LAT Horizontally - PowerPoint PPT Presentation

1 / 6
About This Presentation
Title:

LAT Horizontally

Description:

This is how we will run at NRL! Important to understand what the data ... The LAT was really flipped on its side: Z-direction of reconstructed track. Horizontal ... – PowerPoint PPT presentation

Number of Views:23
Avg rating:3.0/5.0
Slides: 7
Provided by: wwwglastS
Category:

less

Transcript and Presenter's Notes

Title: LAT Horizontally


1
(No Transcript)
2
LAT Horizontally
  • First End2End runs are here
  • LAT Horizontally
  • This is how we will run at NRL!
  • Important to understand what the data looks like
    before we ship the LAT!
  • Half the runs with the VDG in parasitic mode
  • No change in detector occupancy seen!
  • Nor was it expected!
  • Photon rate lt1 Hz in the LAT
  • Run numbers
  • All runs
  • 077002680 - 07002682
  • 077002685 - 077002714
  • 077002716 - 077002736
  • With VDG on
  • 077002704 - 077002730
  • Trigger rate
  • About 290 Hz vs 520 Hz in the vertical position
  • No periodic trigger yet!
  • Cal configuration (thresholds)

3
You Don't Believe Me?
  • The LAT was really flipped on its side

Z-direction of reconstructed track
Last Saturday!
Horizontal
Usually we see ....
Vertical
4
LAT Horizontally As Seen In The CAL
Average number of xtals hit in the CAL
Horizontal
Vertical
5
LAT Vertical
  • LAT 70x preliminary runs
  • New default run type
  • 077002485 - 077002496
  • 077002503 - 077002509
  • 077002511 077002515
  • LAT 71x preliminary runs
  • New 'B10' i.e. Muon gain and 4-range readout of
    some trigger engines
  • 077002457 - 077002465
  • 077002497 077002502
  • Hardware configuration
  • 'x' in 70x and 71x represents which parts of the
    LAT that are on'
  • Which EPUs, primary or redundant GASU etc
  • Will post a list of the different hardware
    configurations on the IA page
  • But you shouldn't worry about which EPU processed
    your event!
  • Cal configuration (thresholds)
  • Updated from January
  • No more hot LACs!
  • In the runs database
  • Both of these configurations appear as 'intSeApp'
    (Script name) and have no End2End ID.

6
LAT Vertical End2End Runs
  • End2End runs
  • Starting on Monday!
  • Will run 12 nights
  • Plan is for a total of 48h of data
  • Run length changed
  • To maximize efficiency
  • 30 minute runs
  • 1M events/run
  • File size estimates
  • Merit ntuple 450 MB
  • SVAC ntuple 1.7 GB
  • Digi 600 MB
  • CalTuple 375 MB
  • Recon 9 GB
  • We will process the data as it comes in.
  • Will keep an updated list of 'Good' runs on the
    web.

Analysis tasks See Eduardo's talk!
Write a Comment
User Comments (0)
About PowerShow.com