Title: Programme 2: Services to Citizens
1Department of Home Affairs
Presentation on the 2004-2005 ANNUAL REPORTto
the DHA Portfolio Committee 26 May 2006
2OVERVIEW
- Presentation objective
- Brief the DHA Portfolio Committee on the
Annual Report 2004/05 and spending patterns - Introduction
- DHA delegation
- Status of Annual Report 2004/05
- Aligning DHA with Government strategic priorities
- Impact of Turnaround Strategy
- Annual Report 2004/05 highlights
- Spending patterns
- Conclusion
3REASON FOR LATE SUBMISSION OF ANNUAL REPORT
2004/05
- Departmental Annual Reports need to be submitted
to the relevant Treasury and Executive Authority
by the end of August and tabled in Parliament
before the end of September - The delay in submission was a result of the
auditing process itself. - As per Section 65 of the PFMA, the Speaker was
advised of the reasons for the delay in October
2005. - The Portfolio Committee was briefed on the
reasons in February and the DHA was present
when the Auditor General subsequently briefed
this Committee and its explanation was again
given. - The final Report of the AG was eventually
delivered on the 19 May 2006 and this enabled the
printing and tabling of the Report.
4ALIGNING HOME AFFAIRS WITH GOVERNMENT STRATEGIC
PRIORITIES
- Main purpose of the five-year strategic
perspective is to align shorter term departmental
planning with the national policy objectives of
Government as a whole. - Clear strategic objectives of Government for the
second decade of freedom provided in January 05
Cabinet Lekgotla and in the 2005 State of the
Nation Address. - Framework for ensuring alignment of DHA with
prime governmental policy thrusts and
requirements.
5ALIGNING HOME AFFAIRS WITH GOVERNMENT STRATEGIC
PRIORITIES
- These can be summarised as
- Economic growth and sustainable development
- Building the capacity of the developmental state
- Service delivery improvements
- Enhancement of social security
- Countering corruption and promoting security
- Improving SA global relations with focus on
Africa and countries of the South - Participating in spatial development initiatives
of Government
¹
6TURNAROUND STRATEGY
TRANSFORMATION
7IMPACT OF TURNAROUND STRATEGY
- DHA is a transforming department!
- DHA bearing the fruits from implementation of
Turnaround Strategy launched in September 2003 - Turnaround Strategy set clear goals in terms of
the way forward and critical change imperatives
in DHA - Objectives and goals were expressed as
programmes milestones formulated and target
dates for implementation set. - Significant progress was achieved
- Turnaround Strategy became the driving force
behind all activities - Turnaround Strategy was incorporated into the
Strategic Plan of DHA - Strategic planning has been institutionalised in
the Department and linked to monitoring and
evaluation of performance
8OVERVIEW OF THE ANNUAL REPORT 2004/2005
9ANNUAL REPORT
- Overview 3 sections
- General Information
- Programme Performance
- Statutory Requirements
- FOCUS ON PERFORMANCE OF 4 PROGRAMMES
- Administration
- Civic Services
- Migration
- Auxiliary and Associated Services
10PROGRAMME 1 ADMINISTRATION
11Annual Report Highlights
- Programme 1 Administration
- Aim To conduct the overall management and
- administration of the Department.
