Undulator Schedule Update - PowerPoint PPT Presentation

About This Presentation
Title:

Undulator Schedule Update

Description:

New responsibilities in Controls ... Checkout system checkout sans racks. D. Schultz ... Critical Path. About a month ahead of schedule. Lets keep it that way! ... – PowerPoint PPT presentation

Number of Views:30
Avg rating:3.0/5.0
Slides: 14
Provided by: jbfo4
Category:

less

Transcript and Presenter's Notes

Title: Undulator Schedule Update


1
Undulator Schedule Update
David Schultz
  • People
  • Status
  • Project schedule

2
New responsibilities in Controls
  • Enzo Carrone has joined LCLS and the Controls
    Department as the Deputy Controls Head for LCLS.

3
BTH looking east
4
Backfill operation over Beam Dump and FEE
5
Electron Beam Dump
6
Finishing the Final Floor Slab in X-ray Tunnel
7
Installing re-bar in the Far Experimental Hall
8
LTU stand installation
4/21/08
9
Undulator girder assembled at SLAC
10
LCLS installation and commissioning time-line
First Light in FEE
FEE/NEH Install
First Light in FEH
PPS Cert. LTU/Dump
CD-4 (7/31/2010)
X-Rays in NEH
FEH Hutch BO
LTU/Und/Dump Install
FEH Install
PEP-II run ends
now
J
F
M
A
M
J
J
A
S
D
J
F
M
A
M
J
J
A
S
O
N
D
J
F
M
A
M
J
J
O
N
A
A
M
2008 2009
2010
Down
PPS
LTU/Und Comm.
Re-commission Inj/BC2 to SL2
NEH Operations/ Commissioning
Linac/BC2 Commissioning
FEE Comm.
April 18, 2008
11
Undulator girder assembly schedule
Near the Project critical path
P3 dates
Now in progress
RFI
We are 1 month ahead of schedule. ANL component
delivery is now sufficient to support assembly.
12
Undulator Schedule
  • Near the Project critical path
  • Assemble Grider 10 8/11/08 We are 1 month
  • Assemble Grider 20 9/23/08 ahead of this
  • Assemble Grider 30 11/17/08 schedule.
  • Racks due 6/15
  • Install
  • Connect power
  • Terminate cable plant 1/15 (P3) Need some way to
    do
  • Checkout system checkout sans racks.

13
Summary
  • Installation has begun in the LTU.
  • Installation in the Undulator and Dump areas
    waits for area co-occupancy.
  • Installation of pedestals begins next week in
    U-Hall.
  • Starting with drilling the floor.
  • Girder assembly is just about underway. Critical
    Path.
  • About a month ahead of schedule
  • Lets keep it that way!
  • Need BFWs and BPMs at a rapid pace.
  • Rack connection will lag. Need to check support
    movers early, need to check racks early.