Command and Control (C2) Team GOTChA Chart - PowerPoint PPT Presentation

1 / 1
About This Presentation
Title:

Command and Control (C2) Team GOTChA Chart

Description:

Command and Control (C2) Team GOTChA Chart. Goals. Provide an interface between Roboflag software and MVWT hardware ... Modify code from MVWT I to work with ... – PowerPoint PPT presentation

Number of Views:21
Avg rating:3.0/5.0
Slides: 2
Provided by: Ling75
Category:

less

Transcript and Presenter's Notes

Title: Command and Control (C2) Team GOTChA Chart


1
Command and Control (C2) Team GOTChA Chart
Goals
Technical Challenges
  • Provide an interface between Roboflag
    software and MVWT hardware
  • Provide a non-Roboflag interface for user
    applications and the MVWT hardware
  • Not familiar with Roboflag arbiter software,
    MVWT I C2 software
  • Possible communication constraints from Vehicle
    Team
  • Dont know format of positioning system
  • Complexity of CC API, inexperience in writing
    APIs
  • Need fast enough software to work with 12-24
    vehicles.

Objectives
  • Maintain current interface code for MVWT I.
    (1.1, 6/27)
  • Modify code from MVWT I to work with MVWT II
    (1.2, 7/4)
  • Provide CC API for user applications to handle
    up to 12 vehicles (MVWT lab) or 24 vehicles
    (roof), running at 10 Hz (2, 8/3)
  • Graphical support (data logging visualization)
    (3, 8/15)
  • A new simple generic GUI (3, 8/15)

Approaches
  • Study and do a live run of the current Roboflag
    code and current testbed code.
  • Weekly meetings with both teams to determine
    proper interfaces.
  • Detailed block diagrams, work breakdowns,
    schedules for API, keep documentation in Doxygen.
Write a Comment
User Comments (0)
About PowerShow.com