NPDES Inspections and The Laboratory - PowerPoint PPT Presentation

About This Presentation
Title:

NPDES Inspections and The Laboratory

Description:

5) The analytical techniques or methods used. 6) The date of and person responsible for ... Ensure the laboratory has the necessary references (Standard Methods, ... – PowerPoint PPT presentation

Number of Views:21
Avg rating:3.0/5.0
Slides: 10
Provided by: veld6
Learn more at: https://www.mi-wea.org
Category:

less

Transcript and Presenter's Notes

Title: NPDES Inspections and The Laboratory


1
NPDES Inspections and The Laboratory
  • Chris Veldkamp
  • Senior EQA-Water Bureau
  • Grand Rapids District Office

2
  • Laboratory elements that may be evaluated when
    we conduct an inspection

Sampling Test methods and analyses Laboratory
equipment Records Quality Assurance/Quality
Control
3
Components of a Laboratory Inspection
  • Sampling
  • Representative
  • Techniques
  • Proper equipment
  • Preservation

4
Components of a Laboratory Inspection
  • Test methods analyses
  • CFR 40 Part 136
  • Water/Wastewater
  • Analyses
  • Quantification Levels
  • Alternate Test Methods

Correctly
Carefully
Consistently
Proper Procedures
5
Components of a Laboratory Inspection
  • Laboratory Equipment
  • Operating
  • temperatures
  • Calibration
  • Slopes
  • Maintenance

6
Records
Components of a Laboratory Inspection
  • 1) The exact place, date, and time of measurement
  • or sampling
  • 2) The person(s) who performed the measurement
  • or sample collection
  • 3) The dates the analyses were performed
  • 4) The person(s) who performed the analyses
  • 5) The analytical techniques or methods used
  • 6) The date of and person responsible for
  • equipment calibration
  • 7) The results of all required analyses

7
Components of a Laboratory Inspection
Quality Assurance/Quality Control
  • Written procedures
  • Reliable data
  • Results generated
  • Control charts

8
Common Lab Problems
  • Test method not approved
  • Quantification levels are too high
  • Improper preservation
  • Improper calculations (e.g. averages, geometric
    mean)
  • Inadequate records
  • Transcription problems with reported data

9
Helpful Hints
  • Have a copy of the permit
  • For required test methods
  • For required quantification levels
  • For info on recordkeeping
  • Ensure the laboratory has the necessary
    references (Standard Methods, DEQ Lab Manual,
    CFR 40 Part 136)
Write a Comment
User Comments (0)
About PowerShow.com