Title: TOF (Time of Flight)


1
TOF (Time of Flight)
  • Extraction of a 24 GeV/c proton bunches from PS
    onto lead target installed in the TT2 tunnel. The
    neutrons produced by spallation will be canalised
    to an experimental area located 200 m downstream
    throughout a vacuum pipe making use of the
    existing T2A tunnel about 7 m below the ISR tunnel

2
ST services
  • Civil Engineering
  • construction of a shaft linking the ISR and TT2A
    tunnel
  • construction of a pool in the experimental area
  • Cooling and Ventillation
  • target cooling (65 deg. at the surface)
  • cooling and ventillation
  • demineralised water cooling for target and
    mangnets
  • dismantling of existing ducts in the tunnel
  • new ventillation, a/c of the control room.
  • Access Control
  • installation of the access control (primary and
    secondary zones)
  • installation of the interlock system

3
ST services
  • Electricity
  • AC cabling of 5 power converters
  • minor general services
  • DC cabling
  • Heavy handling
  • dismantling and rebuilding of a 5 metre shielding
  • removal of lead-glass block in TT2A
  • installation of support blocks for tube
  • retreieval of existing blocks around the CERN
    site

4
ST services - estimations
  • Electricity
  • AC - 70kCHF
  • DC - ?
  • Heavy handling - 80 kCHF
  • Civil Engineering - 160 kCHF
  • Cooling and Ventilation
  • general - 92kCHF
  • target - 55kCHF
  • Access Control - 195 kCHF

5
Project Organisation-Theory
Client E. Radermacher
Client deputy P. Cennini
TOF Planning J. Monteiro
Other clients
ST Coord. G. Kowalik
CV J. Kuhnl-Kinel
CV D. Gasser
CE M. Poehler
AA E. Cennini
EL J. Gascon
EL M. Gaidon
6
Project Organisation-Practice
Client E. Radermacher
Client deputy P. Cennini
TOF Planning J. Monteiro
Other clients
ST Coord. G. Kowalik
CV J. Kuhnl-Kinel
CV D. Gasser
CE M. Poehler
SL Coord R. Magnin
AA E. Cennini
EL J. Gascon
EL M. Gaidon