Title: Plug-In Migration


1
Plug-In Migration A Better Approach to DCS
System Replacement
  • Stephen Golemme, Sr Technical Consultant,
    Invensys Process Systems

2
When to Migrate?
  • Threat of unscheduled downtime
  • Emerging or new business needs are impossible to
    support without new system
  • No longer cost effective to support old system(s)
  • Old system(s) cannot support new technology
  • Old system is declared end-of-life

3
Issues Vendors Face
  • Keep pace with Technology - Need for a next
    generation system every 10 - 15 years
  • Obsolescence of parts
  • Costly to maintain and support
  • Need for systems that will do more
  • Reluctance to compromise new system design to
    accommodate the past
  • Next generation system products have a different
    shape and size

4
Popular Migration Solutions
  • The Bulldoze demolish and start again
  • Cable Solutions gut the original cabinet, cable
    over to a rack of new equipment, adjust for I/O
    mapping
  • Transition Solutions Replace the HMI, then
    controllers, then finally the I/O modules
  • Gateways integration solution to share data
    between and old system and a new system

5
ARC Analysts Pros Cons
Migration Strategy Migration Strategy Benefits Challenges
Bulldoze - Rip out and start again (Originally only game in town) Most comprehensive way to migrate to a new system Costly, downtime issues Most impractical solution
Cable Solutions - Gut the original cabinet, cable over to a rack of new equipment, adjust for I/O re-mapping A quick solution for system interoperability. Low risk Fails to address end of life and maintenance issues, temporary solution, can be costly
Transition Solutions - Replace the HMI, then controllers , then finally the I/O modules. Small investment upfront, incremental change Much more costly over time almost double initial quote
Gateways - Integration solution to share data between and old system and a new system Effective solution for migrating to different platform from different supplier Increased footprint, time to install, I/O mapping issues
I/O Replacement - Plug-In to your existing legacy system racks. Very cost effective solution with reduced downtime, easily reversed if necessary Offered by small number of suppliers
6
Designed to minimize cost, risk downtime
  • I/O modules are manufactured to Plug-In to your
    existing legacy system racks.
  • Reuse existing cabinets, racks, term. assemblies
    and field wiring
  • No I/O mapping issues - exact match
  • Minimum process downtime
  • 100 new system (workstations, controllers and
    I/O modules)
  • Full system warranty

7
Plug-In DCS I/O Modules
  • One for one I/O board replacement
  • Meets or exceeds I/O capacity of legacy cards
  • Lines up exactly with I/O points
  • Manufactured using same components as traditional
    I/O modules
  • Automatic bootup on installation
  • Fully redundant I/O bus - no single point of
    failure

8
Unique Plug-In Solution
  • Step 1 pre-install new workstations
    controllers
  • Step 2 set process in steady state mode
  • Step 3 replace I/O modules attach network
    connectors
  • Step 4 loop check
  • Step 5 start up process
  • Step 6 making product saving money - day 1
    !!!

And Its Reversible !!!
9
Lowest Installed Cost
Eliminated installation rewiring costs
10
Lost Production due to downtime
11
Lowest Risk Solution
  • Site Survey audit
  • Hardware application review
  • Requirements docs, design docs, test plans,
    validation plans, implementation plans
  • Automated tools for database conversion and full
    system documentation
  • Full system FAT off-site
  • Switchover done in hours, not days or weeks
  • Non-destructive, fully reversible

Migration Centers of Expertise
12
Protect your investment
  • Vendor should assume responsibility for the
    entire system new old
  • Future upgrade paths and plans should be clearly
    identified years ahead of schedule
  • Ensure your investment is protected and you are
    supported for a lifetime!

13
A Case Study WDPF Westinghouse Migration
  • NL Hydro A Nalcor Energy Company, Holyrood,
    Newfoundland Hydro
  • Migration of a 1990s Vintage Westinghouse WDPF
    DCS
  • Informed by Vendor - no support after 2005
  • Hardware Failures becoming more frequent.
  • Island power system dictated fast, reliable
    upgrade 2 weeks!
  • Foxboro migration selected
  • Needed a cost effective, low risk migration
    solution with minimum process downtime.
  • Partner that provides ongoing service support
    locally
  • Proven experience
  • New system must be better, not just a functional
    replacement
  • Results
  • 100 new system leveraging IPS integrated
    portfolio of technology
  • Brand new DCS for 75k on 4M project
  • Minimum downtime installation commissioning
    to completion - 1 week!
  • Localized strong partnership with the IPS team
    improved troubleshooting of process problems.
  • No more end-of-life issues, with backwards
    compatibility guaranteed

14
Plug-In A Better Approach to DCS System
Replacement
  • 30 - 40 below a bulldoze solution
  • Reuse the wiring, cabinets, nests, etc things
    that dont fail
  • No I/O mapping issues
  • No interim/throwaway solutions
  • Easily reversible
  • 1 small outage (1 day) away from a new system
  • Check our references - please !!!

15
Plug-In To...
  • Foxboro Spectrum SPEC200
  • Honeywell TDC2000 TDC3000
  • Bailey NET90 INFI90
  • Fisher PROVOX S10 S20
  • Westinghouse WDPF
  • Siemens Moore APACS
  • Taylor Mod300

16
  • Thank You!

To learn more visit the Invensys booth
www.ips.invensys.com/migration