Description:

... program . (measurement and inspection results, failure information etc) ... Example: norm and criteria optimisation. Probability density curve of ... – PowerPoint PPT presentation

Number of Views:199
Avg rating:3.0/5.0
Slides: 17
Provided by: dhb2
Category:

less

Transcript and Presenter's Notes

Title: Successful implemented Condition Based Maintenance for switchgear


1
Successful implemented Condition Based
Maintenance for switchgear
Session No 1, Paper No 14
The Netherlands
  • Presenter E.R.S. Groot

2
A guided tour through the implementation
process of CBM (step by step)based on
questions and problems we dealed with
3
Where did we start?? (more then 60 different
type of switchgear)
  • Based on the selection criteria
  • Current maintenance costs
  • Current outage time for maintenance
  • Risk for maintenance induced failures
  • Population size
  • Age and expected lifetime
  • Current failure behaviour and frequency

.we started with a minimum oil breaker
4
What are critical components of this switchgear ??
  • We applied an FMECA approach and weighted each
    component
  • Failure frequency (score 0,1,2)
  • Impact of failure on energy supply (score 1,2,3)
  • Corrective costs (score 1,2,3)
  • Environmental impact (score 1,2)

5
FMECA register (screen dump)
6
The outcome of the FMECA exercise resulted in a
new optimised maintenance program ..
  • A mixture of maintenance, inspections and
    measurement activities were focused on critical
    components only

This optimised maintenance program resulted in
the first cost reduction of 29
7
How do we- control and update the new
maintenance program in the field- support the
electrician with actual normsand instructions-
guaranty the continuation of feed back of field
experience
8
Therefore we developed the Inspector software
tool
9
Field support with actual norms and instructions
10
How do we handle the increased amount of data
like
  • Measurement results
  • Inspection results
  • Maintenance information
  • Failure information

11
We developed the I-Core database
type time
analysis
12
The I-Core database for
  • storage of data (measurement and inspection
    results, failure information etc)
  • optimising norms and criteria
  • research of aging mechanisms
  • improvement and optimisation of the condition
    based maintenance program

13
Example correlation between moisture level in
oil and aging of coqolite
14
Example norm and criteria optimisation
Norm definition for velocity based on large
population measured data
Probability density curve of switching velocity
Define a maximum norm for contactpressure based
on influence on velocity
Correlation between contact pressure and
velocity
15
The outcome of the data analyses resulted in a
furtheroptimised maintenance program ..
The optimisation of both the mixture of
maintenance and measurement activities and
frequency resulted in a total cost reduction of
35
16
Conclusion
  • Good experiences with CBM
  • Still implemented it succesfully for other type
    of switchgear
  • Growing importance for condition data (not
    only as a foundation for CBM)