RC LACE Status Report - PowerPoint PPT Presentation

About This Presentation
Title:

RC LACE Status Report

Description:

RC LACE 27th EWGLAM Meeting 3-5 October 2005, Ljubljana. 1. Dijana Klaric. Regional LAM Co-ordination. and. Co-operation of. A, CR, CZ, H, SI, SK. RC LACE 2005 ... – PowerPoint PPT presentation

Number of Views:36
Avg rating:3.0/5.0
Slides: 26
Provided by: dijana2
Category:

less

Transcript and Presenter's Notes

Title: RC LACE Status Report


1
RC LACE 2005
Regional LAM Co-ordination and
Co-operation of A, CR, CZ, H, SI, SK
Dijana Klaric
2
RC LACE highlights2005
  • ? Operations maintenance
  • ? Networking
  • ? Research development
  • ? Plans for 2006-2007

3
Operations maintenance
  • all 6 members - individual operational
    applications
  • almost the same domains
  • mesh size (?x 12.2km - ?x 6.5 km)
  • vertical resolutions (L37 - L45)
  • 00 and 12 UTC runs per day
  • 06 and 18 UTC runs on demand
  • envelope - no envelope orography
  • dyn. adapt blending 3DVar (e-suite)
  • maintenance and porting of SW

4
Networking in 2004/2005 (Who? Why? When?)
  • AAAA settings and definitions
  • Intermediate ALADIN WP for 2005
  • Opened subjects
  • Cost/efficient of new physics
  • Interfacing internal and external
  • Data formats
  • Mobility of scientist
  • ALADIN- HIRLAM Partnership

5
A proposal for planning and supervision of the
HIRLAM-AROME-ALARO common work
Observer
Work plans
6
Scientific Plan 2004/2005
  • 4nd RC LACE Steering Committee meeting
  • Opened to no-LACE partners
  • 2004
  • Plans from year 2004 were fulfilled
  • 100 person/months
  • 2005
  • 110 person/months
  • to adjust RD to AAAA plans

7
Scientific Plantoward AAAA compatibility
  • Dynamics
  • NH ALADIN is numerical core
  • interfacing dynamics vs. physics is in focus
  • Physics
  • Fast development
  • ALARO prototype as target
  • Data Assimilation
  • more meso-scale

8
Working Group for Dynamics and Coupling
  • ?. Non-hydrostatic dynamics
  • Interative schemes
  • Choice of additional NH variables
  • Bottom boundary condition
  • Diabatism in NH
  • Vertical discretization in high resolution
  • ??. Dynamics other topics
  • Horizontal diffusion (SLHD) Documentation
    issued!
  • Radiative UBC
  • Physics/dynamics interface

9
Results from WG for Dynamics and Coupling
  • Interative scheme (overview)
  • ? 2TL SL P/C (ICI) scheme has been developed
  • ? 3TL Eulerian scheme is phased into the CY29T2
  • test with DFI (to do SHLD tests )
  • ? 3TL semi-Lagrangian part is still missing

Stability tests Alphia 2TL SL 3TL
(ICI) Eul ? t 80 sec ? t 40 sec
10
Results from WG for Dynamics and Coupling
  • Bottom Boundary Condition tests
  • ? Residual problems of ALADIN-NH dynamics on
    resolution (10-100m) - HD Chimney problem
  • ? Cure
  • To treat exactly the current BBC formulation
  • To replace spectral HD by SLHD.

2D Tests Bell shape Exact treatment vis. SLHD

11
Working Group for Physics
  • Development is not frozen
  • ? AR/AL physics development
  • ? ALARO physics
  • AROME physics

12
Working Group for Physics
  • ?. PBL cloudiness (Xu-Randall Seidl-Kann )
  • ??. Prognostic cloud water
  • ?II. Param. schemes, diagnostic tools
  • - 1D TKE prognostic
  • - radiation scheme
  • - convection scheme
  • - DDH diagnostics for ALARO and AROME
  • ?V. Externalized surface- diffusion in ISBA
  • V. Validation, case and sensitivity studies

