IEC TC57 WG14 - PowerPoint PPT Presentation

About This Presentation
Title:

IEC TC57 WG14

Description:

XML used to format message payloads. Messages defined using ... Part 2: Glossary. Part 3: Network Operation. Part 4: Network and ... Meter Data Sets. 15 ... – PowerPoint PPT presentation

Number of Views:38
Avg rating:3.0/5.0
Slides: 17
Provided by: alivo
Learn more at: https://cimug.ucaiug.org
Category:
Tags: iec | glossary | tc57 | wg14

less

Transcript and Presenter's Notes

Title: IEC TC57 WG14


1
IEC TC57 WG14
  • Scott Neumann
  • December 8, 2005

2
IEC TC57 WG14
  • Developing IEC 61968
  • Focus is to describe the information exchanges
    between systems (i.e. A2A and B2B) related to
    distribution operations
  • Defines integration between a variety of systems
    including network management, outage management,
    work management, asset management, SCADA,
    metering, call handling,
  • IEC 61968-1 architecture specification is
    transport independent
  • XML used to format message payloads
  • Messages defined using nouns and verbs
  • Recognizes request/reply and publish/subscribe
    messaging paradigms

3
IEC 61968
4
IEC 61968 Documents
  • Part 1 Architecture
  • Part 2 Glossary
  • Part 3 Network Operation
  • Part 4 Network and Asset Management
  • Part 5 Operational Planning and Optimization
  • Part 6 Maintenance and Construction
  • Part 7 Network Extension Planning
  • Part 8 Customer Inquiry
  • Part 9 Meter reading and Control
  • Part 10 Systems External to, but Supportive of,
    Distribution Management
  • Part 11 Common Information Model (extensions)
  • Part 12 Use Cases

5
IEC 61968
  • Extends the 61968 package of the CIM, where the
    core CIM is defined by IEC 61970-301
  • Integration defined using XML messages
  • Messages have a header and a payload
  • Header identifies a noun and a verb
  • Payload uses CIM-derived type definitions as
    described using XML Schema
  • Can be used for SOA implementations

6
CIM Packages
7
CIM Extensions
  • Modeling of electrical distribution, extending
    Wires package
  • Added 61968 package to CIM
  • Assets
  • Consumer
  • Documentation
  • Work
  • ERP_Support (leverages OAG)

8
Use Cases
9
IEC 61968 Messages
  • Message has header, with optional request, reply
    and payload sections
  • Header includes information such as a verb, noun,
    timestamps, revision, source, replyAddress,
  • Supports request/reply, publish/subscribe and
    point-to-point messaging

10
IEC 61968 Messages
11
Message Verbs
  • Request/Reply
  • CREATE
  • CHANGE (UPDATE)
  • CANCEL
  • CLOSE
  • DELETE
  • GET
  • SHOW
  • REPLY
  • Publish/Subscribe
  • CREATED
  • CHANGED (UPDATED)
  • CANCELED
  • CLOSED
  • DELETED
  • SUBSCRIBE
  • UNSUBSCRIBE

12
Example Message Nouns
  • NetworkDataSet
  • NetworkChangeSet
  • LoadDataSet
  • OperationalRestriction
  • SafetyDocument
  • SwitchingSchedule
  • OutageReport
  • TroubleTicket
  • PlannedOutage
  • OutageNotice
  • Work
  • Schedule
  • AcessPermit
  • OneCallRequest

13
Steps in Defining Messages
  • Generate XML Schema complex types from the CIM
    (once)
  • Develop use cases
  • For each use case, identify message sequences in
    terms of verbs and nouns
  • For each message define XML Schema, identifying
    necessary payload content in terms of references
    to CIM complex types

14
Customer Meter Data Sets
15
Status
  • Last meeting held October 2005 in St. Louis,
    attended by 19 persons
  • Next meeting to be held January 2006 in
    Switzerland
  • Parts 1 and 3 have been completed, but will be
    updated to reflect agreed use of XML Schema
  • Most work is currently being done on parts 4, 6,
    9 and 12
  • Need to get WG14 CIM changes stabilized into base
    CIM

16
References
  • Official CIM web site is at http//wg14.com (same
    as http//www.cimuser.com), site is supported and
    maintained by UISOL
  • IEC documents available from http//www.iec.ch
Write a Comment
User Comments (0)
About PowerShow.com