Status of Signal Hedgehogs - PowerPoint PPT Presentation

About This Presentation
Title:

Status of Signal Hedgehogs

Description:

HG-mezzanine connector business. Final production organization. Test setup at the company ... Hedgehog-mezzanine connector business. E. Spiriti. December 11th 2001 ... – PowerPoint PPT presentation

Number of Views:26
Avg rating:3.0/5.0
Slides: 9
Provided by: spiritie
Category:

less

Transcript and Presenter's Notes

Title: Status of Signal Hedgehogs


1
Status of Signal Hedgehogs Atlas Muon elx
meeting E. Spiriti
  • Prototype versions
  • HG-mezzanine connector business
  • Final production organization
  • Test setup at the company

2
Signal Hedgehogs (4 layer chambers)
http//www.roma3.infn.it/spiriti/hedgehogs-6x4.ht
ml
4 layers 10K version delivered
  • Tested successfully at
  • Boston (EIL)
  • Freiburg
  • Cern (BIS)
  • Roma3 (BIL)

3
Signal Hedgehogs, shaped version
(420) prototypes produced September 2001 shipped
to Boston, LMU, LNF, MPI, Roma3
  • Few shielded PCBs ( only for 4 layers) produced
  • ( under test at Boston )
  • Possible new run for new shaped shielded PCBs?
  • ( under discussion )

4
Hedgehog-mezzanine connector business
http//wwwatlas.mppmu.mpg.de/atlas_mdt/mdt_elx/may
_2001/
FC_vert_space_S_Podk_5_01.hpgl
FC_vert_space_U_Ldgf_5_01.eps
24.95mm
21.00mm
Hedgehog Mezzanine distance (when inserted)
Real board 22 mm
  • 10K production DW-08-11-L-D-635
  • new shaped DW-08-11-L-D-535
  • final production ZSS-108-04-G-D-825

Length 23.62mm
5
Final production organization
CORE cost distribution for signal HG
  • Rome3 group submitted already orders for
  • the INFN (LNF, Rome, Pavia) production
  • 650650 boards for BML
  • 760760 boards for BIL
  • R. Richter proposal is to provide shadow orders
  • to the same companies by all other groups.
  • Rome3 responsible for
  • technical support
  • providing test facilities to the company

6
Costing component procurement
Cost per board 36 CHF
  • HV murata capacitor and pin receptacle
  • ordered thru CERN (HV hedgehogs tender)
  • all remaining components ordered in Italy
  • PCBs from a company in Rome (ELCO)
  • connectors from Samtec still open?

7
Test fixture prototype
HV input
Temperature and umidity sensor
Modified to allow testing of all 4 types
  • new version housing 8 boards is being built
  • two will be provided to the assembly company
  • test procedure completely automatic
  • time scale March 2002

8
Test fixture for production tests
0.8 m
1.8 m
Cytec HV switches
HV lines
Pico Amperometer (from Pavia)
HV power supply
Windows PC
RS232
Caenet
Write a Comment
User Comments (0)
About PowerShow.com