EU 5GHz Regulatory Changes - PowerPoint PPT Presentation

About This Presentation
Title:

EU 5GHz Regulatory Changes

Description:

DFS has been under scrutiny in a number of regulatory domains ... This version will be based on version 1.4.1 but in addition it will have the following ... – PowerPoint PPT presentation

Number of Views:29
Avg rating:3.0/5.0
Slides: 9
Provided by: richke
Learn more at: https://grouper.ieee.org
Category:

less

Transcript and Presenter's Notes

Title: EU 5GHz Regulatory Changes


1
EU 5GHz Regulatory Changes
  • Date 2007-11-13

Authors
2
Introduction
  • DFS has been under scrutiny in a number of
    regulatory domains
  • Canada has (at least temporarily) closed the 5600
    5650MHz band to RLANs
  • Japan has tightened test requirements
  • Australia changes still in the works
  • EU has announced planned changes
  • TCAM meeting last week response to weather radar
    complaints
  • Pulse width detection threshold changed
  • Was 1uS
  • Changing to 0.8uS, then 0.5uS
  • Added detection of staggered PRF radars with 3
    PRF values
  • Interim steps include closing 5600 5650MHz band

3
TCAM Proposal
  • From now to 31 March 2008
  • Products placed on the market during this period
    shall as a minimum be compliant with version
    1.2.3 of EN 301 893
  • 31 March 2008 is the DOW (Date of Withdrawal) for
    EN 301 893 version 1.2.3
  • 31 March 2008 is the last day that products
    tested against this version of the standard can
    be placed on the market.
  • In order to continue to place these products on
    the market after 31 March 2008, they shall be
    tested against version 1.3.1 or 1.4.1 of EN 301
    893
  • 1 April 2008 1 July 2008
  • Products placed on the market during this period
    shall be compliant with either, version 1.3.1 or
    version 1.4.1 of EN 301 893

4
TCAM Proposal 2
  • 1 July 2008 31 March 2009
  • Products placed on the market during this period
    shall be compliant with either, version 1.3.1 or
    version 1.4.1 of EN 301 893, AND
  • In addition, when operating within the band 5600
    5650 MHz, they shall be capable of detecting
    Staggered PRF with a maximum of 3 different PRF
    values.
  • This will be added as a footnote in the OJ
    listing (December 2007)
  • Equipment that can not implement the Staggered
    PRF shall not operate in the 5600-5650 MHz
  • But this will not be written in the regulation
    (only in TCAM minutes)

5
TCAM Proposal 3
  • 1 April 2009 to 30 June 2010
  • Products placed on the market during this period
    shall be compliant with version 1.5.1 of EN 301
    893
  • ETSI still need to develop this standard. This
    version will be based on version 1.4.1 but in
    addition it will have the following
  • DFS to detect pulse widths down to 0.8 µSec
    across the bands 5250-5350 and 5470-5725 MHz
  • DFS to detect Staggered PRF across the bands
    5250-5350 and 5470-5725 MHz
  • Solution for the noise calibration of weather
    radars in 5600-5650 MHz
  • This is the 10 min CAC or equivalent

6
TCAM Proposal 4
  • After 1 July 2010
  • Products placed on the market after 1 July 2010
    shall be compliant with version 1.6.1 of EN 301
    893
  • ETSI still need to develop this standard. This
    version will be based on version 1.5.1 but in
    addition it will have the following
  • DFS to detect pulse widths down to 0.5 µSec
    across the bands 5250-5350 and 5470-5725 MHz

7
The Good News
  • TCAM recognizes that weather radar does not have
    requirements to limit its interference in the
    band
  • TCAM is looking for our feedback on specs for the
    weather radars
  • See CEPT/ERC/REC 74-01 Annex 5

8
Summary
  • The EU has addressed shortcomings in EN 301 893
    v1.4.1
  • Equipment put on the EU market must meet these
    requirements at these deadlines
  • After 31March2008 must meet EN 301 893 v1.3.1 or
    1.4.1
  • As of 1July2008 detect staggered PRF (3 PRF
    values) in 5600 5650 MHz band or block the
    band
  • After 31March2009 must also meet EN 301 893
    v1.5.1
  • Detect 0.8uS pulse width across 5250 5350 and
    5470 5725 MHz bands
  • Detect staggered PRF across 5250 5350 and 5470
    5725 MHz bands
  • Include a solution for weather radar noise
    calibration period (10 min CAC)
  • After 31March2010 must meet EN 301 893 v1.6.1
  • Detect 0.5uS pulse width across 5250 5350 and
    5470 5725 MHz bands
Write a Comment
User Comments (0)
About PowerShow.com