- This programme comprises of the following
- Minister
- Deputy Minister
- Management Services
- Corporate Services
12Annual Report Highlights (contd)
- Programme 1 Administration
- Management Services Objectives
- Strengthening the management team
- Improving integrated governance by integrating
cluster priorities into planning and operations
of the Department - Establishing foreign missions with necessary
capacity thus ensuring efficient and effective
functioning - Improving international relations
- Enhancing service delivery
13Annual Report Highlights (contd)
- Programme 1 Administration
- Management Services Achievements
- Review of business processes was undertaken and
finalised - Draft International Relations Strategy has been
compiled and areas needing strengthening of
bilateral co-operations identified - Integrated governance support structure has been
established - Service delivery initiatives
- Establishment of a Client Service Centre
- Office expansion plan initiated
- Participation in MPCCs country-wide
- Launch of the Client is always right campaign
- Street Agents to combat activities of street
agents
14Annual Report Highlights (contd)
- Programme 1 Administration
- Corporate Services comprises of the following
- Human Resources
- Information Technology
- Legal Services
- Security and Ethical Conduct
- Communication
15Annual Report Highlights (contd)
- Programme 1 Administration
- Corporate Services (Human Resources Objectives)
- Effective and efficient recruitment of employees
- Filling of senior posts and fund current
vacancies - Retaining of professional employees
- Ensuring affirmative action and employment equity
- Terminate use of volunteers and introduce
internship programme - Set up systems and process for organisational and
individual performance management - Improve employee morale
- Resource EAP component
16Annual Report Highlights (contd)
- Programme 1 Administration
- Corporate Services Human Resources Achievements
- Building of Senior Management capacity
- Recruitment of skilled managers to head branches
(27 SMS posts) - Addressing of critical HR capacity within new
structure to achieve strategic objectives /
operational capability - Launch of internship programme (413 appointed)
- Filling of more than 1000 vacant posts
- Development and implementation of comprehensive
training programmes ranging from IT related to
management programmes
17Annual Report Highlights (contd)
- Programme 1 Administration
- Corporate Services Human Resources -
Achievements - Revision of policy
- Retention and Recruitment policy
- Succession plan
- Placement policy
- Delegation of powers and functions to the
Provinces - Draft delegations will be effected in the coming
financial year - Employment Equity Plan in place
- Organisation and individual performance
management alignment
18Annual Report Highlights (contd)
- Programme 1 Administration
- Corporate Services Human Resources Achievements
(cont) - Establishment of a core capacity in the Employee
Wellness Directorate - Director Employee Wellness appointed
- Assistant Director Sport Recreation appointed
19Annual Report Highlights (contd)
- Programme 1 Administration Corporate Services
- Legal Services Objectives
- Harmonising DHA mandates and legislation with the
Constitution - Aligning operational and administrative policy
with DHA legislation and with government policy
directions - Legal Services Achievements
- Amendment of the Immigration Act helps to
reduce litigation and strengthens implementation
of immigration policy - Filling of core positions within the Directorates
20Annual Report Highlights (contd)
- Programme 1 Administration Corporate Services
- Security and Corruption Objectives
- Development and implementation of a counter
corruption plan - Implement Minimum Information Security Standards
- Achievements
- Introduction of Whistle-blowing policy
- Development of Counter Corruption Plan with JCPS
partners - 640 staff members have been vetted
- Introduction of the biometric access control at
Head Office - Security appraisals conducted at most other
offices - Review of the risk management document
21Annual Report Highlights (contd)
- Programme 1 Administration Corporate Services
- Achievements
- Strengthening the fight against corruption
- Establishment of Chief Directorate Counter
Corruption and Security and - Capacitating of Counter Corruption unit
22Annual Report Highlights (contd)
- Programme 1 Administration - Corporate Services
- Communications Objectives
- Develop and sustain a sound internal and external
communication strategy and - Establish sound relationships with local media
- Achievements
- Developed and implemented an internal external
communications strategy - Functions held for editors and senior journalists
- Publication of the Home Blitz, Home Affairs and
updating of Home Affairs website
