Title: Metro Gold Line


1
Metro Gold Line Eastside Extension
2
Eastside Extension Community
3
Eastside LRT Constructors, J.V.
15
35
50
4
Quality Program QA/QC
  • Quality Manual/Plan site specific
  • Quality Procedures
  • Washington Group International procedures
    modified for project
  • Project Execution Procedures (PEPs) that have
    quality output
  • All PEPs and the Sarbanes Oxley Act
  • Flow down to Subcontractors

5
DESIGN
  • Design Quality Management
  • DMJMHarris/WIS JV
  • Used DMJMHarris Design Project Quality Manual
    modified for this project

6
Design QM Major Elements
  • Design Task Protocols defining design inputs
  • Preparation and Review of Calculations, Drawings
    and Specifications
  • Technical Studies and Reports
  • Software Quality Assurance

7
Design Coordination
  • 19 Design Subcontractors
  • 6 Design-Build Subcontractors
  • 13 Third-party public authorities
  • 21 Design Packages
  • Over 300 specification sections
  • Nearly 4000 drawings
  • Think how many review comments we received!

8
CONSTRUCTION
  • QUALITY

9
Organization
  • Quality Manager reports to the Project Director
    AND Business Unit Director of Quality
  • Independent field inspection staff
  • On-site test lab for soils, asphalt and concrete
    ASHTO Caltrans certified

10
Management Review
  • Yearly audits by Corporate or Business Unit home
    office
  • In-house quality surveillance program
  • Monthly Quality Summary Reports

11
Document Control
  • Performed under defined processes/procedures
  • Nearly all documents are scanned and available
    from any desktop computer great time saver for
  • Submittals
  • RFIs
  • Correspondence

12
Procurement
  • All Subcontracts receive Quality review and
    approval prior to RFP
  • All purchase requisitions receive Quality review
    and approval

13
Process Control
  • Work Plans
  • Readiness Review Meetings

14
WORK PLANS
  • Description of work
  • Prerequisites
  • Public exposures
  • Hazard analysis
  • Applicable Specifications Drawings
  • Submittals status
  • RFIs status
  • List of supervision and subcontractors
  • Schedule
  • Any special handling, shipping or storage
    requirements
  • Special process included (welding, NDE, coatings,
    etc.)
  • Acceptance criteria and tolerances for critical
    work elements
  • Inspections required and hold points
  • Checklists
  • Protection of completed work

15
Inspection Testing
  • Daily Reporting
  • Use of Checklists
  • On-site testing laboratory (allows for additional
    job-control testing)
  • C0800 DBB vs. C0801 DB contract/designs

16
Training
  • Jobsite orientation
  • Lunch Learn one hour presentations at lunch
    time

17