CXC Managers Status Report
  • Chandra User Committee Meeting
  • Roger J. Brissenden
  • 25 June 2002

2
Program Level Status
  • Spacecraft continues to perform superbly and
    operations continue to be routine. No significant
    spacecraft hardware problems or safe modes have
    occurred since last report.
  • Flight software patch to mitigate EPHIN hardware
    failure flag glitch running SCS 107.
  • 827 Cycle 4 proposals (817 GO, 10 GTO) submitted
    by deadline of 3/15/02. Peer Review held on
    schedule June 18-20.
  • Plan agreed to with MSFC and HQ on adding
    resources in the Ed/Outreach area to provide
    additional emphasis on SSUs.
  • CXC Quarterly review 4/23/02. No major actions
    resulted from the review. MSFC Independent Annual
    Review to be held 9/5/02.
  • Contract change in work to direct SAO to perform
    call for proposals in place of NRA similar to
    HST model.
  • CXC Contract extension proposal for 11-months
    from 9/30/02 to 8/31/03 in final sign-off with
    MSFC.
  • MSFC is pursuing a JOFOC approach for contract
    post 8/31/03. Second 5-year budget level briefing
    given to HQ as part of POP-02.
  • No significant near-team budget or staffing
    issues. Out-year profile in work with HQ.

3
Items from January 02 CUC
  • Occasionally a few datasets are delivered well
    beyond the mean lag of 7 days. We suggest that
    each OBSID has a built-in alarm so that the
    appropriate scientists are informed when an OBSID
    has been unduly delayed.
  • The archive group has installed a script which
    checks the automated processing (AP) status for
    observations which have been in the queue for a
    week or more. The duty scientist is notified of
    all such observations. In addition DS has
    implemented monthly manual checks of the AP
    status tables for observations which have been
    received but for which processing has not
    completed.
  • We recommend that more channels be opened by
    which either the Director or the CXC Outreach
    office can learn of potentially interesting
    results. Possibilities include charging CUC
    members to take some responsibility for
    identifying potentially appropriate science
    results and sensitizing PIs of successful large
    proposals of this issue.
  • The CXC has reached agreement on a plan with
    MSFC and HQ to increase the resources in the
    Education and Public Outreach area. An important
    task for the new resources will be to address
    this issue.

4
Operations
  • Nominal Spring 2002 eclipse season.
  • Patch up-linked to increase glitch counters and
    mitigate EPHIN hardware failure glitch counter
    trips of SCS 107 (second occurrence on 4/2/02
    however EPHIN hardware is nominal and cause
    traced to subtle timing condition).
  • Successful test of bright earth constraint
    limitation. Expected to lead to reduction of the
    20 degree constraint yielding more flexible
    scheduling.
  • 6 executions of SCS 107 due to high solar
    activity, 1 assessed as due to EPHIN hardware
    failure glitch.
  • No ACIS CTI degradation above expectations.
  • Anomalies
  • None.
  • Hosted a number of visits or discussions with
    other mission teams
  • NGST, SIRTF, Kepler, SIM, HST (July).

5
Operations
  • Load interrupt TOOs
  • Date Target Request
  • 3/3/02 NGC 4388 1 day
  • 3/11/02 RX J170930.2-2639 3 days
  • 3/12/02 SN2002B0 3 days
  • 3/28/02 GRB020321 3 days
  • 4/5/02 GRB020405 1 day
  • 4/5/02 XTE J1751-305 3 day
  • 5/10/02 XTE J0929-314 3 days
  • 6/3/02 GRB020531 3 day
  • Operations Ground System Updates
  • Date Version Change
  • 2/27/02 ONLS 3.8.2 New front end processor file
    interface
  • 5/2/02 OFLS 9.2B Major update of momentum
    management
  • 5/2/02 GRETA 1.2.2 Plot bug fix
  • 6/12/02 OFLS 9.3 Interface to AGASC 1.5 (starcat
    update)

6
MUPS Fuel Usage
7
MUPS Warm Start Count
8
Scheduled Observing Efficiency
9
Cumulative Observations for NRA-3
10
Data Systems
  • Data processing
  • Average time from observation to data delivery
    has been maintained at approximately a week
  • Data System Software Releases (major)
  • Date Release Content includes
  • 2/6/02 DS 6.6 NRA4 Budget software
  • WebChaSeR fixes, MTA alerts
  • 3/22/02 DS 6.7 New SUN cc compiler
  • SI mode, data base and HRC processing updates
  • 6/14/02 DS 6.8 Solaris 8 port of data system.

11
Data Delivery Effectiveness
12