www.eurocontrol.int/projects/eatmp/link2000 - PowerPoint PPT Presentation

1 / 12
About This Presentation
Title:

www.eurocontrol.int/projects/eatmp/link2000

Description:

Spain. FLIPCY ACL. Switzerland. ACM AMC FLIPCY. ACL DSC. Germany. ACM AMC ACL. Austria. ACL ... (Maastricht, Paris, Reims, Karlsruhe, Vienna, Zurich, Geneva, Madrid) ... – PowerPoint PPT presentation

Number of Views:26
Avg rating:3.0/5.0
Slides: 13
Provided by: AlexWa7
Category:

less

Transcript and Presenter's Notes

Title: www.eurocontrol.int/projects/eatmp/link2000


1
www.eurocontrol.int/projects/eatmp/link2000
2
LINK2000 Lifecycle Context
First phase European Implementation Completed
Pre-operational Phase Completed
Standards validated
Standardisation Validation Trials
Towards Implementation
1996
2000
2005
2007/8
Time
3
Objective of LINK 2000
  • To co-ordinate the implementation of
  • selected air ground data link services for ATC,
  • at a number of ACCs/airports,
  • with benefit driven equipage by airlines,
  • based on ATN and VDL Mode 2 (ATCAOC)
  • from 2000 to 2007/8
  • to reduce controller workload
  • with a safety benefit

4
LINK2000 Headlines
  • OPERATION DRIVEN, TECHNOLOGY ENABLED (not just a
    COM project)
  • European Implementation 2005-2008 (earlier for
    PIONEERS)
  • globally compatible, validated, air ground data
    link services for ATC
  • Infrastructure support for AOC
  • Voluntary Benefit driven equipage to start
    followed by Mandate (2008 timeframe)
  • Comms. Based on ATN and VDL Mode 2
  • Strong link to FAA Program Build 1/1A

5
LINK 2000 Characteristics
  • NO NEW CONCEPTS
  • Proof of operational concept (ODIAC, PETAL,
    EOLIA, national trials)
  • Proof of technology (PETAL IIe, ProATN, EOLIA,
    ATN trials infrastructure)
  • NO NEW STANDARDS
  • RTCA 189/Eurocae 53 (service inter-op)
  • ATN SARPS (ICAO doc. 9705)
  • AEEC Specs. 631, 637

6
Benefits
  • Capacity Gain, Delay savings en-route
  • real-time and fast-time simulations
  • workload saving converted into capacity
  • capacity converted into delay savings
  • Cost of delay defined by airlines/IATA

R/T workload? ? workload? ? capacity? ?
delay?
7
Operational Benefits
  • Equipage Capacity ATFM Delay
  • 25 3.4 -10
  • 50 8 -31
  • 75 11 -44
  • a non-quantifiable safety benefit

8
Current Implementation Plans
9
Current ATS/ATN Plans at ACCs
ACCs

Objective harmonised service deployment
FLIPCYACL
ACMAMCDSC
01
02
03
04
05
06
10
Commitment to Implement
  • LINK 2000 PSG set the following schedule
  • 06/01 "Key site identification (Maastricht,
    Paris, Reims, Karlsruhe, Vienna, Zurich,
    Geneva, Madrid)
  • 10/01 "Pioneer airline identification"
  • 11/01 "Letters of commitment
  • 01/02 "Announcement of concrete plans"

11
Conclusion
  • The Benefits are Real
  • R/T workload savings
  • Less room for error
  • Efficiency (more time to do the job)
  • With Commitment the Benefits can be obtained Soon

12
QUESTIONS
Write a Comment
User Comments (0)
About PowerShow.com