Belkomur Project History
  • In the middle of the 1930s a railway
    construction began in the planned Belkomur
    location. In 1944 the railway Kotlas-Vorkuta
    connected Pechora Coal Basin and Cherepovets
    Metallurgical Works. In 1953-1954 the railway
    construction in the Russian Polar Region was
    stopped.

3
(No Transcript)
4
  • In 1995 a large-scale meridional project was
    proposed. The aim of the project was to link the
    cities of Arkhangelsk, Syktyvkar, Kudymkar and
    Perm by means of a railway called Belkomur.
  • The project design was based upon the General
    Scheme of Railways Development in Russian
    European North.

5
Railway network development in the Urals and
Russian European North
6
The project operator is JSC Interregional Company
Belkomur
Public share in the capital is 97
7
In early 1998 the company Belkomur started
construction of the northern part of the railway
simultaneously from both directions.
8
Construction of the bridge over the r. Vashka,
Udorsky District, the Republic of Komi
9
The Idea of Belkomur Project
  • The project implies a construction of a new
    aligning railway 1252 km long, including a new
    construction of 795 km, the rest is
    reconstruction and modernizing of the existing
    lines.

10
Belkomur consists of two parts Northern and
Southern
11
Belkomur consists of two parts Northern and
Southern
12
The new railway is of strategic importance for
Russia since it will provide a direct connection
of the Urals and the Republic of Komi to the
ice-free ports in Arkhangelsk, Murmansk and
Northern Europe.
13
Belkomur Project Objectives
  • Railway network development in Russian European
    North
  • Infrastructural dead-ends liquidation
  • Reduction of transportation distances
  • Including idle territories into economic
    activities
  • Railway transportation cost savings

14
Project Implementation Stages
  • 1st stage Northern Link construction of
    Karpogory-Vendinga rail way
  • 1st order construction of
    Karpogory-Vendinga rail way by start-up complex
  • 2nd order reaching full capacity of the
    rail way Karpogory-Vendinga

15
Project Implementation Stages
  • 2nd stage Southern Link construction of
    Syktyvkar-Perm rail way1st order construction
    of Syktyvkar-Perm rail way2nd order reaching
    full capacity of the rail way Syktyvkar-Perm

16
Integrated program for industrial and
infrastructural development of the Republic of
Komi, Perm Region and Arkhangelsk Region
17
(No Transcript)
18
General financial and economic details General financial and economic details General financial and economic details
Total amount of investment RUR bln. 350
RF Investment Fund assets/private investors assets RUR bln. 75/275
Gross growth in industrial production RUR bln. per year 90
More jobs Number 25 000
Projects payback period
private investment / RF Investments Fund Years 3-15 / 6.5
Revenues to all budgets RUR bln. per year 25
IRR (internal rate of return) 27
19
Brief description of the project participantsThe
Republic of Komi
  • About RUR 110 bln. of total investments till
    2012.
  • 23 mln. tons of cargo flow per annum (2006)
  • Over RUR 20 bln. industrial output growth
    by 2010-2012.
  • 40 - 50 cargo flow increase by 2010-2012.
  • Projects included in General Scheme (2007)
  • Yarega Mining and Chemical Plant
    construction
  • Vorkuta project
  • Bauxite and Alumina Plant construction
  • Step Project
  • Udora and Troitsko-Pechorsk Pulp-And-Paper
    mills projects

20
Perm Region Bereznikovo-Solikamsk Industrial Hub
  • RUR 120 bln. of total investments till 2012.
  • Over RUR 20 bln. industrial output growth
    by 2010-2012.
  • 30 40 cargo flow increase by
    2010-2012.Projects included in the Complex
    Program (2007)
  • JSC Uralkaliy project
  • JSC Silvinit project
  • JSC Solikamskburprom project
  • LLC Soda-Chlorat project
  • JSC Bereznikovsky Sodium Plant project

21
Arkhangelsk Region
  • Deep-Water Port
  • 45 mln. tons of annual cargo turnover
  • RUR 45 bln. of total public and private
    investments
  • Over 9,000 jobs
  • Servicing ships up to 70,000 tons
    dead-weight
  • 55 km rail way included in the Rail Ways
    Development Strategy till 2030

22
Projected cargo flows
23
(No Transcript)
24
Construction of the new railway Belkomur within
Eurasian Transport Corridor
25
Construction of the new railway Solikamsk Gainy
Syktyvkar Arkhangelsk within transport
corridor North East West (NEW)
26
The major interregional projects within Russian
part of the Northern Transport Corridor
  • Karpogory-Vendinga-Syktyvkar-Kudymkar-Perm
  • railway
  • Ledmozero-Kochkoma railway
  • Kotlas motor-road bridge
  • Road transport communication within roadway
    networks in the Republic of Karelia and
    Arkhangelsk Region
  • Road transport communication within roadway
    networks in Arkhangelsk Region and the Republic
    of Komi

27
A new railway Solikamsk Gainy Syktyvkar
Karpogory Arkhangelsk (Belkomur)
  • Total railway length 1252 km
  • New construction 795 km
  • RUR 75 bln. of total investments