System Ops 2005 Release Plans - PowerPoint PPT Presentation

1 / 1
About This Presentation
Title:

System Ops 2005 Release Plans

Description:

Energy and Market Management ... 40096 Improvements to VSA/DSA (2.2) ... PR-40099 CTGS Import/Export Dump Utility (1.0) Release SO 4B. Release 4B (2004 Carry) ... – PowerPoint PPT presentation

Number of Views:13
Avg rating:3.0/5.0
Slides: 2
Provided by: RobCo74
Category:
Tags: com | dump | ops | plans | release | system

less

Transcript and Presenter's Notes

Title: System Ops 2005 Release Plans


1
System Ops 2005 Release Plans
System and Market Operations PUCT Market
Oversight Division Qualified Scheduling
Entities Transmission Service Providers
Energy and Market Management Texas Market
Link Settlements and Billing Market
Oversight Monitoring Enterprise Information
Systems
Stakeholders
Systems
Q2 05
Q3 05
Q1 05
Q4 04
Q4 05
Q1 06
Release SO 3
Release SO 5
Release SO 4B
Release SO 4A
Release 4A (2004 Carry) 30085 Special Protection
Schemes (1.2) 40096 Improvements to VSA/DSA
(2.2) 40092 Improve Power System Model
Maintenance via Database Archive Comparison
(1.1) 40049 Improve Data Elements for Local
Constraints OOMs (1.1) 30131 PRR359 Improved
Resource Plan (1.2) 40050 Unit Specific Bid
Limits based on Generic Costs (1.1) 30140 AS
Simultaneous Selection (1.1) 40051 OOM
Participation in Providing Ancillary Services
(1.1) 30161 PRR413 - Optimization for the Whole
Operating Day in RPRS Procurement Process (1.1)
40062 PUCT Upgrade SPD (1.1) 30163 PRR422 - OOM
Zonal Dispatch Instructions (2.2) 40072 PUCT Add
Corrected MCPEs to the MOS dbase and pass to MMS
(1.1) 40048 EMMS Parameters Capture for MMS
Reclear Fidelity (1.1) 30183-99 (1.1)
Release 5 (Non-AREVA) 30018 RT Market Ramp Rate
Feasibility Study (1.1) (OM) 30084 CSC Thermal
Volt Limits (1.1) 40113 RAPC Modeling (1.0) 40090
Operator Training Simulator (1.1) 30105
Congestion Mgmt Reports (1.1) 30028 Overload
Reports (1.1) 30029 Over limit
Reports(1.1) 50044 Near Miss Indicator
(1.1) 50008 Aggregation of Combined Cycles
(1.1) 50016 AVR Validation (1.1) 50021 Improve
Reliability of Freq Input (1.1) 50002 MOMS
Enhancements (1.1) 50003 MOMS Enhancements to
AREVA SPD (1.1) 50040 EMMS SPR Enhancements (1.2)
(OM) 50134 DC Tie Automation and Scheduling
(1.1) 50135 Topology Estimation System Phase 1
(1.1) 50136 EMMS Software Upgrade - OSI PI and
OAG (1.1) 50050 Satellite Communications for
Black Start suppliers (1.1) 30021 Replace DSM6
and VGR Freq Recorders (1.1) 50142 Network Model
Management System (NMMS) (1.1) 50130 SCE
Performance and Monitoring (1.1) 50139 Critical
SIRs from Implementation of SMP/EMP 2.2 (1.1)
  • Release 3 (2004 Carry)
  • PR-30144 EMP 2.2 Upgrade (1.0)
  • PR-30074 Enhance STNET Multiple Selected Time
    Ranges (1.1)
  • PR-30170 Implement Selected Contingency in PF
    (1.1)
  • PR-30096 ESCA to PTI Download (1.1)
  • PR-20159 Load Rollover during line outage (1.1)
  • PR-40099 CTGS Import/Export Dump Utility (1.0)

Release 4B (2004 Carry) 30016 Dynamic Ratings
(1.3) 30129 Remote Access to Study Cases
(1.0) 40084 Outage Scheduler Phase II
(1.0) 40086 Incident Report (1.0) 40100 Daily
Operations Report (1.0) 40100 RTCA Archiving
(1.0) 40098 Performance Monitoring for SCADA/SE
(1.0)
Completed
Accelerated to Support Capability
Active (at least in Initiation)
Write a Comment
User Comments (0)
About PowerShow.com