Title: Kuwait Oil Company A Subsidiary of Kuwait Petroleum Corporation
1Kuwait Oil CompanyA Subsidiary of Kuwait
Petroleum Corporation
Doing Business with Kuwait Oil Company LAGCOE
- 2009
Lafayette, Louisiana
2Agenda
- KOC Strategy
- Drilling Activities
- KOCs Portfolio of Major Projects for Intl.
Contractors - Business Opportunities
3KOC Strategy
4KPC Companies
5 Mission
- To explore, develop and produce to marketable
quality the hydrocarbon resources in the State of
Kuwait. - To safeguard our people and the environment.
- To conduct our business in accordance with
government policy, good reservoir management
practice and by using the most efficient and
economic means available.
6Vision
- Achieve a leading global position in Upstream Oil
Gas as an integrated, value- driven enterprise,
by - Maximizing the strategic value from oil
- Realizing the potential of gas
- Growing reserves for a sustainable future
- Being an employer of choice
- Realizing value from technology
- Strengthening our commitment to HSSE
- Striving for excellence in performance, and
- Contributing to the Enterprise and State.
7Key Feature of our Strategy
- Achieve the following production targets
- 3.0 MMBOPD by 2010
- 3.5 MMBOPD by 2015
- 4.0 MMBOPD by 2020 and maintain it until 2030
- Develop Heavy Oil
- Produce 600 MMSCFPD of free gas by 2010/2011 and
increase to 1,000 MMSCFPD by 2015 - Pursue aggressive exploration program including
the offshore.
8Challenges
- Developing high pressure high temperature complex
gas reservoirs - Develop heavy oil to reach 450 MBOPD by 2030
- Skilled and Experienced Manpower
- Water Management
- Technology
- Environmental issues
92 - Drilling Activities
10 11924
884
764
668
589
266
128
87
1212
13 1414
153 - KOCs Portfolio of Major Projects for Intl.
Contractors
16 Major Infrastructure Projects (coming 2 years)
The projects are classified as 1. Pipeline
projects (3 Nos.) 2. Gas projects (2
Nos.) 2. Injection projects (3 Nos.) 3.
Safety Instrumentations (4 Nos.) 4.
Electrical projects (3 Nos.)
17FUTURE PROJECTS (Contd.)
Pipeline Projects (1/2)
18FUTURE PROJECTS (Contd.)
Pipeline Projects (2/2)
19FUTURE PROJECTS (Contd.)
Gas Projects (1/2)
20FUTURE PROJECTS (Contd.)
Gas Projects (2/2)
21FUTURE PROJECTS (Contd.)
Injection Projects (1/3)
22FUTURE PROJECTS (Contd.)
Injection Projects (2/3)
23FUTURE PROJECTS (Contd.)
Injection Projects (3/3)
24FUTURE PROJECTS (Contd.)
Safety Instrumentation Projects (1/2)
- Installing Surveillance Systems, Access Control
Systems and Intruder Detection Systems at (96)
sites that includes Gathering Centers, Booster
Stations and other facilities of the Company
distributed across the Kuwait oil fields and can
be considered a scheme of National scale. The
integrated security system will provide
monitoring and control functionality at (4)
Regional Asset Security Centers and a Central KOC
Security Center which shall be built as part of
this project. The scope of work will include
design, supply, installation, configuration and
commissioning of a 1300KM Fiber Network that
shall provide connectivity to over 2500 cameras,
security management systems, alarm monitoring
stations and access control systems.
EF/1700
- Integrated Security system in all KOC Facilities
- Tender issue Jul-09
25FUTURE PROJECTS (Contd.)
Electrical Projects (1/2)
26FUTURE PROJECTS (Contd.)
Electrical Projects (2/2)
- The main objective of this project is the safe
operation of the oil facilities demonstrated in
reconstruction of a number of existing
substations and control rooms in a way that would
provide the necessary safety for personnel and
equipment. This objective will be accomplished by
the following - 1 Construct two story elevated, blast proof
control rooms, and maintenance offices for 9
company oil/gas facilities (7GC's 1,3,6,7,8,20
21 2 Boosters stations). 2 Construct safe,
elevated, centralized electrical Substations /
switch rooms with advanced equipments at 19
locations through out SEK fields (14 Nos. SEK
GC's and Booster Station 140 and 150, NTF,STF
M52). 3 Power Distribution SCADA for SEK field
including SCADA control room.
EF/1600
- Enhancement to Substations and Control Rooms at
SEK GCs, BSs, NTF STF and Replacement of M52
Substation at MAA - Tender issue Apr-11
274 - Business Opportunities
28Current Opportunities
- KOC is responsible of major upstream operations
in Kuwait. - KOC runs and maintains Ahmadi City.
