Title: Polarized 3He ion source development for RHIC.
1Polarized 3He ion source development for RHIC.
A.Zelenski. J.Alessi, E.Beebe, A.Pikin, A.Kponou,
D.Steski
- Check the Bjorken Spin Sum Rule (the difference
between the 1st moments of the proton and neutron
spin structure function). Violation of that
would be a very big deal. If we find the rule to
be CONFIRMED, i.e. no violations, then these
evaluation will give the BEST value of the strong
coupling constantAlpha-S and its running.
A.Deshpande - Polarized 3He ions can be accelerated in RHIC
with the present siberian snakes. - Electron Beam Ion Source is being constructed at
CAD.
2EBIS ionizer for polarized 3He gas .
He-3 metastability-exchange polarized cell P -
80-90.
2.51011 He/pulse
He(2S)? He(1S)
RFQ
EBIS-ionizer, B 50 kG
Pumping laser 1083 nm.
He-transfer line. Valve. 501011 , 3He /pulse.
3EBIS ionizer for polarized 3He gas.
- Polarized 3He gas is produced by a metastability
exchange technique. P 70-80 (pressure 1
torr). - 3He gas is injected in the EBIS ionizer. Pulsed
valve? - The ionization in EBIS is produced in a 50 kG
field. - This field will greatly suppress the
depolarization in the intermediate He single
charge state, Bc(He) 3.1 kG - The charge ratio He/He gtgt 1.
- The number of He ions is limited to maximum
charge which can be confined in EBIS (about 2.5
1011 of 3He/store). - It is sufficient to obtain 1011 He/bunch in
RHIC.
4Electron Beam Ion Source at RHIC
Acceleration Tube
What intensity is expected? Capacity will be
1012 charges/pulse ? 2-3 x 1011 3He ions
per pulse ?
5EBIS Preinjector Layout in lower equipment bay of
200 MeV Linac
Polarimeter
17 keV/u 300 keV/u 2 MeV/u
100 MHz
Ion He - U
Q/m 1/6
Current gt 1.5 emA (for 1 turn inj)
Pulse Length 10 ?s
Rep. Rate 5 Hz
Time to switch species 1 second
6SUMMARY
- Expected Results.
- Building of the He 3 polarizing setup.
- Study the limitation on the maximum attainable
nuclear polarization in the metastability-exchange
technique. - Study the possible depolarization effects during
polarized 3He gas injection to EBIS and
multi-step ionization process. - 3He beam polarimeter development for
polarization measurements and optimization. - Requested budget 545 k/ 3 years (2 years
postdoc is included).