What is Field Testing Why
  • The main reason for Field Testing is to verify
    the compatibility of the mobile terminal against
    different networks
  • Field testing is carried out in 'live' commercial
    networks because
  • Systematic lab tests cannot simulate all CDMA
    network configurations.
  • Network functionality varies when comparing
    networks of different vendors.
  • Although the network vendor may be the same,
    operators have possibilities to adjust network
    parameters in many ways.
  • To provide a quality product by ensuring
  • its complete interoperability with different
    infrastructures
  • its robustness in good and adverse field
    conditions

2
Field Testing Goals
  • Field Testing should fulfill the following
    goals
  • To discover such problems that can't be
    found out in systematic laboratory
  • testing
  • To confirm that all features of the phone
    will work without problems in all major
  • cellular networks
  • To ensure that the phone works according
    to end user expectations, mainly
  • based on user manual
  • To ensure that the quality of the product
    will satisfy typical end-user and the
  • quality will be better than in the
    competitors phones.

3
Test Categories
  • Field test cases are aimed to cover all phone
    features
  • Test cases are usually divided into following
    groups
  • CDMA specific idle activity
  • Voice call handling and quality
  • Short Message Service (SMS)
  • Supplementary Services (SS)
  • Data
  • Internet / WAP
  • Tests are also divided according to test
    environment
  • Stationary tests (good signaling conditions,
    verifies signaling interoperability)
  • Tests when moving (Handovers HO, Location
    Updates LU, cell re-selection...)
  • Tests in weak field (searching for service,
    call crashing, call success rates...)

4
Field Test Levels
  • Level 1 Lab Testing
  • Level 2 DEBUG and Feature verification Testing
  • Level 3 Local Field Test Network Testing
  • Level 4 Field Testing with Different
    Infrastructures / Network

5
Field Test Levels
  • Level 1 Lab Testing
  • Objective To evaluate the protocol status of
    the SW and the minimum product performance needed
    to begin testing the product on a live network
  • Type of Testing
  • CDMA Protocol Test Rack
  • HP 8924C/E8285A Digital Parametric and Digital
    Call Processing Test
  • HP 8924C/E8285A Analog Parametric and Analog Call
    Processing Test
  • HP 8924C/E8285A Analog Parametric and Analog Call
    Processing Test
  • Mobile Originated Testing on HP8924C/E8285A TOM
  • Mobile Terminated Testing on HP8924C/E8285A TOM
  • n. Final UI and Flash and Align
  • Minimum Criteria to Pass
  • Product must pass Test n, no exceptions.
  • Product must pass all critical tests cases in
    Test 1-4

6
Field Test Levels
  • Level 2 DEBUG and Feature Verification Testing
  • Objective To verify fixed errors in the field,
    new feature implementation and perform minimal
    call statistics
  • Type of Testing
  • Feature verification will travel to different
    networks if feature is not supported in local
    network
  • Error/ Bug fix verification in local field test
    network
  • Call Origination and Termination in local field
    test network (no more than 100 calls per phone)
  • Call Maintenance in local field test network (no
    more than 5 hrs per phone)
  • Minimum Criteria to Pass
  • Product must still pass all minimum criteria for
    Field Test Level 1
  • Product should have performance at least equal to
    current products being sold

7
Field Test Levels
  • Level 3 Local Field Test Network Testing
  • Objective To evaluate the stability and
    performance of a product before taking it to
    other networks/infrastructures
  • Type of Testing
  • All test cases outlined in the Projects Field
    Test Specification
  • Call Origination and Termination in local field
    test network (min 100 calls per phone)
  • Call Origination and Termination in local field
    test network (no more than 100 calls per phone)
  • Call Maintenance in local field test network (min
    10 hrs per phone)
  • Minimum Criteria to Pass
  • Product must pass all Tests in Field Test Level 1
  • Product must have no power downs
  • Product should have performance at least equal to
    current products being sold
  • Product must pass critical test cases in Test 1
    2

8
Field Test Levels
  • Level 4 Field Testing with Different
    Infrastructures /Networks
  • Objective To evaluate product performance and
    stability versus different infrastructures,
    various network providers, and various markets
  • Type of Testing
  • All test cases outlined in the Projects Field
    Test Specification
  • Call Origination and Termination in local field
    test network (min 100 calls per phone)
  • Call Maintenance in local field test network (min
    10 hrs per phone)
  • All Features testing that is specific to a
    particular network
  • Error/bug fix verification that is specific to a
    particular network
  • Minimum Criteria to Pass
  • Product must pass all minimum criteria in Field
    Test Level 3
  • Product must pass all test cases in Test 1 2
    for all infrastructures
  • Product must pass all Features requirement for a
    particular Carrier/Customer
  • Product must perform better than current
    products being sold

9
The Field Testing Process
L 3
L 4
L 2
L 2
Preliminary Check
Preliminary Field Testing
Field Testing
Prepared for Preliminary FT
Prepared for FT
Level 1 Lab Testing
Level 2 Preliminary Field Testing
Level 3 Main Countries
Level 3 All Major Countries
Final Mobile
Level 4 Correction verification
Yes
No
Corrections
Corrections
Corrections
Correct-ions
Errors
Errors
Product Development
Errors
Error Correction/Internal Testing
Integration Testing
Regression Testing
10
Field Test Responsible
  • Field test responsible is a person who organises
    the FT activities
  • Field test responsible will do
  • Planning for
  • Resources
  • Timing (protos, accessories and SW)
  • Estimated cost calculation
  • Country selection (according network
    infrastructure, subscribers and services)
  • Tests to be executed
  • Arrangements for
  • Field test training
  • Field test resources
  • Contact persons in target countries and local
    SIM-cards
  • Information about network status, vaccination,
    visa, ata carnet, ..
  • Co-operation with other projects
  • Dedicated plan for each field test trip

11
Field Test Responsible
  • Field test responsible will do (cont)
  • Reporting for
  • test manager (status reports)
  • project (errors /usability issues / maturity
    estimations)
  • Follow up work for
  • found errors (error reproducing at office / fix
    verification)
  • error check lists
  • FT reports
  • FT plan
  • HW/SW Updates
  • local global field test database
  • network news