ASCOPE NATURAL GAS for VEHICLE NGV TASK FORCE - PowerPoint PPT Presentation

1 / 15
About This Presentation
Title:

ASCOPE NATURAL GAS for VEHICLE NGV TASK FORCE

Description:

ANTF WAS FORMED ON 25 SEPTEMBER 2002 WITH THE OBJECTIVE TO ... ENGINE TIMING MODIFIER / ENGINE MANAGEMENT SYSTEM - NGV MIXER / INJECTOR - FUEL SELECTOR SWITCH ... – PowerPoint PPT presentation

Number of Views:32
Avg rating:3.0/5.0
Slides: 16
Provided by: mkha5
Category:

less

Transcript and Presenter's Notes

Title: ASCOPE NATURAL GAS for VEHICLE NGV TASK FORCE


1
ASCOPE NATURAL GAS for VEHICLE (NGV)TASK FORCE
REPORT OF ASCOPE NGV TASK FORCE (ANTF)
for the 10th ASCOPE TECHNOLOGY SERVICES
COMMITTEE (TSC) MEETING May 13th,
2004) by MOHD GHAZALI DAUD CHAIRMAN, ANTF
  • May 13th, 2004
  • PAN PACIFIC HOTEL
  • SINGAPORE

2
OBJECTIVE OF PRESENTATION
  • 1) TO UPDATE THE PROGRESS OF ACTIVITIES
    CARRIED OUT BY ANTF, AND
  • 2) TO RECOMMEND THE IMPLEMENTATION OF THE ASEAN
    RECOMMENDED PRACTICE (ARP) for NGV VEHICLES
    REFUELING STATION.

3
Presentation Outline
1
  • BACKGROUND
  • PROGRESS
  • OVERVIEW OF BOTH ARPs
  • RECOMMENDATION WAY FORWARD

2
3
4
4
1
1
Background
Background
5
BACKGROUND
  • ANTF WAS FORMED ON 25 SEPTEMBER 2002 WITH THE
    OBJECTIVE TO ENHANCE PROMOTE NGV BUSINESS
    EXPANSION THROUGH THE HARMONISATION
    STANDARDISATION OF NGV CODES, PRACTICES AND
    REGULATIONS IN THE ASEAN REGION. NGV CODES
    PRACTICES ON REFUELING STATIONS VEHICLES WERE
    IDENTIFIED TO BE HARMONISED
  • TWO EXPERT WORKING GROUPS (EWG) WERE FORMED TO
    LOOK INTO THE HARMONISATION OF THESE TWO
    AREAS.

6
ANTF EWGs OPERATING STRUCTURE
ASCOPE NGV TASK FORCE (ANTF) CHAIRMAN PETRONAS,
MALAYSIA
EXPERT WORKING GROUP (VEHICLES) EWG CHAIRMAN
PTT, PLC, THAILAND ALT CHAIRMAN PNOC,PHILIPPINES

EXPERT WORKING GROUP (REFUELING STATION) EWG
CHAIRMAN PETRONAS, MALAYSIA ALT CHAIRMAN SPC,
SINGAPORE
7
2
2
Progress
Progress
8
WORK PLAN STATUS WAY FORWARD
C Completed
9
3
3
Overview of both ARPs
Overview of both ARPs
10
OVERVIEW OF ARP for NGV VEHICLES
  • ARP for NGV VEHICLESPart I Components
  • - RECOMMENDED PRACTICE
  • - GENERAL
  • - NGV CYLINDERS
  • - NGV FILLING RECEPTACLE
  • - PRESSURE REGULATOR
  • - MASTER SHUT OFF VALVE
  • - GAS SOLENOID VALVE
  • - PETROL SOLENOID VALVE
  • - HIGH PRESSURE PIPING / TUBING / FITTING
  • - ENGINE TIMING MODIFIER / ENGINE MANAGEMENT
    SYSTEM
  • - NGV MIXER / INJECTOR
  • - FUEL SELECTOR SWITCH
  • - FUEL INDICATOR / GAUGE
  • Part 2 Installations
  • - RECOMMENDED PRACTICE
  • - GENERAL
  • - CYLINDER CLAMPS
  • - IDENTIFICATION

11
OVERVIEW OF ARP for NGV REFUELING STATIONS
  • B. ARP for NGV REFUELING STATIONS
  • - RECOMMENDED PRACTICE
  • - REFUELING CONNECTOR
  • - BREAKAWAY COUPLING
  • - REFUELING HOSE ELECTRICAL CONDUCTIVITY
  • - EMERGENCY SHUTDOWN DEVICE (ESD)
  • - PRESSURE RELIEF DEVICES (PRD)
  • - VENTING POINT
  • - GAS DETECTOR
  • - SAFETY DISTANCES
  • - FIREMEN SAFETY SWITCH
  • - MASTER SHUT OFF VALVE
  • - FLEXIBLE HOSE ASSEMBLY
  • - RIGID PIPING
  • - SAFETY MANAGEMENT SYSTEM (STATIONS CNG
    TRANSPORTING VEHICLES)
  • - FIRE PROTECTION
  • - OPERATION SAFETY FOR CNG TRAILERS
  • - HSE OPERATION AUDIT / INSPECTION OF CNG
    STATIONS

12
4
4
Recommendation Way Forward
Recommendation Way Forward
13
RECOMMENDATION
  • TO IMPLEMENT THE ASEAN RECOMMENDED PRACTICE (ARP)
    for NGV VEHICLES REFUELING STATION BY MEMBER
    COUNTRIES

14
WAY FORWARD
  • TO MONITOR THE IMPLEMENTATION PROGRESS,
  • TO REVIEW THE ARPs IN TWO YEARS TIME.

15
Thank You
Thank You
Write a Comment
User Comments (0)
About PowerShow.com