Title: Maintenance Department Measurable Objectives May2008


1
Maintenance DepartmentMeasurable
ObjectivesMay/2008
The primary mission of the CCSD Maintenance
Department is to maintain the facilities and
physical plants in such a manner as to ensure the
classroom environment will support the
educational goals of the district in an effective
and efficient manner.
Supporting Education by Serving You
MRT Powerpoint Template

May 15, 2008 MPS-F034
2
Maintenance Department Measurable Objective
  • Measurable Objective 1 Increase/develop
    preventive maintenance (PM) work order processes
    in Maximo in addition to the re-commissioning
    effort teamwork between Energy Management Systems
    and Maintenance. (In house re-commissioning team)
  • Responsibility Tim DeBerardinis Coordinator IV
    and Floyd Mundt PM Manager
  • Report and Review Cycle Quarterly
  • Desired Results Routine preventive maintenance
    work order processing for appropriate crafts.
    Reduction in energy costs and reactive work
    orders as a result of the re-commissioning
    process.
  • Actual Results Winning-The PM program for
    testing back flow prevention devices is complete.
    The PM program for annual fire sprinkler testing
    is in development. While not complete, the
    re-commission work at Molasky MS has resulted in
    an improved temperature control in classrooms and
    reduced the run time of central plant equipment
    which will show a reduction in energy usage and
    costs.
  • Action Plan for Continual Improvement based on
    Results Enhancing preventive maintenance
    services throughout all aspects of maintenance
    applications and development of re-commissioning
    teams

MRT Powerpoint Template

May 15, 2008 MPS-F034
3
Maintenance Department Measurable Objectives
  • Measurable Objective 1
  • Cost Saving - Decreased operating and repair
    expenses. (In development of mechanism for
    reporting on actual savings.) The operating cost
    savings are derived from energy reports that are
    obtained through the Energy Management
    Department. Currently the Energy Management
    department is currently seeking a replacement for
    their Energy Use monitoring software.
  • Resource Needs - Additional FTEs to perform
    uninterrupted preventive maintenance services.
    Intent is to pay for those FTEs with the actual
    energy savings obtained by maximizing the system
    effiencies. (Through pilot program we are
    developing the cost savings potential that can be
    used to fund these positions.)
  • Best Practice/Comparisons Continual bi-monthly
    meetings with re-commissioning Test group,
    presenting findings at monthly Energy Task Force
    meeting comprised of representatives of
    Facilities Division and outside consultants. Dick
    Cuppett, chairman.

MRT Powerpoint Template

May 15, 2008 MPS-F034
4
Maintenance Department Measurable Objective
  • Measurable Objective 2 Set Target Numbers on
    KPIs for crafts on non-responsive work orders.
  • Responsibility Gary Woolman Coordinator III,
    Clark Neilson Coordinator III, Tim DeBerardinis
    Coordinator IV, Karyn Schierberl Coordinator
    III, Cynthia Atterberry Coordinator III
  • Report and Review Cycle daily, monthly, and
    quarterly
  • Desired Results To reduce the non-responsive
    work orders
  • Actual Results Losing in lifecycle requests and
    crafts with excessive work orders
  • (see why on next slide)
  • Action Plan for Continual Improvement based on
    Results Continue to ask for increase staffing
    to keep up with growth and training for
    technicians. Continue to look for techniques to
    increase work efficiency such as regionalizing
    the Maintenance Department. Development of
    additional defendable staffing formula for adding
    FTEs.

MRT Powerpoint Template

May 15, 2008 MPS-F034
5
Maintenance Department Measurable Objective -2
KPI target based on work orders able to complete
over the 2006-2007 year with present staff and
square footage.(Scope of each job could not be
considered at this time)
KPIs indicate inadequate staffing for number of
work orders received.
MRT Powerpoint Template

May 15, 2008 MPS-F034
6
Maintenance Department Measurable Objective -2
(Lifecycle Work)
KPI target based on work orders able to complete
in a month with present staff and square
footage.(Scope of each job could not be
considered at this time)(Manpower use to assist
but no longer due to budget cut)
KPIs indicate inadequate staffing for number of
work orders received.(Roof Shop is suffering due
to accomplishment of major lifecycle work which
limits the ability to respond to small repairs.
Compounded this fiscal year by budget cuts which
required elimination of all manpower FTEs.)
MRT Powerpoint Template

May 15, 2008 MPS-F034
6
7
Maintenance Department Measurable Objectives
  • Measurable Objective 2
  • Cost Saving Deferred maintenance work could end
    up as renovation work in a future bond fund.
    Reduction of deferred work will result in reduced
    bond requests saving tax payer dollars. (Working
    on formulas for reporting)
  • Resource Needs- CMMS, report enhancements, added
    KPIs, continued status review
  • Best Practice/Comparisons Study completed in
    2004 (updated annually) compares our staffing in
    all craft areas to those reported in a study by
    the Association of Physical Plant Administrators
    (APPA). Presently Maintenance is under staffed
    by??? Looking at other school districts (LA
    Unified) staffing formulas.