- KOC owns and manages Ahmadi Hospital (Southwell)
- Current Live contracts exceed 600 valued over
20 Billion US - Current tenders exceed 250 Nos. valued over 15
Billion US under different stages of bidding - KOC total staffing of 6,000 employees.
- Works and Services are entirely outsourced.
- KOC relies on reputable contractors and vendors
to support its activities, objectives and long
term strategies
29Vendors/ Manufacturers
- Selection of proven / reputed manufacturers
- Products meeting specification, quality and
delivery schedules. - Approved Vendors benefit from Direct / Indirect
Procurement opportunities -
30Approved Categories
- No. of Main Categories (125)
- No. of Sub Categories (112)
- Total No. of Approved Manufacturers (1606)
- No. of Countries (48)
- No. of Approved USA Manufacturers (237)
31Minimum Requirements for Vendors
- Minimum Requirements
- Prequalification limited to manufacturers (not
assembler/ system integrator) - Minimum 5 years of proven experience.
- Own design, manufacturing testing capabilities
- Accreditations such as ISO/ ASME/ API/ HSE/ NB
Type Test Report from Internationally recognized
testing agencies like KEMA / BSI etc. - Past experience with IOCs / ISPs for last 5
years. - Audited Financial Statements for 2 yrs in
accordance with IFRS
32PQ of Contractors, SPs Consultants
- KOC implements OPEN ONGOING prequalification
- Quarterly monitoring of companies performance.
- Annual verification of financial capabilities of
approved companies - Poor performance of companies entail Q-listing.
- Pre Qualification Types
- PQ for existing categories of Works/ Services
- PQ for Specific Projects (on case to case basis)
- PQ for Companies Offering New Technologies
33Categories for Intl. Companies
- Major EPC Contracts (gt US 500 million)
- Large EPC Contracts (US 200-500 million)
- Medium EPC Contracts (US 50-200 million)
- Small EPC Contracts (lt US 50 million)
- Construction of Mega Tanks
- Offshore Support Services
- Onshore Oil and Gas Pipeline Projects
- General Specialized Inspection Services
- Surface Well Testing
- Offshore Drilling Rig Services
- Shallow, Medium and Deep Drilling Services
- Full Maintenance Services of Production Facilities
34Categories for Intl. Companies (contd.)
- Maintenance of Fire Fighting Systems
- Slick Line Services
- Dredging Works
- Marine Operations Services
- HSE Consultancy Services
- Tubular Inspection Internal Corrosion Services
- Mud (Products, Engineering Logging) Services
- Rock Properties Fluid Analysis Services
- ESP, Ultrasonic ILI Repair of Sub-sea Pipelines
- Integrated Security Systems
35e-Tendering Portal www.kockw.com
- Establishment of KOC e-Tendering with support of
Microsoft - Register and update profile online
- View KOC Tenders and categories of works
- Download Tenders and PQ Documents
- Access to commercial documents
- Security and Confidentiality
- The Company encourages companies to get to know
KOC and participate in its upcoming Tenders - KOC looks forward to international companies
future presence and sharing of business
opportunities in Kuwait
36Enhancements to Contracts Terms Conditions
- KOC carried out series of improvements with
respect to its manner of conducting business. - Enhancement of KOCs Lump Sum Turnkey (LSTK)
Model Contracts for Major Projects. - KOC witnessed increased participation of
international EPC contractors in Companys
tenders. - The areas for improvement were identified jointly
with International Contractors/ Consultants. - The Enhanced LSTK model contract introduced in
2006 - The feedback obtained has been extremely
positive. - Benefits from increased participation encouraged
KOC to pursue wider improvements in Terms
Conditions of Contracts.
37Enhancements to LSTK Contract Model
- Summary of Enhancements
- Sharing of Bidding Fees
- FEED Verification Pre/ Post Award of Contract
- Improvement to Bank Guarantees/ Bonding
requirement. - Enhanced Contractors Cash Flow
- Non-incorporated Joint Ventures / Consortia
- Limitation of Liability
- Clear process for Variations
- Performance/ Schedule Incentives
- Currency Commodity Price Fluctuations
- Enhanced Claims Handling
- Alternative Dispute Resolution
- General Improvements
- Re-allocation of risks to party best able to
control that risk - Risks allocated in line with international norms
- More user-friendly structure, terminology and
language - Better administration
38Alternative Contracting Options
- Most producers are under pressure to increase
production. - Many international Contractors are unwilling to
bid for projects on a lump-sum turn-key (LSTK)
basis. - KOC has reacted to such market demands.
- Two (2) phases for the development of the
following Four (4) alternative EPC Model
Contracts - Phase (I) Re-measurable Model Completed
- Cost Plus Model
- Phase (II) Cost Plus Convertible Model
- Cost Plus (FEED by Company)
- Early Production Facilities Model
- Two Envelope Bidding System