Title: Chelmsford Cathedral case study


1
Chelmsford Cathedral case study
  • Cathedrals and Climate Change
  • 2nd November 2009
  • Daniel Kenning CEng CEnv
  • Principal Environmental Consultant
  • Harrison Group Environmental

2
Harrison Group Environmental
  • Energy services
  • energy efficiency and renewables
  • Thermal modelling
  • SAP, EPC
  • Travel planning
  • Ecology services
  • Habitat surveys
  • Bats
  • Habitat creation and enhancement
  • Work with local wildlife trusts
  • Geotechnology, site investigation

3
Driver 1 Carbon Dioxide CO2
4
Driver 2 Energy Insecurity
Supply ?
5
Phased review at Chelmsford
  • 4 phases
  • Chapter House
  • Cathedral and Churchyard
  • Cathedral Centre
  • Residences
  • 7 properties
  • On-site and off-site

6
Review Process
  • Review of bills
  • Site survey
  • Energy
  • Water
  • Waste
  • Transport

7
(No Transcript)
8
(No Transcript)
9
(No Transcript)
10
(No Transcript)
11
(No Transcript)
12
Survey findings
13
(No Transcript)
14
(No Transcript)
15
(No Transcript)
16
Review Process - Analysis
  • Total electricity used 2005-2006
  • 43,593 kWh/yr
  • Measured floor area
  • Approx. 500 m2
  • Baseline demand and CO2 emissions
  • 87 kWh/m2/yr, 36.7 kgCO2/m2/yr
  • Comparison with industry benchmarks
  • Community centres 147 kWh/m2/yr
  • Further education classrooms 181 kWh/m2/yr
  • Social clubs 200 kWh/m2/yr
  • Step-by-step forecast for proposed measures

17
Review Process - Recommendations
  • Low cost
  • Investment
  • Strategic long term

18
Low cost measures
  • Simple monitoring and control strategy
  • Energy-efficient and water-efficient equipment in
    new kitchen
  • Design-in facilities for recycling
  • Complete change to energy efficient lighting
  • Travel plan for staff and visitors
  • Energy awareness programme
  • Hypothecation of savings for investments

19
Example - Monitoring and Targeting
  • Data collection
  • Electricity
  • Water
  • Waste
  • Travel
  • Data analysis
  • Reporting
  • Action

20
Investment measures
  • Central heating with radiators and gas boiler
  • Effective controls
  • Effective insulation
  • Hot water storage compatible with future solar
    system
  • Designed to allow flexibility in future type of
    boiler
  • Regenerative braking for lift
  • Internal insulation on walls
  • Replacement water efficient appliances in toilets

21
Example Internal Insulation
100 mm glass fibre
Cold Bridge
40 mm polystyrene
22
Strategic long term measures
  • Electricity from zero carbon source
  • Solar thermal system for hot water in summer

23
Possible CO2 emissions reduction
Target for UK
24
Next steps
  • Modelling of the benefits of
  • New insulation
  • New heating system
  • Cost analysis
  • Implementation
  • Monitoring
  • Next three phases of the programme

25
Modelling and Energy Profile
26
Summary
  • Carbon and Security
  • Energy, water, waste, transport
  • A strategic approach makes it feasible
  • We would be pleased to help you too.
  • Daniel Kenning
  • daniel_at_harrisongroupuk.com
  • 020 7537 9233