13
Results from WG for Physics
  • PBL cloudiness development
  • Problem
  • Too strong 2m temperature diurnal cycle in winter
    anticyclonic conditions
  • Large errors in 2m temperature forecasts.
  • Convergence Xu-Randall and Seidl-Kann scheme
  • Critical Humidity Profile computation modified
  • Lower values for PBL, and ?T/ ? Z

14
PBL cloudiness
15
Results from WG for Physics
  • AROME Prototype road-map Target - Feb 2006
  • Gravity wave drag parmetrization
  • Radiation LW and SW
  • LS precipitation
  • TKE
  • Convection
  • Shallow non-precipitable convection
  • PBL cloudiness
  • Interfacing
  • Sampling Testing Porting Verification

16
Working Group for Data Assimilation
Predictability
  • ?. Methods - Algorithmic aspects
  • Multivariate humidity formulation in the B matrix
  • L-H versus NMC variances
  • Ensemble B matrix computation
  • ??. Observations
  • MSG/AMV -Atmospheric Motion Velocities data
  • AMDAR data
  • Wind profiler data and 10m wind data (SYNOP)
  • Radar data

17
Working Group for Data Assimilation
Predictability
  • LAMEPS
  • ALADIN EPS based on ARPEGE SV perturbations
  • Breeding
  • ETKF -Ensemble Transformed Kalman Filter
  • ALADIN EPS based on the ECMWF EPS system
  • EPS post-processing

18
Results from WG for Data Assimilation
  • Assimilatin of 10m wind data from SYNOP- to
    improve surface wind assimilation over land
  • - to see the impact of black-lists on
    asimilation
  • Set-up, surface wind just from SYNOPs
  • - ALADIN 3D Var Hu, LACE domain, 12km
  • - envelope orography

Results - mostly neutral - black list
QC could be replaced by screening 10m RMS orog.
vis. real alt
19
Results from WG for Data Assimilation
  • Downscalling of ECMWF EPS
  • - Meso-scale clustering approach on ECMWF EPS
  • - Several clustering parameters W 700 UV 850
    200Q850 700RT1000/500, T850,500
  • - Representatives of clusters as LBC for ALADIN
  • - Set of coupling files from ECMWF EPS /3h freq
  • - ALADIN 5 D forecast
  • - Tests on meso-scale severe weather events

20
(No Transcript)
21
EPS clusters 486072ECMWF
ALADIN
22
Plans for WG for Data Assimilation
  • LACE need for more effort on meso-scale
  • DA at MS (teams, HW, SW, data)
  • Workshop On Code Maintenance and
  • Data Assimilation
  • (14-18 November, 2005 Budapest, Hungary)
  • ALADIN Meso-scale Predictability Workshop
  • (Jan/Feb/Mar 2006, ?LACE)

23
Plans for 2005-2007 General
  • ? Relations with ALADIN 2 project
  • new MoU (Nov. 2005)- structured ALADIN
  • fresh funds for RD
  • ALADIN and LACE share the co-ordination
  • mid-term WP (2005-2007)
  • ? Active in ALADIN-HIRLAM co-operation
  • ? AROME prototype at MS (spring 2006)
  • ? Toward AROME model (2008)
  • 1st AROME WS 21-25 November 2005, Romania

24
ALADIN 2 models (AAAA)MF plans, status June
2005
25
Plans for 2005-2007(LACE)
  • 5th LSC, September 2005
  • ? Better coordination and more funds for
    predictability (proposed 4th WG)
  • ? Proposed extension of current MoU
  • (2006-2007)
  • ? RC LACE Independent Review in 2006 toward the
    new goals and structure

26
Austria Croatia Czech
Republic Hungary
Slovenia Slovakia
27
Verification project
  • ALADIN Project organized by Slovenia
  • started 2002
  • aims
  • to unify the verification on synoptic scale
  • to impose the international standards
  • to reduce duplication of work
  • to compare different ALADIN at the same domain
  • environment toward meso-scale verification
Write a Comment
User Comments (0)
About PowerShow.com