23Annual Report Highlights (contd)
- Programme 1 Administration
- Corporate Services
- Transformation Objectives
- Transformation Action Plan
- Equity with specific focus on gender
- Achievements
- Recent senior appointments met equity criteria
- Development of a change management strategy and
plan
24Annual Report Highlights (contd)
- Programme 1 Administration
- Corporate Services Finances Procurement
- Objectives
- Improve both the management of budgeting and
financial processes. - Projects initiated
- Roll-out of transversal financial and logistical
systems BAS - Aligning budgeting with the DHA strategic
management processes
25Annual Report Highlights (contd)
- Programme 1 Administration Corporate Services
- Financial Procurement Services Achievements
- Implementation of BAS has been finalised at a
further 41 offices - Ongoing training of officials 206 officials
trained - A draft plan has been approved for the
transformation of procurement
26Annual Report Highlights (contd)
- Programme 1 Administration
- Infrastructure Objectives
- Improving access to Home Affairs services
- Investigate/implement alternative resourcing and
infrastructure - Infrastructure projects and achievements
- National Volunteer Campaign introduced
- Phase 1 50 offices received a facelift in terms
of repairs and painting - Phase 2 Campaign was extended and additional 18
offices painted - 68 Offices have been painted in corporate colours
and minor repairs effected - DHA is involved in national MPCC Steering
Committee chaired by GCIS
27Annual Report Highlights (contd)
- Programme 1 Administration
- Infrastructure projects and achievements (cont)
- Improving infrastructure
- Office refurbishment programme
- Initiation of upgrading of border posts project
- 12 offices have been relocated to newly leased
buildings - New model office built and officially opened at
Khayelitsha - Corporate internal signage provided to DHA
offices - Head Office relocated to improved office
accommodation
28Annual Report Highlights (contd)
- Programme 1 Administration Information
Services - Aim
- To restructure and implement the South African
Identification System coupled with an integrated
biometric identification and verification system
for all citizens and persons wishing to visit /
reside in SA
29Annual Report Highlights (contd)
- Programme 1 Administration Corporate Services
- IT HANIS Reloaded
- 6 subprojects Achievements
- Hanis 1 operational capacity to digitise 70 000
records per day - Back-record conversion site preparation and
installation completed - Population Register - updating population
information. - Immigration Control System Deportation and
Refugee Systems developed (some components
outstanding) - Unique global ID System Technical report
completed and consultation with stakeholders
continuing - ePassports and Smart ID Cards - Funding option
investigation completed
30Annual Report Highlights (contd)
- Programme 1 Administration Corporate Services
- IT Electronic Document Management Systems and
Workflow - Objective To establish an enterprise wide
document management system incorporating
electronic workflow - EDMS implemented for Births, Deaths and Marriages
(BMD) - Tender awarded to deal with backlog of 2 million
documents
31Annual Report Highlights (contd)
- Programme1Administration -Information Services
- IT Electronic Document Management Systems and
Workflow - Achievements
- Online forms implemented Forms accessible
through gateway portal - Tracking and tracing system implemented
Workflow systems available
32Annual Report Highlights (contd)
- Programme 1 Administration Information
Services - IT Enterprise Resource Management
- Objective To develop or acquire and implement
electronic systems that will enable the
integrated management of corporate services
function - Achievements
- Human Resource recruitment system implemented
- IT Helpdesk contracted to SITA
- Transversal systems have been fully decentralised
33Annual Report Highlights (contd)
- Programme 1 Administration Corporate Services
- IT Integrated Client Service Console
- ICSC Achievements
- Requirements definition implemented
- Design and testing of ICSC and development of
tender specifications completed - Requirements met for Tender for Mobile Units and
Deportation Centre (Lindela) - ICSC in place for Refugees and Deportations
systems at Lindela and Refugee Offices
34Annual Report Highlights (contd)
- Programme 1 Administration Corporate Services
- IT Browser based systems
- Objective
- To develop a common front-end application to be
used for access to all internal applications and
systems
35Annual Report Highlights (contd)
- Programme 1 Administration Corporate
Services - Browser based systems Achievements
- Intranet implemented and Management Information
System (MIS) in place - Portal (including Intranet) established