MRT Powerpoint Template

May 15, 2008 MPS-F034
7
8
Maintenance Department Measurable Objective
  • Measurable Objective 3 Report Improvements to
    Lost Work Days, examine issues causing injury and
    develop safety plans to reduce injuries in the
    work place.
  • Responsibility Jimmy Brimmer Director I
  • Report and Review Cycle quarterly
  • Desired Results Maximize safety for employees
    while also reducing costs to the school district.
  • Actual Results In progress (working on safety
    trainings)
  • Action Plan for Continual Improvement based on
    Results Continued bi-monthly Safety meetings to
    assess injury and trainings needed. Examine
    outside safety contractors for extended training
    in excessive injury related areas. New course
    outlines presented at all safety meetings.

MRT Powerpoint Template

May 15, 2008 MPS-F034
9
Maintenance Department Measurable Objective
Measurable Objective 3
Higher Cost Injuries to the Clark County School
District were examined
MRT Powerpoint Template

May 15, 2008 MPS-F034
10
Maintenance Department Measurable Objectives
  • Measurable Objective 3
  • Cost Saving - reduce costs to district due to Leg
    injury (25 in first year goal)
  • 124 lost work days averaged in last qtr of 2007
  • 120 lost work days in first qtr of 2008
  • Saved 4 work days (STA _at_19.00x32hrs608 .00)
  • Resource Needs serious need for consistent,
    detailed monthly reports from Risk Management to
    measure continual improvement.
  • Best Practice/Comparisons always seeking new
    safety measures to protect employees from injury.
    Consistent contact with outside vendors
    introducing new safety items such as safety catch
    for ladders and saw with safety sensor. Director
    to attend outside OSHA trainings. Searching for
    incentive-based employee program to promote shop
    to shop competitiveness for safety.

MRT Powerpoint Template

May 15, 2008 MPS-F034
10
11
Maintenance Department Measurable Objective
  • Measurable Objective 3 Collect, analyze and
    report strategies from all crafts to promotecost
    savings/cost avoidance for the Clark County
    School District Responsibility Cyndi
    Atterberry, Coordinator III, Work Mgmt
  • Report and Review Cycle Monthly
  • Desired Results To increase healthy competition
    among all crafts to compare different ways to
    save money to the Clark County School District.
  • Actual Results Winning!
  • Action Plan for Continual Improvement based on
    Results Monthly ISO Steering Committee Meetings
    with minutes posted to website and Employee
    recognition for ideas. (Looking for sponsorship
    MRT/Partnership Office?)

MRT Powerpoint Template

May 15, 2008 MPS-F034
11
12
Maintenance Department Measurable Objective
Measurable Objective 4
  • Shade Structures 6 year warranty up on fabric,
    4 at each ES _at_ 25,000 eachCost repairs (fabric
    only) cost between 5,156 to 11,216 (must be
    sent to factory) Costs could be reduced by
    looking into an alternate structure (metal vs.
    fabric), currently we have 750 shade structures
    Ralph Bateman
  • Wood Lathe purchased at 800.00 for Musical
    Instrument repair allows Tenons on musical
    instruments to be repaired instead of
    replacement. Savings to date on 4 work orders
    1000.00 -Tim Burns
  • Due to the excessive rising cost of clocks, 32
    clocks repaired on regular hours in
    Intercom/Clock instead of BER (replacement) Cost
    Savings 3072.54Supervisor works in the field
    more so technician stays in shop to repair.
    (price range 80-150) -John Craft
  • Salvage of old shelving out of BERd vehicles put
    into new vehicles Cost Savings 2490 -Jim Nickas
  • Reuse of hard to get lock hardware from rehabs
    (through salvage) Cost Savings 4731.92 -Keith
    Anderson
  • Sending 4 employees to 3 trainings (outside of
    district) _at_ 199 to capture trainings and then
    train 35 supervisors within department. Cost
    Savings 4577 -Cyndi Atterberry
  • IP-Maintenance Building Engineers installing T-8
    lighting with motion sensors in portables. Labor
    Material paid with EMS budget. Estimated Cost
    Savings to District 17,000 20,000 Rebate from
    NV Power -Dick Cuppett

MRT Powerpoint Template

May 15, 2008 MPS-F034
12
13
Maintenance Department Measurable Objective
Measurable Objective 4
MRT Powerpoint Template

May 15, 2008 MPS-F034
13
14
Maintenance Department Measurable Objectives
  • Measurable Objective 4
  • Cost Saving this quarter 52,871
  • Cost Savings/Avoidance 3 quarters 12,470,175
    52,871 12,523,046
  • Resource Needs - Trained and in some cases
    certified technicians, further empowerment of
    existing staff to implement new projects.
  • Best Practice/Comparisons - We continually want
    to set the bar for savings and encourage
    competition within departments. In addition, we
    consistently meet with technicians and outside
    utilities to strive to gain new ideas and tested
    patterns for cost savings.

MRT Powerpoint Template

May 15, 2008 MPS-F034
14
15
Maintenance Department Measurable Objectives
  • Additional Items Concentrated Areas
  • 18 Management Process Procedures approved
  • 5 Management Process Procedures in progress

MRT Powerpoint Template

May 15, 2008 MPS-F034
15