Title: Alpha Magnetic Spectrometer AMS 02 Structural Testing Overview
1Alpha Magnetic Spectrometer (AMS) - 02
Structural Testing Overview
- Hsing Ju
- April 11-15, 2005
2Frequency Strength Verification Testing
- Dynamic Tests
- Cryomagnet System Sine Sweep Tests (INFN)
- Cryomagnet STA (STA VC, STA SFHe Tank, Cold Mass
Replica) will be tested in a sine sweep test in
order to excite the non-linear support straps to
load levels so that the strap reaches and extends
into the stiffness region associated with the
launch strap engagement - Input environment will be developed using
non-linear DCLA results. The Cryomagnet system
response will be analytically determined and
reproduced during testing. - Test will be performed with the system at
cryogenic temperatures - Will include enough instrumentation to
dynamically correlate nonlinear response of the
FEM
3Frequency Strength Verification Testing
STA Cryosystem in the Vacuum Case Test Fixture
(VCTF)
VCTF
Cryomagnet STA
4Frequency Strength Verification Testing
Existing hardware at INFN in Perugia, Italy
TEAM Slip Table
Ling Shaker
Riser Base
System Base
5Frequency Strength Verification Testing
STA Sine Sweep Test X-Y Configuration
VCTF
X-Y Transition Frame
Team Spherical Coupling (Supplied by NASA/JS)
Cryomagnet STA
Riser Base
Ling Shaker
TEAM Slip Table
System Base
Spacer Block/Structure
System Base Extension
6Frequency Strength Verification Testing
STA Sine Sweep Test Z Configuration
VCTF
Z Transition Frame
Team Spherical Coupling (Supplied by NASA/JS)
Cryomagnet STA
Riser Base
Ling Shaker (Supplied by INFN)
TEAM Slip Table
System Base
Spacer Block/Structure
System Base Extension
7Frequency Strength Verification Testing
- Acoustic Tests
- Cryomagnet System (ESTEC The Netherlands)
- Cryomagnet Structural Test Article (STA)
- STA Vacuum Case
- STA Cryosystem including STA SFHe Tank,
- Cold Mass Replica
- The Cryomagnet STA will be tested to launch
acoustic levels to determine if there is any
o-ring seal leakage. - Test levels will be payload bay acoustic
environment as defined per NSTS-21000-IDD-ISS. - Test must be performed with cryosystem at room
temperature and vacuum in order to measure leaks
in the o-ring seals. - Strap preload increased to simulate thermal load
of Cold Mass Replica.
8Frequency Strength Verification Testing
Acoustic Test Layout
Cryomagnet STA
Support Stands
Acoustic Test Stand (Supplied by ESTEC)
9Frequency Strength Verification Testing
- Modal Tests
- Full Assembly Modal Test (IABG)
- Orbiter Configuration simulated with modified
test stands from AMS-01 on STS-91 or IABG Shuttle
Payload Simulator. - Test will be performed with the system at
cryogenic temperatures. - Will include enough instrumentation to
dynamically correlate linear response of the FEM. - Instrumentation Test Equipment
- 400-500 accelerometers
- TBD small 0.25g actuators
- Smart Hammer
10Frequency Strength Verification Testing
Modal Test Layout
Setup shown for JSC Structures Test Lab
11Static Verification Testing
- Full Assembly Static Test (IABG)
- Orbiter Configuration simulated with modified
test stands from AMS-01 on STS-91 or IABG Shuttle
Payload Simulator. - Test to 1.1 x limit load.
- Will include enough instrumentation to statically
correlate FEM to 1.4 x limit load. - Instrumentation Test Equipment
- 250-300 strain gages
- 2-3 large actuators
- 50,000-90,000 lbf (220-400 kN)
- Maximum stroke of 4-5 inches
12Static Verification Testing
Full Assembly Static Test
Setup shown for JSC Structures Test Lab
13Forward Work
- Cryomagnet System Sine Sweep Test
- Meeting April 18th at INFN in Italy
- Clarify information based on current design.
- Full Assembly Static/Modal Test
- Meeting April 20th at IABG in Germany
- General information meeting.