- Website has been continuously upgraded
- User/ front end application developed - Marital
status verification functional - Wide area network (WAN) in place (except to very
remote border posts)
36Annual Report Highlights (contd)
- Programme 1 Administration Information
Services - IT Enterprise Systems Objective
- Upgrade IT infrastructure and technology
platform - Enterprise Systems Achievements
- Master Information Security System (MISP) project
in implementation phase - Office computerisation 98 completed
- Novell system in place
- Development of environment for NIB systems
implemented - Logical architectural model completed
37Annual Report Highlights (contd)
- Programme 1 Administration Information
Services - IT Security Objective
- To ensure data integrity and security throughout
the enterprise and related systems - IT Security Progress
- IT security policy developed
- ISS policies approved for implementation
- Disaster recovery plan HANIS disaster recovery
contract concluded - Encryption system Project and commissioned and
implementation continuing - Access management system Access control system
rolled out in business units
38Annual Report Highlights (contd)
- Programme 1 Administration Information
Services - IT Knowledge Information Management
- Objective To develop and establish KIM capacity
and systems within the Department - Achievements
- Head of Component appointed
- Core Staff appointed
39Annual Report Highlights (contd)
- Programme 1 Administration Information
Services - IT Information Management
- Objective To utilise IT for the management of
information - Achievements
- Data warehouse has been acquired
40Annual Report Highlights (contd)
- Programme 1 Administration Information
Services - IT Change Management
- Objective To ensure that all users of the
departmental IT system are prepared for the
changes in work procedures and the information
technology to be used
41Annual Report Highlights (contd)
- Programme 1 Administration Information
Services - IT Change Management
- Achievements
- Change plan and integration imperatives
implemented - ITingwe (IT revolution) launched
- Training modules developed and implemented
- Departmental information systems and business
processes Business model implemented - IT Policy framework legislation reviewed and
implemented (continuous review)
42Annual Report Highlights (contd)
- Programme 1Administration - Information Services
- Security Systems Objective
- To ensure data integrity and security
throughout the enterprise and related systems - Security Systems Achievements
- ICT security policy developed and fully
implemented - Disaster recovery plan approved
- Encryption system implemented
- Access management system implemented
43- PROGRAMME 2 CIVIC SERVICES
44Annual Report Highlights
- Programme 2 Services to Citizens
- Three sub-programmes
- Travel and passport matters repatriation and
financial assistance of citizens abroad - Citizenship - determining, granting and
forfeiture of citizenship - Population Register (PR) of SA citizens and
foreigners who acquire the rights to permanent
residence in RSA - also registration of births,
marriages and deaths, issuing of IDs and
specialised fingerprint identification services
45Annual Report Highlights (contd)
- Programme 2 Services to Citizens
- Achievements
- Birth registration campaign - 1,4 million
children registered up to the age of 14 years. - DHA in collaboration with the South African Law
Reform Commission continues with the review of
marriage legislation. - Fraudulent Marriages
- Check your marital status campaign was launched
in August 2004, more than 179 000 marriages were
checked, 2 636 alleged frauds detected and 1 977
fraudulent cases successfully expunged. - Customary Marriages Campaign commenced in August
2004, more than 18 000 citizens came forward to
register their customary unions.
46Annual Report Highlights (contd)
- Programme 2 Services to Citizens
- Achievements (continued)
- Permanent Citizen Registration Campaign
- HRSC was commissioned to conduct a country-wide
civic services needs survey. - 69 hospitals were equipped with on-line birth
registration facilities. A total of 27898 births
and 8 520 deaths were registered at these
facilities. - Fully computerised Mobile Units are in an
advanced stage of completion. Preparations for 10
Mobile Units have been launched and 57 will be
launched before the end of 2005/6 financial year
47Annual Report Highlights (contd)
- Programme 2 Services to Citizens
- Achievements (continued)
- Backlogs on unabridged certificates and personal
amendments were curbed by 75 and 93
respectively. - Workflow processes were developed and proposals
in respect of preferred model were formulated. - Procedure manuals were updated with the latest
legislative developments. - Revised death registration procedures implemented.
