2Construction Schedule
Status
2
3Construction Schedule
- Mile Stones
- Start the Linac Beam Commissioning Dec., 2006
- Start the RCS Beam Commissioning Sep., 2007
- (start to transport the beam from the linac
to the - RCS)
- Start the MR Beam Commissioning May, 2008
- (start to transport the beam to MR and/or MLF)
- Start the Experiment sometime in JFY2008
Status
3
4Beam Power Goal
Final Goal (Phase II)
- MR 0.75 MW (50 GeV, 15 ?A), slow and fast
extraction for nuclear and particle physics
experiments - RCS 1 MW (3 GeV, lt1 ms, 25 Hz) for spallation
neutron source
Phase I Goal
- MR 0.6 MW (40 GeV, 15 ?A)
- RCS 1 MW (3 GeV, 333 mA)
Phase I0 Goal
- MR 0.36 MW (40 GeV, 9 ?A)
- RCS 0.6 MW (3 GeV, 200 mA)
In order to increase the MR beam power beyond
this level, various operational modes have been
proposed, including the increase in the number of
MR bunches, the increase in the MR repetition,
and so forth. However, the accomplishment of the
Phase I0 Goal with the robust, reliable hardware
is most important. Then, the attempts of various
operational modes will be realistic, and
efficient.
Ring
4
5T2KK
Ishitsuka et al. PRD 72 (2005) 033003
sign(Dm2)
CP violation
Hyper-K
T2KK (0.270.27Mt)
2s
3s
T2K-II (0.54Mt)
Distance from the target (km)
JPARC
Korea L10001250km OA 1.02.5deg
Kamioka L295km OA2.5deg
Off-axis angle
K. Hagiwara Nucl. Phys. Proc. Suppl. 137 84 (2004)
6PRISM/PRIME
?-e conversion experiment sensitivity BR-
10-18 1011-12?-/sec 68MeV/c - 2 by
phase rotation in a FFAG
7Progress in PRISM-FFAG magnet
- The first batch of PRISM-FFAG magnet has been
delivered in May, 2006. - Successful setup in KEK test area
- Field map of one of the magnets has been measured
by 3D-scanning probes - Finish the measurement for 3 of the magnets, and
check the field quality in Sep., 2006. - The second production batch will be delivered by
March, 2007. - Will study optics using alpha particles (2007)
8MICE
KEK pi2 beam line
- SciFi Tracker
- Successfully tested tracker prototype in KEK test
beam (2005) - Improving quality control scheme for full tracker
production - Will prepare waveguides for full tracker
- Install full tracker in RAL, and start
commissioning in Oct. 2007. - Liquid Hydrogen Absorber
- Convection-type absorber cooled by He flow has
been successfully filled with LH2 in MTA at FNAL
(2005) - Further test is scheduled in collaboration with
MUCOOL
Tracker prototype inside 1T solenoid
KEK absorber II
9(No Transcript)
10(No Transcript)
11(No Transcript)
12(No Transcript)