Z-06-03 (Brewer) Z-06-04 (Shaw) - PowerPoint PPT Presentation

1 / 15
About This Presentation
Title:

Z-06-03 (Brewer) Z-06-04 (Shaw)

Description:

Two applications to rezone approximately 18 acres from RU-4 to TR-36 and ... Overall density would increase nearly two-and-a-half times over that which would ... – PowerPoint PPT presentation

Number of Views:16
Avg rating:3.0/5.0
Slides: 16
Provided by: SMon
Category:

less

Transcript and Presenter's Notes

Title: Z-06-03 (Brewer) Z-06-04 (Shaw)


1
Z-06-03 (Brewer)Z-06-04 (Shaw)
  • Two applications to rezone approximately 18 acres
    from RU-4 to TR-36 and approximately 92 acres
    from RU-4 to RU-2 for purposes of establishing
    two subdivisions with a total of 64 proposed
    dwelling units in the Babocomari Plan Area.

2
Summary of Requests
Z-06-03 (Brewer) Z-06-04 (Shaw)
Parcel 106-15-015F 106-15-020B
Parcel Size 30 acres 80 acres
Proposed Zoning TR-36 and RU-2 RU-2
Growth Category B and D D
Plan Designation LDR-1 and RR RR
Number of Units 24 40
3
Summary of Requests
  • Two separate rezoning applications represented
    by the same person
  • Same provisions as those of previous rezonings
    in the Babocomari Plan area including the same
    CCRs, and service by the Whetstone Water
    Improvement District and Whetstone Fire District
  • A total of 64 dwelling units proposed in concept
    plans

4
Subject Properties
RR
LDR-1
5
(No Transcript)
6
(No Transcript)
7
Water Budget
  • RU-4 projected consumption (27 lots) 24
    ac-ft/yr
  • Projected Consumption for proposed (64 lots)
    10 ac-ft/yr
  • 82 gpcd for Whetstone Water Improvement District
    vs. 312 gpcd for RU-4
  • Building Envelopes 15,000 sq. ft. (TR-36)
    25,000 sq. ft. (RU-2)
  • Turf Limits
  • Mesquite Removal
  • Drought-Tolerant Landscaping
  • Hot Water Recirculation
  • Storm Water Recharge

8
East Ronald Reagan Parkway
9
East Unnamed Access Road
10
North Parcel 106-15-020B
11
  • Protests and Support
  • Z-06-03 (Brewer) None.
  • Z-06-04 (Shaw) One protest two support.

12
Factors Favoring Approval
  • Rezoning to TR-36 in areas designated as LDR-1
    achieves a gross density no greater than one
    house per acre and is in substantial conformance
    with the Babocomari Area Plan.
  • Rezoning to RU-2 in areas designated as RR is in
    substantial conformance with the Babocomari Area
    Plan.
  • The housing stock in the county would increase
    through subdivision rather than lot-splitting.
  • The TR-36 and RU-2 districts are a logical
    transition from the GB to the west and TR-18 to
    the north to the RU-4 to the east.
  • As a part of the Countys subdivision process and
    as required by ADOT, the developers of the
    subject parcels must collaborate with other
    developers in providing access improvements that
    result in safe ingress off of and egress onto
    Highway 90.
  • The proposed subdivisions would be a part of the
    Whetstone Water Improvement District (not on
    individual wells), would be subject to water
    conservation CCRs, and are projected to consume
    less water than if the zoning remained RU-4..

13
Factors Favoring Denial
  • Improvements to accommodate the additional
    traffic generated by the proposed subdivisions
    are necessary.
  • Overall density would increase nearly
    two-and-a-half times over that which would occur
    under existing zoning.

14
Staff Recommendation
  • The Planning Department recommends forwarding
    these requests to the BOS for approval with the
    following conditions
  • The maximum number of dwelling units is 64 (24
    Brewer, 40 Shaw) and a subdivision review process
    is required.
  • Prior to any subdivision plat approval, the
    applicants shall
  • participate in a TIA with other developers
  • commit to a development agreement or other
    acceptable mechanism specifying the funding,
    timing, and responsibility for improvements
    stipulated in the TIA
  • participate in a comprehensive hydrology report
    to address the areas drainage and floodplain
    issues.
  • 3. All future subdivisions shall include specific
    disclosure language in the general notes and
    CCRs regarding military activities in the area
    as drafted and approved by Fort Huachuca.

15
Planning Zoning Commission Recommendation
  • On March 8, 2006, the Planning Zoning
    Commission voted unanimously to forward a
    recommendation of approval of these rezoning
    requests with the aforementioned conditions to
    the Board of Supervisors.
Write a Comment
User Comments (0)
About PowerShow.com