48Social Information
SUB-PROGRAMME OUTPUTS PERFORMANCE MEASURES ACTUAL PERFORMANCE
PASSPORT TRAVEL MATTERS Issue passports Number of passports issued Tourism passports Child passports Official passports Document for travel purpose Diplomatic passports Temporary passports Emergency passport Crew member certificates Maxi passport Number of passport (old format) renewed 549 025 132 863 4 866 911 1 787 172 184 71 826 242 12 926 1 368
49Social Information (contd)
SUB-PROGRAMME OUTPUTS PERFORMANCE MEASURES ACTUAL PERFORMANCE
CITIZENSHIP Process citizenship applications Number of Naturalisations Renunciations Deprivations Resumptions Citizens by descent registrations Retentions Restorations Approvals to use foreign passport 18 107 397 2 640 7 557 5 738 1 251 7 956
50Social Information (contd)
SUB-PROGRAMME OUTPUTS PERFORMANCE MEASURES ACTUAL PERFORMANCE
POPULATION REGISTRATION Births, Marriages and Deaths Register births, marriages and deaths issue relevant certificates process applications for amendments solemnise marriages designate marriage officers and appoint registering officers Number of registrations Births (under 15 yrs) Marriages - Civil - Customary Deaths Number of certificates issued Births - Abridged - Unabridged Marriages - Abridged - Unabridged 1 481 792 217 030 26 437 533 180 2 299 026 93 323 393 033 31 055
51Social Information (contd)
SUB-PROGRAMME OUTPUTS PERFORMANCE MEASURES ACTUAL PERFORMANCE
POPULATION REGISTRATION Births, Marriages and Deaths Register births, marriages and deaths issue relevant certificates process applications for amendments solemnise marriages designate marriage officers and appoint registering officers Deaths - Abridged - Unabridged Number of personal amendments processed Surnames Majors Surnames Minors Forenames Majors Forenames Minors Insertion of surnames Date of birth 716 726 2 542 17 704 25 171 21 217 18 593 353 49 479
52 53Annual Report Highlights
- Programme 2 Migration
- Aim To Co-ordinate and exercise control over the
admission of - persons into, their residence in and
their departure from - the Republic and for matters concerned
therewith, and to - formulate policy and provide guidance to
operational staff - in this regard.
- Seven sub-programmes
- Permanent and Temporary Residence Permits
- Immigration Advisory Board
- Control of Travellers Ports of entry and Visas
- Aliens Control- Repatriation/ deportation of
illegal foreigners - Refugee Affairs-application and granting of
asylum - Refugee Affairs Appeal Board appeals and
adjudication - Standing Committee on Refugees
54Annual Report Highlights (contd)
- Programme 3 Migration
- Programme Objectives
- Transformation of Immigration
- Review of business processes in the immigration
branch. - Assess the implementation of the Immigration Act
and Regulations - Effectively deter,detect and counter the illegal
entry of foreigners in South Africa - Provide for the reception into RSA of asylum
seekers - Co-ordinate ports of entry operations throughout
the country - Strengthen multi agency intergovernmental
co-operation - Facilitate scarce skills
- Combat Xenophobia
55Annual Report Highlights (contd)
- Programme 3 Migration
- Achievements
- Transformation of Immigration
- DDG, 2 Chief Directors and Director appointed
- Migration structure has been approved (Head
Office) - Business process review has been finalised
- Immigration Legislation
- Immigration Amendment Act was presented to
Cabinet and promulgated - Illegal Foreigners
- Key inspectorate posts were filled
- Bilateral agreements between RSA, Mozambique and
Zimbabwe on reception of deportees in progress
56Annual Report Highlights (contd)
- Programme 3 Migration
