels a study already completed and submitted
to DWAF to highlight this anomaly - Raw Water Deterioration A study has been
initiated and discussions currently pursued with
DWAF to assist in the management of the Raw water
relevant catchments - Finalisation of WSA/WSP Agreements Draft
Agreements have already been compiled and
submitted to all affected WSAs to finalise the
contracts - UFW / Water Loss Management - Further projects
such as the STIP Project in CTMM need to be
initiated. Already other projects in Moses
Kotane are being implemented
35DEALING WITH STRATEGIC CHALLENGES
- Institutional Reforms continuous communication
and information dissemination is currently
performed and staff are regularly updated - Project Consolidate (PC) Assistance Target
teams and proposal development as well as
laboratory services, among others are being
undertaken to assist WSAs in their efforts to
deal with PC challenges - Quality Standards - The establishment of a
Centralised Laboratory facility was primarily
aimed at accelerating the testing of raw, potable
and sewage water to ensure quality products - Sanitation access - MW as an Implementing agent
is already engaged with DWAF and affected WSAs
to accelerate basic and advanced sanitation
provisioning to affected communities
36DEALING WITH STRATEGIC CHALLENGES
- Customer Satisfaction Surveys (both independent
and MW driven) have been identified as the key to
determination of customer satisfaction the 2005
PMR Award for Service excellence is just but one
driver - Employee Satisfaction a Performance Management
System has been introduced to reward key
performers and to develop inadequate performers
(Board members also trained) - The Training and Development spend has also been
systematically increase to encourage personal
development of staff - Reduction of Operational Expenses Service
providers and suppliers to MW are being
systemically informed that MW would not accept
increases above inflation This is assisting
tremendously in efforts to reduce OPEX
37DEALING WITH STRATEGIC CHALLENGES
- Reduction in OPEX consolidation of business
processes has been undertaken through the
restructuring of the Organisational Structure in
order to further reduce OPEX. - HIV/AIDS Management Voluntary campaigns have
been undertaken to date, including participation
in national campaigns such as HIV/AIDS Week,
World Aids day, etc - MW does not provide ARVs nor is there a budget
allocated for each beneficiary treatment. Plans
are being made to establish a mobile clinic
38FUTURE PLANNING FOR 2005/6 AND GOING FORWARD
39FUTURE PLANNING FOR 2005/6 AND GOING FORWARD
- Consolidating the new Organisational Structure
and milking the benefits of consolidation to
pass these to our consumers - Capacitating the Business Development Division so
that it identifies viable projects and becomes
profitable - Strengthening Magalies Water Capabilities in the
Bulk Sanitation business - Preparing Strategic Plans for bulk supply in
support of the municipalities WSDPs especially
in cases where the WSDPs have not been
completed - Participating in the process of establishing
WSDPs of municipalities
40FUTURE PLANNING FOR 2005/6 AND GOING FORWARD
- Preparing Business Plans for extension of water
services reticulation within villages - Establishing community liaison committees in
order to create relationships and to compile
information on the most needy communities. - Aggressively pursuing the establishment of bulk
water supply and OM contracts with
municipalities - Pro-actively investigating the establishment of
operating rules for raw water sources
41FUTURE PLANNING FOR 2005/6 AND GOING FORWARD
- Maintaining Water Forums with Municipalities and
all Stakeholders in an effort to support them in
their role as WSAs - Transfer of knowledge to Municipal Officials in
an effort to equip them for their task as WSAs
and to assist with Project Consolidate - Allocating Funding in order to conduct research
on Water Conservation, Sanitation, establishment
of Infra-structure to forward plan. - Establishing Organisation wide EWRM Models and
Risk Scenarios in order to manage uncertainty
42BEE PROCUREMENT
43BEE PROCUREMENT
- The BEE spend between 2003 2005 is as follows
44IMPLICATIONS OF STATE OF NATION ADDRESS ON MW
SERVICE DELIVERY
45IMPLICATIONS OF STATE OF NATION ADDRESS
- Through our Implementing Agency status for the
WSAs, MW facilitates the eradication and
acceleration of access to Sanitation to meet the
2007 ASGISA goals - Transfer of skills to Local Government via the
Rustenburg Infrastructure Management Project to
accelerate Project Consolidate deliverables - Working with Provincial Government in attaining
the goals of the Provincial Growth Development
Strategy (PGDS) Member of Infrastructure and
Construction Working Group - Together with WSAs, MW will put additional
Infrastructure Development plans forward to
access part of the R372billion
46IMPLICATIONS OF STATE OF NATION ADDRESS
- MW has already invested more than R800 million
for Infrastructure refurbishments in the last
5yrs, with plans for a further R150million in the
next 5yrs - Several proposals are at different stages of
completion to assist WSAs in OM programs as
part of infrastructure projects management - MW Board already consist of 50 women at Board
level in line with the ASGISA goals of placing
women at decision making levels of public service - Learnerships are being accelerated to advance
youth training and development
47IMPLICATIONS OF STATE OF NATION ADDRESS
- Raising capital through the Boards balance sheet
for infrastructure development on behalf of
Stakeholders - MWs BEE and SMME development initiatives have
ensured that in 2004 procurement from these
entities was already at 44.1 (R51 million), of
total procurement - Adoption of community agencies and centers by MW
ensures that community development is accelerated
- All Infrastructure programs, Basic water
provision, sanitation, etc are all channelled at
alignment with NEPAD goals
48FINANCIAL PERFORMANCE
49SUMMARY BUSINESS PERFORMANCE INDICATORS
50BUSINESS PERFORMANCE INDICATORS
51FINANCIAL PERFORMANCE
52FINANCIAL OVERVIEW
Consolidated Balance Sheet - Magalies Water
R255,8 million currently in the Investment Account
53FINANCIAL OVERVIEW
Consolidated Income Statement - Magalies Water
54FINANCIAL OVERVIEW
Magalies Water Bulk Income Statement (Vaalkop,
Wallmannsthal, Klipdrift Cullinan)
55FINANCIAL OVERVIEW
Magalies Water - Retail (CTMM) Income Statement
56FINANCIAL OVERVIEW
Magalies Water - Retail (Bojanala) Income
Statement
57FINANCIAL OVERVIEW
Magalies Water Roodeplaat Temba Water Services
Trust Income Statement
58FINANCIAL OVERVIEW
Magalies Water Rustenburg Water Services Trust
Income Statement
59APPROPRIATIONS
60APPROPRIATIONS
61LOAN STRUCTURE
Magalies Water Loan Stock Outstanding
62LOAN STRUCTURE
Magalies Water Long Term Commitments Outstanding
In the year under review, MW has settled the long
term debt of R107 Mill
63AUDIT OPINION
- Unqualified Audit Opinion by the Auditor General,
Treasury and External Auditors of Magalies Water
for 35 years now!!!!
64THANK YOU