Title: Project Status


1
Project Status
2
Telling stories
3
The Story
  • The Inheritance
  • Stellar seismology is recognized as a priority
    Scientific Prospective Workshop (Deauville, 1985)
  • Study of the Sun
  • Ground observation
  • IPHIR (Phobos mission)
  • GOLF (Soho mission)
  • EVRIS (Mars-96)
  • The Birth
  • Scientific Prospective Workshop (Saint-Malo,
    1993)
  • The Search for extra-solar planets did join the
    program
  • The Maturation ? 1993-1999
  • Phases 0, A B
  • The difficult starting 1999-2003
  • COROT in the frame of the Faster Cheaper
    scientific missions based on the PROTEUS bus
    (Jason-1, Calipso, Corot, Smos, Jason-2)

4
A long story
5
The PROTEUS Bus
  • PROTEUS is a multi-mission platform European
    standard
  • Qualified for all LEO missions
  • 500-600 kg satellite class, 1m3 volume (bus)
  • Typical payload envelope 300kg, 300W
  • PROTEUS flight domain
  • Any orbit in the 700-1500 km range
  • Precise 3-axis attitude control
  • Compatible with available small-medium launchers
  • And an associated generic Ground Segment
  • PROTEUS stands for Plateforme Réutilisable
    pour lObservation, les Télécommunications
    Et Utilisations Scientifiques

6
A long way The Instrument
1995 - Phase 0
1997 - Phase A
Sept 2004 the Flight Model
7
Organization Overview
8
Cooperation
  • Cooperation is the main feature of the COROT
    organization
  • Cooperation makes the management more difficult,
    the relationship being based on the best effort
    of each party
  • Cooperation makes more technical interfaces to
    handle at system level
  • So, why looking for cooperation ?
  • Cooperation has been mandatory to re-start the
    program in 2000/2001
  • Cooperation increases the ressources (more funds,
    more manpower)
  • Probably the most important, Cooperation makes
    the project stronger from the human being
    prospecpective
  • By very fruitful exchanges of engineering
    practices, ways of work and simply cultures
  • By giving to this mission an international
    dimension

9
Brasil in Corot
  • Management
  • Steering Committee
  • Science
  • Scientific Committee
  • Co-Is
  • Ground Obsevation
  • Natal ground station (hardware operations)
  • Researchers Engineers (5)
  • Edouardo Costa, Claudia Angeli (at Meudon)
  • Leonardo Pinheiro (at Cnes-Toulouse, in-flight
    calibrations)
  • Fabio Fialho (at Meudon, working with M. Auvergne
    on windowings)
  • Vanderleï Parro( Meudon, Instrument-BEX
    electronics integration)

10
The Present
11
The Present
  • The project is a hive of activity
  • 15 (successful) reviews within the last 10
    months
  • The System and all components are under
    development
  • The System The System Interfaces Review is
    coming
  • The Ground Segment Mission Centre Design
    Customization of the Proteus standard Control
    Centre
  • The Satellite The Flight Model of the Proteus
    Bus is under integration
  • The Instrument the Flight Model is under
    integration (EMI/EMC tests are starting)
  • The Launcher is ordered (Soyuz from Baïkonour)
  • Everything is on-time for a Launch at Baïkonour
    (Kazakhstan) planned during the Summertime of
    2006 (June is targeting)
  • The funding is nominal

12
Pictures of some Flight Models
M1 mirror
Baffle
PROTEUS
Telescope structure
Telecope with mirrors OD
13
The 2005 Milestones
  • Next Wintertime
  • Start of the final integration of the instrument
    in Toulouse
  • System Interfaces Review
  • Springtime
  • Satellite CDR
  • Preliminary Launcher Mission Analysis Review
  • Summertime
  • Acceptance tests of the Instrument
  • Earth Terminal (TTCET) delivery in Natal
  • Ground segment Integration
  • Start of System Compatibility tests
  • In the Fall
  • Delivery of the Instrument for Flight
  • Satellite Integration
  • System Validation

14
Status in short
  • A strong acceleration of the project
  • The flight hardware is under manufacturing,
    integration test
  • The System activities are on time
  • The Ground Segment and the preparation of the
    Operations are on time
  • The launcher is ordered
  • The COROT mission is in a good shape

15
The Short in short
  • The working days are very long and by the same
    time very short
  • The COROT mission is still leading the race
  • The COROT project is vey happy to work with
    BRASIL
  • The life is beautiful (particularly in NATAL)