- Achievements (cont)
- Refugee Affairs
- 1376 UNCTD were issued from 01 April 2004 to 31
March 2005 - 5354 IDs were issued to refugees
- Border control
- Staff increased at critical ports of entry
- MCS system functional
- Visa regime was reviewed in terms of the
Amendment Act in conjunction with other role
players and is still an ongoing process
57Statistical Information
SUB-PROGRAMME OUTPUTS PERFORMANCE MEASURES / SERVICE DELIVERY INDICATORS ACTUAL PERFORMANCE / QUANTITY
PERMANENT TEMPORARY RESIDENCE AND IMMIGRATION SELECTION BOARD Processing of applications and insurance of permits Permits issued in terms of standards set -Immigration Permits -Work permits -study permits -Temporary residence -Ministerial enquiries 17 771 15 630 25 707 99 678 155
58Statistical Information (contd)
CONTROL OF TRAVELLERS Processing of applications and issuance of visas Clearance of visitors at ports of entry Number of permits issued Number of persons cleared Arrivals Departures 455 445 7 867 586 7 017 653
ALIENS CONTROL Removal of illegal foreigners Deportation of undesirable persons Number of illegal foreigners removed Number of deportations 170 301 1 564
59Statistical Information (contd)
SUB-PROGRAMME OUTPUTS PERFORMANCE MEASURES / SERVICE DELIVERY INDICATORS ACTUAL PERFORMANCE / QUANTITY
REFUGEE AFFAIRS Consideration of asylum applications Issuance of refugee Identity Cards Issuance of United Nations Convention Travel Documents Number of asylum applications finalised Number of Refugee Identity Cards issued Number of United Nations Convention Travel Documents (UNCTDs) issued in collaboration with the UNHCR 1 775 5 348 1 568
60Statistical Information (contd)
REFUGEE APPEAL BOARD Consideration of asylum appeals Number of asylum appeals finalised 1 779
STANDING COMMITTEE ON REFUGEES Review and consider cases Review of manifestly Unfounded cases Consider applications of certification of status 107 269
61 62Overview of 2004/05 Budget Performance
- Allocated budget
- for the year
- BUDGET
- Original allocation
- Rollover and other funds received for salary
adjustments - Total allocation for the year
AMOUNT R2,273,492,000 R104,123,000 R2,377,
615,000
63Overview of the Current Years (2004/05) Budget
and Performance
- Budget in terms of key spending programs
- PROGRAM
- Administration
- Services to citizens
- Auxiliary and associated services
- Total allocation for the year
AMOUNT R501,570,000 R912,401,000
R617,895,000 R2,377,615,000
BUDGET 23,2 50,8 26.0 100
64Overview of the Current Years (2004/05) Budget
and Performance
- Budget according to key spending areas in terms
of the standard charts of accounts (SCOA)
- STANDARD CHARTS OF ACCOUNTS
- Compensation of employees
- Goods and services
- Transfers and subsidies
- Payments for capital assets
- Total allocation for the year
BUDGET 29,7 21,8 22,8 25,7 100
AMOUNT R705 782,000 R518,033,000
R541,625,000 R612,175,000 R2,377,615,000
65Overview of 2004/05 Budget Performance
- Expenditure as at
- 31 March 2006 presented per
program
- PROGRAMME
- Administration
- Services to citizens
- Immigration
- Auxiliary and associated services
- Total
AMOUNT R565,779,000 R557,937,000
R290,214,000 R575,303,000 R1,989,233,000
BUDGET 99,99 68 77 93 83,7
66Overview of the Current Years (2004/05) Budget
and Performance
- STANDARD CHARD OF ACCOUNT
- Compensation of employees
- Goods and services
- Transfers and subsidies
- Payment for capital assets
- Total
- Below norm
- AMOUNT
- R648,772,000
- R572,474,000
- R541,678,000
- R226,309,000
- R1,989,233,000
BUDGET 91,92 110,51 100,01 36,97 83,67 16,
33
- Expenditure as at
- 31 March 2005 presented per SCOA
67WE PLEDGE OUR COMMITMENT AND SUPPORT TO SERVICE
DELIVERY