Title: APPLICATION OF NONDESTRUCTIVE TESTING TECHNOLOGIES IN TEXAS
1APPLICATION OF NONDESTRUCTIVE TESTING
TECHNOLOGIES IN TEXAS
Dar-Hao Chen, Ph.D., P.E. Texas Department of
Transportation
2ACKNOWLEDGEMENTS
- Tom Scullion
- John Bilyeu
- Paul Rollins
3(No Transcript)
4(No Transcript)
5(No Transcript)
63 yr old 5 inch Ty B, PG76-22-plant 40 mile
away 16inch (lime treated base) Lime treated
subgrade
7(No Transcript)
8(No Transcript)
95 inch-AC 16inch-lime treated base 12 inch-lime
treated subgrade
10IH20
JCP was overlaid with 6inch AC in 1997 10 mile
project- 5 mile method spec, 5 mile QC/QA
11MP109 WB
12AC
JCP
Inch
MP111
IH30West
13AC
JCP
Core Location
(1) 1500ft West of MP105 (2) 1500ft East of
MP105 (3) 200ft West of MP104 (4) 2300ft West of
MP104
MP105
IH30West
14200ft West of MP104
15Chronic Pavement Distress
Rehabs1996, 2001 (top 2 inch AC) (1) Total AC
4.5-8.5 inch (2) 11 inch sand shell base (3) 8 "
select material (4) 6" lime treated subgrade
Condition in 2004
1620 million ESAL 2004-2024
17Bridge
Problem Area at 2
Strong Red/Blue indicates porous layer
Problem Area at 4
Severe surface distress
US69S-Outside Lane
18Location 400
Porous layer that lead to debonding
19Location 750
Porous layer that lead to debonding
20Location 400
21Is it ok to overlay aged CRCP, JCP pavement? What
is the vertical movement on the joint/crack?
CRCP built in 1960s First major rehab
22Rolling Dynamic Deflectometer (RDD)
Diesel Engine powers Hydraulic Loading System
Hydraulic Loading System
Loading Rollers
Rolling Sensors
23IH20, 4inch AC on CRCP
I20W
24SH 3 Houston Crack Retarding Layers Strata vs
Petromat vs Control Traditional Mixes do not
stop Reflection Cracks
Strata Type D Cycles to failure 750
24 months old overlay over JCP
Control Type D cycles to failure 20
25IH20, 4inch AC on CRCP
I20W
26I-20 Marshall, TX RDD Deflections, Westbound,
Outside Lane, Outside Wheelpath March 2001 -
Section 1
40
Sensor 1 - Before Milling
35
Baseline
2X Baseline
30
3X Baseline
25
10-kips Displacement (mils)
20
15
10
5
0
3100
2900
2700
2500
2300
2100
1900
1700
1500
1300
1100
Distance (feet)
27(No Transcript)
28One Year
29Is it ok to overlay aged CRCP, JCP pavement? What
is the vertical movement on the joint/crack?
CRCP built in 1960s First major rehab
30US96
31LTE 27-70
8 inch JCP, 1957 PFC, SMA, Ty D
5 million ESAL-20 yrs
32Badly Distressed
No Distresses
33SH73WB
3.5 inch AC-1994 pressure grout-1994 11 inch
JCP-1958 LTS-1958
34West Bound
35(No Transcript)
36Section 4
Section 3
Section 1
Section 2
Dowel Section
37US82
38IH 45 NB Section 1 TRM 7 .2 to TRM 8 .8
39IH45
Joints
Joint Quality
Base Quality
40 41(No Transcript)
42Sta.43437 pg1
43(No Transcript)